Paris Transit Thread


:previous: :psycho: Holy crap! that bus stop itself is worth a visit :haha:. For real, it looks like making regular bus stops boring and retarded.
Let us hope no bored douchebag would vandalize it for their fun...
 
M_17.gif
M13_17.gif
Platform doors update.

Saint-Denis Porte de Paris, done
DSC44091a.jpg


Duroc, in installation (soon done, pictures are a week old).
DSC43830a.jpg


DSC43834a.jpg


Montparnasse-Bienvenue
DSC43838a.jpg


DSC43840a.jpg


Stations where platform doors were planned on line 13.
Ligne13PSD.jpg

Stations done
-Basilique de Saint-Denis
-Saint-Denis Porte de Paris
-Place de Clichy
-Liège
-Saint Lazare
-Miromesnil
-Champs Elysées Clemenceau
-Invalides
-Varennes
-Saint-François Xavier
-Châtillon-Montrouge
 
IdF2_17.gif
IdF2-H_17.gif
RER_17.gif
RER-b_17.gif
Gare du Nord.

Last week we had a strike on the RER B (RATP side).
It means the interconnection between the RATP and SNCF is suspended.
The northern part (SNCF: Gare du Nord - CDG airport/Mitry Claye) depart from the surface suburban platform. We can see a Z50000 next to a MI79
DSC43913a.jpg


DSC43915a.jpg

Gare du Nord, last stop. To go further in the south, passengers should take the RATP RER B on the underground platforms (the usual platforms of the RER B when service is normal).
DSC43916a.jpg


DSC43918a.jpg
 
Beginners Question:

What/why is the need so great to justify the expense of these elaborate platform gates? I can't say I'm a fan in the least. To me they look grossly overbuilt and bulky and do an excellent job at obscuring the grace of many of these Metro stations - not to mention preventing one from viewing the opposite side of the station. As a transport fanatic I love the Paris system with exuberance, but I fear these doors are taking away from the system's charm - not to mention they are not at all trainwatcher friendly. I honestly hope they stay in Paris and don't spread to other systems. One side effect of having cash strapped systems in the US, is that they barely have enough funds to keep a station in a modest state of repair, let alone enough to built platform gates systemwide.

Again to reiterate, why is this so important to RATP?
 
:previous: It is safer, people cannot fall on the track.
It allows a higher speed in station during rush hours, when the platform is crowded, trains cannot run fast approching the station.
Trains running faster approaching the station means a lower time staying in station.
A lower time in station means that higher frequencies are possible.
Higher frequencies mean more capacity.

In a metro network like Paris every second counts in rush hours.
By increasing the frequency from 105s to 90s, we add 15% more capacity on the line.
 
I've seen a few systems with what looked like 1 and 1/2 or 1 and 1/4 meter high gates (about stomach/chest high) which still prevents people from falling but are not as much a visual obstruction to people looking across the station or seeing the trains.
 
^I think that would be a good compromise and is the height I was thinking would have a much reduced affect on closing in the station platform...

What are those systems with shorter gates?
 
The Metro's gates aren't really that bad. They seem very transparent in person. The newer stations built around them (Line 14) are pretty awesome.

I see strong value in platform doors, especially for systems with outdoor stations in cold climates.
 
M_17.gif
M13_17.gif
To show how every second counts, RATP has set up timers on the platform of Saint Lazare.
It clearly indicates to passengers that trains shouldn't stay more than 38 seconds in station in rush hours.
DSC44309a.jpg
 
M_17.gif
M04_17.gif
Mairie de Montrouge (opening planned in late December 2012)
New render
DSC44213a.jpg


Opening of the line 12 to Front Populaire in December 10, 2012.
 
^Why no platform gates at this new station then? One would think a total new build would include a new standard instead being added later at great expense.
 
New tram line planned.
Porte de Choisy - Orly (town center, not the airport).

TPO.png


This tram line will replace the bus line 183, the busiest line in Paris with 57,000 daily passengers.

Porte de Choisy - Orly tram
-10 km
-20 stations
-Between 70,000 and 80,000 passengers per day
-Opening in 2020

Not render yet but this is the bus line 183.
DSC44155a.jpg

Segegrated busway
DSC44143a.jpg


DSC13538a.jpg


DSC44160a.jpg


DSC44162a.jpg

At Porte de Choiy, connection with the T3 and metro line 7.
DSC44178a.jpg


DSC44184a.jpg
 
^Why no platform gates at this new station then? One would think a total new build would include a new standard instead being added later at great expense.
Because there could still be some old MP59 trains running on line 4 at the opening of the station.
No platform doors are planned on line 4, for the moment.
 
Top three busiest stations by rubber-tired lines.

M_17.gif
M01_17.gif

-La Défense: 136,000
-Châtelet: 128,000
-Charles de Gaulle Étoile: 104,000

M_17.gif
M04_17.gif

-Gare du Nord: 139,000
-Châtelet: 136,000
-Montparnasse-Bienvenue: 116,000

M_17.gif
M06_17.gif

-Place d'Italie: 103,000
-Charles de Gaulle Étoile: 100,000
-Montparnasse-Bienvenue: 96,000

M_17.gif
M11_17.gif

-Châtelet: 87,000
-République: 82,000
-Belleville: 57,000

M_17.gif
M14_17.gif

-Saint Lazare: 151,000
-Gare de Lyon: 141,000
-Châtelet: 116,000
 
Those entrances are new to provide a better interchange with the
T_17.gif
T3_17.gif
and
T_17.gif
T13_17.gif
currently under in construction
T3 platforms at Porte de Vincennes, T3est is on the other side of the Avenue.
DSC44348a.jpg
 
Tramway construction

T_17.gif
T1_17.gif


T1.jpg


Currently
Noisy-le-Sec - Gare de Saint-Denis
Opening: 1992 (last extension in 2002)
Length: 12 km
Stations: 26
Daily ridership: 115,000

Extension work
Gare de Saint Denis - Asnières-Gennevilliers-Les Courtilles
Opening: 2012
Length: 4.9 km
Stations: 10
Daily ridership: 43,000


T_17.gif
T2_17.gif


T2.jpg


Currently
Porte de Versailles - La Défense
Opening: 1997 (last extension in 2009)
Length: 13.6 km
Stations: 17
Daily ridership: 115,000

Extension work
La Défense - Pont de Bezons
Opening: 2012
Length: 4.2 km
Stations: 7
Daily ridership: 58,500


T_17.gif
T3_17.gif


T3.jpg


Currently
Pont du Garigliano - Porte d'Ivry
Opening: 2006
Length: 7.9 km
Stations: 17
Daily ridership: 112,000

Extension work
Porte d'Ivry - Porte de Vincennes
Opening: 2012
Length: 4.9 km
Stations: 8
Daily ridership: 65,000


T_17.gif
T13_17.gif


T3est.jpg


Under in construction
Porte de Vincennes - Porte de la Chapelle
Opening: 2012
Length: 9.6 km
Stations: 18
Daily ridership: 90,200


T_17.gif
T5_17.gif


T5.jpg


Under in construction
Saint-Denis Place du 8 Main 1945 - Garges-Sarcelles
Opening: 2012
Length: 6.6 km
Stations: 16
Daily ridership: 30,000


T_17.gif
T6_17.gif


T6.jpg


Under in construction
Châtillon Montrouge - Viroflay Rive Droite
Opening: 2014
Length: 14 km (1.6 km in tunnel)
Stations: 21
Daily ridership: 82,000


T_17.gif
T7_17.gif


T7.jpg


Under in construction
Villejuif Louis Aragon - Athis-Mons
Opening: 2013
Length: 11.2 km
Stations: 18
Daily ridership: 37,000


T_17.gif
T8_17.gif


T8.jpg


Under in construction
Saint-Denis Porte de Paris - Épinay Orgemont - Villetaneuse Université
Opening: 2014
Length: 8.5 km
Stations: 17
Daily ridership: 45,000
 
RER_17.gif
RER-e_17.gif
Extension, schematic drawing of the the three new stations.

Porte Maillot
REREPorteMaillot.jpg


La Défense
REREDefense.jpg


Nanterre la Folie
RERENanterreFolie.jpg
 