[Moncton] Riverview Developments


https://www.youtube.com/watch?v=doglb0eD-t0


I would not be surprised if this were to be completed by Labour Day.

construction projects are famous for looking like they are going at breakneck speed and then they slow down, Having said that, I hope you are correct and the project opens fast.

WHAT impresses me is how fast the new channel formed. I imagine the Bore is going farther and farther up the river because of it.
 
construction projects are famous for looking like they are going at breakneck speed and then they slow down, Having said that, I hope you are correct and the project opens fast.

WHAT impresses me is how fast the new channel formed. I imagine the Bore is going farther and farther up the river because of it.

You can really see how the river is cutting into the bank. It looks like it will get a lot wider over time.
 
https://www.youtube.com/watch?v=mwgW8Rl6gt0

at about 1:10 you can see a flattened area under the bridge i wonder if it will be similar to the other crossing where you can cross under the structure to connect to the walking trails. which would also give access to that area with the trees that they have seemed to preserve for some reason.

It will be interesting to see how it all comes together once they put the finishing touches on everything. It's great that we can watch the progress via these drone videos.
 
https://www.youtube.com/watch?v=mwgW8Rl6gt0

at about 1:10 you can see a flattened area under the bridge i wonder if it will be similar to the other crossing where you can cross under the structure to connect to the walking trails. which would also give access to that area with the trees that they have seemed to preserve for some reason.

I assume this will likely be the case same as on the other bridge. Once the old riverbed is filled in, there’s no reason to think they can’t extend the waterfront trail all the way to the area around the Dobson Arena.
 
I assume this will likely be the case same as on the other bridge. Once the old riverbed is filled in, there’s no reason to think they can’t extend the waterfront trail all the way to the area around the Dobson Arena.

It certainly make sense to extend the trail. No doubt you'll be able to walk onto the bridge sidewalk from the trail, so why not under it to carry on westward.
 
I recommend setting the playback speed to 50%, or pausing often. Appreciate the poster's video and all, but the quick edits are maddening when the eye wants to take so much in.

Totally agree. I found myself rewinding & pausing so I could take a look at what was happening.

One thing that stood out to me was the amount of silt buildup on either side of the ex gate structure. I wonder if they'll just let it fill in and then cover it to create more green space?
 
Totally agree. I found myself rewinding & pausing so I could take a look at what was happening.

One thing that stood out to me was the amount of silt buildup on either side of the ex gate structure. I wonder if they'll just let it fill in and then cover it to create more green space?

Your guess is as good as mine. I suspect they'll just leave it as is, let the silt build up.
 
I went by tides today and the crane was down

Sometimes when they take a mini tower crane down, this means that a full fledged tower crane is on the way to replace it. We'll see............

This recently happened with 66 Weldon and 2430 Mountain Road. I have a suspicion it might also happen with 120 Weldon.
 
Sometimes when they take a mini tower crane down, this means that a full fledged tower crane is on the way to replace it. We'll see............

This recently happened with 66 Weldon and 2430 Mountain Road. I have a suspicion it might also happen with 120 Weldon.

It looks like this used the mini one to set up the concrete of the foundation and underground parking. They had been doing a lot of work on the parking area in the back recently as well, and they now how the retaining wall all around the property. Perhaps they will set the crane up on the now levelled out parking area in the back.
 
It could be a cost thing too. Why pay to use a big one when you don’t need it.

One would think that they're going to install a tower crane at some point. Otherwise, why take down the crane that was there.

And I really like the looks of the retaining wall they built. So glad to see this building going up. That overgrown lot on the main drag wasn't pretty!
 


Back