Originally Posted by Zepfancouver
I believe the elevator core will be build up right up to the 17th floor before any floors and walls are installed. The 18-strorey Brock Commons https://www.youtube.com/watch?v=GHtdnY_gnmE
This afternoon - One week build up of the building core.
|
Not sure if this means they'll do the entire elevator core or start with the steel/mass timber right away.
Quote:
|
With the L3 concrete pour complete, we’re now forming, reinforcing, and pouring the elevator core—an essential step before we move on to the steel structure, mass timber, and prefabricated envelope installation.
|
https://www.instagram.com/p/DHHOTOWzuyS/?hl=en
|