TORONTO - Transit Developments


I concede that planners don't have total control over what gets built where; political and voter concerns often dominate. But if you want to have high density in the suburbs, it should be placed by high capacity transportation lines, right?

The GO Train lines are not high capacity transportation lines tho... there 3 GO Train lines in Mississauga and only one has all-day service, and even that one carries less people per km than the Hurontario buses...

The Mississauga "downtown" is where it is because of the 403 and Square One. The bus route may be successful (it's great that residents are using transit) but it's far from ideal. The good planning of the newer buildings doesn't make up for the fact that the most convenient option for residents is the freeway.

Freeway to where? That freeway won't help "downtown" residents get to Square One, for example. The mall is already right on their doorstep.

Really, local transit probably shouldn't be compared to GO Trains and freeways, which are regional/long distance transport options. They serve a different markets.

Speaking of different markets, only 27% of Mississauga commuters work in Toronto compared to 55% of Mississauga commuters who work within Mississauga. So why concentrate the high density around a paltry commuter rail service instead of local transit?

Getting people to commute locally the key to sustainable urban development anyways. The point of higher density is to reduce travel distances. That's how you get people to walk and bike everywhere too. So to promote long distance transit at the expense of local transit doesn't make sense.
 
The good planning of the newer buildings doesn't make up for the fact that the most convenient option for residents is the freeway.

The most convenient option to go where? The airport? It is certainly not their most convenient option to go to downtown Toronto. Their most convenient way to go do downtown Toronto is by either GO Train or GO Bus. Not by car.
 
I think you overstate car-orientedness of the 905. GO ridership far exceeds the amount of parking space it has. GO has (or will have) 61,000 parking spaces, so roughly only 60% of GO riders (~250,000 boardings = ~100k unique riders?) park-and-ride, assuming that 100% of the parking space is used.
The "0.7 spaces per daily rider" was actually quoting a GO employee giving a presentation I attended; plans for continuous future growth of parking supply to meet future ridership demand seemed a point of pride. I was really struck by what seemed like a deep-seated cultural orientation of the service around serving suburban park-n-riders as its primary market. I'd love to be wrong or be proven overly pessimistic, but it seems there are many hurdles before S-bahn style regional rail service levels will be cost-effective or operable other than on the Lakeshore lines.
 
The "0.7 spaces per daily rider" was actually quoting a GO employee giving a presentation I attended; plans for continuous future growth of parking supply to meet future ridership demand seemed a point of pride. I was really struck by what seemed like a deep-seated cultural orientation of the service around serving suburban park-n-riders as its primary market. I'd love to be wrong or be proven overly pessimistic, but it seems there are many hurdles before S-bahn style regional rail service levels will be cost-effective or operable other than on the Lakeshore lines.

I think the Lakeshore Line is the only line that will get S-bahn (electrified, frequent rapid service) in our lifetimes.
 
Gridlock is costing Toronto up to $11 billion yearly—here’s how to fix it

Read More: http://www.canadianbusiness.com/economy/the-end-of-gridlock/

.....

Metrolinx, Ontario’s transit authority, pegged the cost for the Toronto region alone at $6 billion annually in 2008. That number was too modest. The figure could be $7.5 billion to $11 billion every year, according to new data supplied to Canadian Business by the CD Howe Institute. The higher price tag isn’t based on commutes getting worse over the past five years—although they probably have. Metrolinx’s numbers only considered the costs of gridlock, like businesses spending more to transport goods or having to pay their employees better to tolerate long commutes. But the CD Howe report also recognizes that easing gridlock would create new opportunities by increasing the size of Toronto’s talent pool and consumer base. By not acting, these lost opportunities become lost dollars from our bank accounts.

- If progress is going to be made, we need to stop looking at transit as something we pay for on a project-to-project basis and instead see it as akin to health care or education, a need that requires long-term, sustained funding. Investing in transit isn’t just about saving time—it’s about making money. Carol Wilding, president and CEO of the Toronto Region Board of Trade, says her organization’s 10,000-plus members understand the link between healthy transit and healthy bottom lines. “They consistently rank this as the top economic and competitiveness issue,” she says. People turn down jobs because “they know the cost that it’s going to have on them personally in terms of changing their commute patterns, and therefore the impact that it also has on their family life. They’re just not prepared to make that kind of investment.” Academic literature backs Wilding’s anecdotal evidence. People will spend up to 90 minutes commuting, and that’s effectively the end of a company’s talent pool, explains Benjamin Dachis, author of the new CD Howe study.

- When people start moving faster, you get a bigger consumer base, as well. “We’ve got this huge mass of people who are all able to go to a baseball game or use a subway or an airport, who are all in the same labour market,” Dachis explains. If more people could quickly reach the Rogers Centre, for example, the Blue Jays would see an increase in ticket sales. Together, these benefits add up to another $1.5 billion to $5 billion, his study concludes, in addition to the $6 billion we already knew we were losing. Though he can’t vouch for the accuracy of Metrolinx’s figure, Dachis says the costs are definitely higher than we thought. Even the feds are losing out. An improved economy would allow Ottawa to rake in more income tax—one of the ways in which transit investment offers a return to governments.

- A 2005 study in London examined housing prices after light-rail and subway lines linked previously unconnected areas of the city, and found houses within two kilometres of new stations rose in value by up to 12% more than those further away. Canadians could glean these benefits as well, but that will first require a radical shift in how transit is funded. The current method—year-to-year funding drawn from the existing tax base—is flawed. Consider Edmonton’s dilemma. The city’s proposed $1.8-billion light-rail line will likely face delays due to a $515-million funding gap, despite politicians wanting the line running by 2019. But big construction and engineering companies won’t bid on the project without secure funding, according to Edmonton’s transportation general manager, Bob Boutilier. If the project proceeds in its current state, bidding will be less competitive.

- In 2006, Stockholm introduced a congestion zone around its city centre, adding more buses and bike lines as an alternative. Drivers going through the zone had their licence plates snapped by cameras and were automatically charged. It began with a seven-month trial and a disapproval rating of 75%. But traffic fell by 22%, only to rise again at the end of the pilot project. When asked for their opinion when the trial was over, a majority of Stockholmians voted the tolls into law. Other cities have made a similar choice. New York imposes a 0.375% regional sales tax and multiple business taxes. London has a congestion charge similar to Stockholm’s; motorists driving downtown during business hours pay £10 per day. Even Los Angeles, North America’s most congested city, is ahead of Toronto. In 2008, L.A. voters backed a 30-year regional sales tax of 0.5% to fund a $40-billion transit expansion.

- Indeed, sustained revenue has myriad benefits. In both London and Madrid, predictable funding helped expand the construction sector, and because work was regular, engineers and workers became more familiar with the processes and tools used for building transit; their improved expertise boosted productivity and further drove down costs. Road tolls also reduce gridlock precisely because people would rather not deal with them, says Dachis. Building more roads, meanwhile, does little to help reduce congestion. “When you increase the capacity of something without changing the price, demand usually just fills up that additional capacity.”

.....




End-of-gridlock.jpg
 
Scarborough transit: The answer could be riding on GO

Read More: http://www.thestar.com/news/gta/2013/07/15/scarborough_transit_the_answer_could_be_riding_on_go.html

.....

Transport Action Ontario envisions a souped-up, electrified “surface subway” network. Among the benefits would be a one-seat ride all the way from Morningside Heights and Malvern directly into Union Station for Scarborough commuters.

- The group says its proposed $24.8 billion Regional Rapid Rail system — based on the GO network — would be Toronto’s answer to the London Overground or the S-Bahn in Berlin. Its recommendations are outlined in a 400-page report called “GTHA Regional Rapid Rail: A Vision for the Future,” being released Monday.

- The Transport Action proposal adds 56 stations to the regional transit network; six additional stations on an eighth rail line running through Scarborough to Markham and new underground platforms at Union Station. The electrification, along with a high-tech signaling system, would allow for two-way, all-day service across the region running every four to 10 minutes in the rush hours. “The ‘surface subway’ concept is common in Europe,” said Transport Action president Peter Miasek.

.....




Proposed: http://rrr.transport-action.ca/Maps/NetworkMapGTHARRR.png
 
This sounds really interesting. \currently, there are only four subway/RT lines in Toronto and it does not go outside the amalgamated city's limits. The GTHA is huge an definitely could benefit from an extensive rapid transit system like New York or London. The advacy group has an interesting proposal.
 
Regional transit and local transit are two different things. A subway extension is for local transit. GO is regional.

A lot of those lines shown cannot support a rapid transit level of service anyways. The idea of rapid transit between Barrie and Toronto is absurd. It is a ridiculous proposal.

Note: other than PATH, rapid transit doesn't extend outside New York City limits either.
 
Per Wiki:
Paris metro is 12.1 million, Toronto metro is 5.5 million.
That's a pretty small definition of Toronto though. It doesn't include the separate CMA's for Oshawa, Hamilton, Kitchener-Waterloo, Barrie, Guelph, etc., also served by the GO lines from Toronto. An indication of how poor a comparison it, is that the corresponding area for Paris is 17,174.4 km² compared to only 7,125 km² for Toronto, despite densities in Paris generally being higher.

A better comparison for Toronto is to use the Golden Horseshoe Area for Toronto, which includes much (but not all) of the GO rail lines. Then you have a population of 7.0 million in 10,097.5 km². (or you could use the Greater Golden Horseshoe definition, that includes Barrie, KW, etc., and you get 8.8 million in 31,561.6 km².)
 
Another DRL Proposal or Just Another Gerrymander?

Read More: http://stevemunro.ca/?p=8187#more-8187

.....

“That TTC CEO Andy Byford initiate discussions with appropriate Metrolinx staff to determine the feasibility of using the Georgetown and Lakeshore East Transit GO Transit corridors for the Downtown Relief Line, as part of the Downtown Relief Line environmental assessment.”

- The idea, in brief, is to build a U-shaped route from northern Etobicoke southeast along the Weston rail corridor, through Union Station, out the Lake Shore East corridor to Scarborough Junction, and then north to Kennedy Station. Although it was not part of her motion, Stintz talked about using the rail corridors for an LRT route since Metrolinx was planning to electrify anyhow.

- If a new line is to be built on dedicated tracks, there must be some place to put it. The Weston corridor is already full side-to-side thanks to the extra tracks Metrolinx has added for expanded services and for the UPX to Pearson Airport. Through Union Station, any new service, especially one with a distinct technology, would have to find new space for its tracks, or permanently displace some existing operation. To the east, Metrolinx already plans or has built more capacity in the corridor, and room for a separate line may be hard to come by.

- Any new service on Metrolinx corridors should be provided with mainline compatible equipment such as electric multiple unit cars (EMUs). These are technically the equivalent of a subway car, streetcar or LRV, but built to mainline railway standards. This eliminates issues with locations where, necessarily, the new, local service must cross over existing regional and freight operations (yes, there is still the occasional freight train even though Metrolinx owns the corridors now). It also eliminates issues with cars built to city transit standards (operating voltage, collision strength, platform height, etc.) having to co-exist on a rail corridor.

- The UPX is something of an embarrassment, a line dating from the dark ages of a previous federal government, handed off to a PPP (SNC Lavalin) and finally taken over by the McGuinty government at Queen’s Park as a Pan Am Games project. At least two chances to revisit its design as a premium fare express service have been lost thanks to the project’s charmed state, but it will be difficult if not impossible to create a local Etobicoke-Weston-Downtown service in this corridor without taking over the tracks now designated for the UPX.

- East of Union, indeed even through Union Station, the situation is more complex. The UPX is on the west/south side of the Weston corridor, but a through service must pass through Union, avoid conflict with tracks turning north at the Don Valley (the Richmond Hill corridor, itself slated for considerably improved service), and then arrive at Scarborough Junction on the north side of the rail corridor to turn north to Kennedy without blocking service on the Lake Shore itself. This is an example of the problems caused by linking an east and west “DRL” especially if a non-standard technology like LRT were going to be used in the rail corridor.

- The UPX will have a small yard for its small fleet in Rexdale, but any higher-capacity urban line will need more storage and maintenance facilities somewhere, and this pushes the scope of a first stage electrification beyond what is planned for the UPX. A strong argument can be made that Metrolinx should electrify sooner rather than later, but any scheme for local service on GO trackage should work with the likely rollout first in the Weston corridor to the Airport.

- A line diagonally to the northwest would serve a travel demand that does not now have a direct route to downtown except for a few peak period, peak direction GO trains. As it heads northwest, the Weston rail corridor goes through a widening swath of Toronto that is remote from the subway network. Rapid transit, whatever its form, would be an addition to this part of the city. An important design issue, however, is that most of the proposed stations are not at major employment or residential nodes and this is unlikely to change in the medium term, possibly longer. Railway corridors have their limitations partly because of historic industrial areas and because more attractive development sites exist elsewhere.

- Good feeder bus services and interchanges will be essential, and by implication, the line should be part of the TTC fare grid. By the time anything like this is built, the long-standing and highly artificial separation of GO and TTC as two separate fare structures must end as this is a barrier to GO’s role in supplementing/relieving subway capacity.

- The eastern leg is more of a problem. With a subway interchange at Kennedy (to the presumed, by then, extended Danforth subway), the eastern service could bleed off some subway traffic provided that the interchange were reasonably convenient and service frequent. We have already seen how the supposed problems of a much-simplified LRT-to-subway transfer at Kennedy rank with The Apocalypse for Scarborough riders, and they will need a big incentive to change trains at Kennedy.

- Both halves of this line look to divert riders from the Bloor-Danforth subway, but they do almost nothing to reduce the north-south flow on the Yonge line north of Bloor Station. That has always been the challenge for “downtown relief” — shifting north-south travel away from Yonge Street. Metrolinx recently launched a study of travel in, broadly speaking, the Yonge corridor. This will include not only the existing YUS subway, its northern extensions and the DRL, but also the potential role of the GO corridors.

.....




Bailao_DRL_201307w.jpg
 
That's a pretty small definition of Toronto though. It doesn't include the separate CMA's for Oshawa, Hamilton, Kitchener-Waterloo, Barrie, Guelph, etc., also served by the GO lines from Toronto. An indication of how poor a comparison it, is that the corresponding area for Paris is 17,174.4 km² compared to only 7,125 km² for Toronto, despite densities in Paris generally being higher.

A better comparison for Toronto is to use the Golden Horseshoe Area for Toronto, which includes much (but not all) of the GO rail lines. Then you have a population of 7.0 million in 10,097.5 km². (or you could use the Greater Golden Horseshoe definition, that includes Barrie, KW, etc., and you get 8.8 million in 31,561.6 km².)

My earlier response wasn't limited to just population. I included geography in my reply. The population figures I used listed the "metro" from Wiki for both Toronto and Paris, not the city or urban figures.

Here's all the data, use whatever you think is more appropriate:

Toronto:
City = 2,615,060 and 630 km2 (240 sq mi) and 4,149/km2 (10,750/sq mi)
Urban = 5,132,794 and 1,749 km2 (675 sq mi)
Metro = 5,583,064 and 7,125 km2 (2,751 sq mi)

Paris:
City = 2,243,833 and 105.4 km2 (40.7 sq mi) and 21,289 /km2 (55,140 /sq mi)
Urban = 10,413,386 and 2,844.8 km2 (1,098.4 sq mi)
Metro = 12,161,542[ and 17,174.4 km2 (6,631.1 sq mi)
 
Harper promises funding to extend Toronto's subway line

Read More: http://toronto.ctvnews.ca/harper-promises-funding-to-extend-toronto-s-subway-line-1.1465692

Prime Minister Stephen Harper says his government will help fund a subway extension in Toronto.

Harper didn't say how much money the government will contribute to plans to extend the subway system into Toronto's east-end. He says the amount will be nailed down as the funding gets formally set aside.

The prime minister made the announcement in Toronto with Finance Minister Jim Flaherty and Mayor Rob Ford. Ford says the funding is, in his words, "just what the doctor ordered" to build the extension

.....




image.jpg
 
Wow, Ford just should not be standing beside Harper as it is definitely not flattering to him. Harper is poised, polished and elegant, while Ford looks bored, frumpy, slovenly.

Ford is probably just mad that his attempts to push subways backfired and actually seem to be leading to transit expansion rather than sabotaging transit development like he had hoped. Either that or he's disappointed taxpayer money will be needed after all despite all the urban legends he invented involving private companies just itching to built it on their dime.
 
Ottawa pledges $660-million for Toronto subway extension

Read More: http://www.theglobeandmail.com/news...0-million-for-toronto-subway/article14461616/

A subway extension in Toronto’s east end has taken a big step toward reality, with Ottawa fleshing out its support and the provincial government signalling new flexibility over the route it would take.

- This is the amount requested from council, but still leaves a funding gap of up to several hundred million dollars. A council vote supporting this subway demanded the full $1.8-billion the province had previously set aside for an LRT in the same area. The province has repeatedly insisted that they can provide only $1.4-billion. TTC Chair Karen Stintz noted that council had approved a range of property tax increases, up to 2 per cent, to cover any shortfall in funding. But the province’s new flexibility on the transit line’s route will raise hopes they might also bend on the funding issue.

.....




FNG103_Scarborough_Subway_20130923.JPG
 
Moving Forward Now with The Relief Subway Line: Curbing Gridlock and Connecting Toronto

http://app.toronto.ca/tmmis/viewAgendaItemHistory.do?item=2013.MM41.19

.....

Councillor Josh Matlow, seconded by Councillor John Parker, recommends that:

1. City Council rescind its previous direction in Item EX31.3 in referring motions respecting the Downtown Relief Line to the Chief Planner and Executive Director, City Planning; specifically those motions which had the effect of delegating study of the construction and environmental assessment of a Relief Subway Line to the Chief Planner for consideration in the report scheduled for Planning and Growth Management Committee in November 2013.

2. City Council affirm the Relief Subway Line as Toronto’s next subway expansion priority.

3. City Council request the City Manager and appropriate City officials to seek the necessary approval under the Environmental Assessment Act using the Transit Project Approval Process as set out in Ontario Regulation 231/08, as amended, for the Relief Subway Line.

4. City Council authorize the City Manager to request funding, in full or in part, from Metrolinx to undertake the Environmental Assessment.

5. City Council refer the remaining Toronto Transit Commission and City costs associated with the Relief Subway Line Environmental Assessment to the Budget Committee to be addressed as part of its 2014 budget deliberations.

.....

- This Motion seeks to start the Environmental Assessment process on the Relief Subway Line now so that when funding becomes available the project will be “shovel ready.” City Council and the TTC have previously approved some preliminary work on the Relief Subway Line but this critical infrastructure project has never received the support and momentum of its own independent City Council directive with a commitment to secure the necessary funding to see it through to construction. The Relief Subway Line is too important and complex to carry out with ad hoc approvals and studies.

- There are a number of serious geotechnical and logistical challenges to building a subway through the busy city centre. Near the surface, where we would ideally build stations, there is a tangle of existing pedestrian passageways and utility tunnels. Density and soil conditions may require the construction of a deep tunnel with mined stations, something that has never been tried in Toronto. Simply preparing for this work will be highly complex and may take several years, and we will not know what is necessary or possible until it is complete.

.....
 
The new Toronto Streetcars take to the streets in the next 4 months or so, and major testing was underway yesterday as the new streetcars were pacing up and down Spadina. Unfortunately I didn't grab a photo, although I was there previewing the action, but here is one from Reddit: ethan42 . They will come online for Spadina and Bathurst first in August. Looking forward to seeing them in action.


T1toyuG.jpg


King Street Loop


The 510 Spadina will get the streetcars first, starting with a ceremony on August 31 until November when the last of the old streetcars move elsewhere. Bathurst will come next in December until Spring 2015. The Harbourfront, Dundas, and Queen routes will get theirs in 2015, too. King won't start until 2017, St. Clair in 2018, Downtowner and Kingston Road in 2018 into 2019 and, finally, Carlton in 2019 and 2020.
Some routes, like King and Queen, will take a full year to become fully populated with new streetcars


The number of daytime tests of the new streetcars have noticeably stepped up in recent weeks as the TTC begins training its staff. New photos are posted to Twitter or Instagram of the two test vehicles creeping around the city on an almost daily basis, increasing the sense of excitement of this year's launch.

"Having it out during the day is certainly good exposure for the new streetcar, and it's starting to build some interest and excitement," says TTC spokesman Brad Ross. "We're not doing that testing during the day to solely build interest and excitement, we have to do it for practical reasons."
When the first production vehicles arrive next month, the TTC will begin training staff round the clock, further increasing public exposure


Read More



Streetcar Testing Ramps Up Across Toronto


20140410-Streetcar-Flickr-Night.jpg


20140410-Streetcar-Flickr-StClair.jpg


Bk03wRJCUAE_6Gv.jpg


BkuBN8cIQAAkp3Y.jpg



Production Units coming soon, perhaps a couple of weeks.


On another note, $150 Million dollars in funding for landscaping Eglinton after the crosstown is completed looks to be getting the go ahead from Toronto City Council.

Eglinton%20at%20Golden%20Mile%20--%20after%20the%20LRT.bmp


Eglinton Ave East in Scarborough where the LRT travels above ground
 


Back
Top