Paris Transit Thread


The center of Saint Denis will become a hub of the Paris tram network with three lines serving it.
T_17.gif
T5_17.gif
Work at Marché de Saint-Denis
DSC39522.jpg

Marché de Saint-Denis is the first or last station of the line and it will provide an interchange with the T1.
T1 at Marche de Saint-Denis
DSC39518.jpg


T_17.gif
T8_17.gif
Work at Gare de Saint-Denis
DSC39512.jpg

In this picture we see the tracks of the T8 crossing the tracks of the T1.
This may sound usual in many cities but it will be the first time that two tram lines will do it in Paris.
DSC39514.jpg
 
M_17.gif
M13_17.gif
Platform doors installation

Saint-François-Xavier
DSC38710.jpg

They have done the platform bound to Asnières - Gennevilliers/Saint-Denis
DSC38713.jpg


Varenne
DSC39593.jpg
 
M4extensionmap.jpg


M_17.gif
M04_17.gif
Maire de Montrouge
DSC39751.jpg


DSC39753.jpg


DSC39755.jpg


DSC39760.jpg


DSC39757.jpg


Montrouge and Bagneux have the largest network of quarries in the Paris metropolitan area.
This makes the extension work more difficult.
The second part of the extension (Mairie de Montrouge to Bagneux) was redesigned because of the numberous quarries.

Some pictures of work near Mairie de Montrouge.
carriereMontrouge.jpg
 
Montrouge and Bagneux have the largest network of quarries in the Paris metropolitan area.
This makes the extension work more difficult.
The second part of the extension (Mairie de Montrouge to Bagneux) was redesigned because of the numberous quarries.

Cool!

I remember reading about the Line 7bis which was built in a gypsum quarry. The underground stations are standing on stilts (this is Danube).

426px-Metro_de_Paris_-_Ligne_7_-_Maquette_viaduc_souterrain_station_Danube.jpg

source
 
M_17.gif
M04_17.gif
Extension, part 2.
Mairie de Montrouge to Bagneux.
-1.975km
-2 stations
Start of work in 2014
Opening in late 2019

M4extensionmapstreet-1.jpg


extensionbagnecoupe.jpg


Verdun Sud
Verdunsud.jpg

Old configuration, as I said before, the project was a bit redesigned due to numberous quarries.
Verdunsudava.jpg

New configuration
Vedrumsudapres.jpg


Bagneux
Bagneux.jpg

Old configuration
Bagneuxavan.jpg

New configuration
Bagneuxapres.jpg
 
Jean Nouvel to renovate train hub in heart of Paris
By Bryan Pirolli | January 23, 2012

austerlitz-vue-sous-halle-avec-commerces.jpg


PARIS – The historic train station, Gare d’Austerlitz, is on board to be renovated by Jean Nouvel starting this year. The 600 million euro project, designed to upgrade the station and its surroundings, is projected to continue through 2020.

The Gare d’Austerlitz is one of Paris’s six main train stations. Originally built in 1840, it serves two metro lines, one Paris regional rail, and multiple national trains to the southwest of France. With 23 million passengers per year, the SNCF, France’s railway company, hopes that the new train station will not only facilitate transportation via new high speed lines, but also rejuvenate the neighborhood.
[...]
Gare d’Austerlitz will welcome a new high speed TGV train to Lyon by 2025, making it an even more important transport hub. Brézet said that SNCF is hoping for 50 million travelers per year by 2030, thanks in part to 15,000 more suburban trains.
...

http://www.smartplanet.com/blog/global-observer/jean-nouvel-to-renovate-train-hub-in-heart-of-paris/3153
 
SNCF inaugurates rebuilt Paris St Lazare station
21 March 2012

GUILLAUME Pepy, president of French National Railways (SNCF), today marked the completion of 10 years of work when he inaugurated the rebuilt St Lazare station in Paris. With 1600 trains and 450,000 passengers a day, St Lazare is the second busiest station in France.
The Euros 250m scheme was a public-private partnership between SNCF, which invested Euros 90m, and Klépierre which provided the remaining Euros 160m. Spie Batignolles was the main contractor for the work.

The project involved excavating 20m below the station, which continued to function throughout the work, to create three new levels beneath the existing two subterranean levels. One of the new levels provides a new interchange with the five metro lines and RER Line E which serve St Lazare. The other two are for car parking. The station also features a 200m-long glass-covered passenger circulation area. Below this there are two levels with 80 shops and restaurants.

St Lazare has been equipped with 300 passenger-information screens, and 21 escalators and lifts.
http://www.railjournal.com/newsflash/sncf-inaugurates-rebuilt-paris-st-lazare-station-1551.html

DSC42156a.jpg


DSC42158a.jpg


DSC42208a.jpg


DSC42162a.jpg


DSC42189a.jpg


DSC42187a.jpg


DSC42191a.jpg


DSC42173a.jpg


DSC42192a.jpg


Before the station was more like a maze of dark corridors instead of a big and bright station passenger hall.
In 2008
DSC01754a.jpg


DSC01755a.jpg
 
True, this is a big improvement.

• Video Link


What surprised me the most was that they opened TWO Starbucks coffee inside the station !!!
There were already three shops next to the station (more if you dare walking few hundred meters).

SDaintLazarestarb.jpg
 
Starbucks? I'd rather go to Le Bal...

St-Lazare looks beautiful. I saw it in December before construction was fully finished. The aboveground parts were amazing, but the Metro passageways were still under construction. I walked into an RER entrance and the plaster on the walls was still damp.
 
Why do the announcements on Ligne 1 exclude Spanish as one of the languages when Ligne 14 had French, English, and Spanish, or have they changed 14 to French, English, German, and Japenese too?
 
Languages are different according the line.

Line 1 = French, English, German, and Japanese
Line 3 = French, English and Italian
Line 4 = French, English and Spanish
Line 5 = French, English and German
Line 14 = French, English and Italian

The line 14 used to have Spanish instead of Italian but as the line serve Gare du Lyon (with train from Italy), they changed it.
 
December 15, 2011 was a record day for the RER A with 1,182,000 passengers carried.
________________________________________________

RER_17.gif
RER-a_17.gif
Châtelet-les-Halles
Eastbound platform screen. High frequency ?
DSC42147a.jpg

Train à quai = train at the platform
Train à l'approche = train approaching
________________________________________________

RER_17.gif
RER-a_17.gif
RER-b_17.gif
Châtelet-les-Halles
MI84 of the RER A on the right.
DSC42279a.jpg

Refurbished MI79 of the RER B arriving
DSC42282a.jpg

Doors of the MI79 opened and doors of the MI79 closed
DSC42288a.jpg

Refurbished MI79
DSC42291a.jpg
 
RER_17.gif
RER-b_17.gif
RER-c_17.gif
Massy-Palaiseau
The new building opened.
DSC42370a.jpg


DSC42355a.jpg


DSC42335a.jpg


DSC42325a.jpg

RER B platforms seen from the building
DSC42321a.jpg


DSC42323a.jpg


The walkway is not yet open.
DSC42317a.jpg


DSC42319a.jpg


DSC42425a.jpg


DSC42417a.jpg

RER C platforms seen from the building
DSC42430a.jpg


DSC42435a.jpg
 
RER_17.gif
RER-a_17.gif
Châtelet-les-Halles
Eastbound platform screen. High frequency ?
DSC42147a.jpg

Train à quai = train at the platform
Train à l'approche = train approaching
Rush hour, line A style: an overcrowded train every minute. By the way, it may seem a dumb detail, I know, but I think they need to change these old ass screens still in use in the line A stations. Isn't it exposed enough? The more recent displays feel more comfortable and simply look far sexier.
 
New concept bus stop at Gare de Lyon Diderot in trial (lines 57, 61 and 91 westtbound)
P1020664a.jpg


P1020640a.jpg

Coffee or any other drink ?
P1020641a.jpg


P1020643a.jpg

Bike or Book ?
P1020644a.jpg


P1020653a.jpg


P1020657a.jpg


P1020646a.jpg


P1020652a.jpg


P1020659a.jpg


P1020662a.jpg


P1020663a.jpg
 


Back
Top