The bridge will be both wider and longer. I believe the new bridge is about twice as long as the span of the old causeway gates. I agree with you, water flow will be enhanced, and the river will eventually be flushed out to a new width.
Could it have been better? Sure, but this will be a real improvement over what was there previously.
from a DTI article
the bridge portion itself is 240m long
During this phase, a pilot channel will be excavated under the bridge, essentially diverting the flow of the river and widening it to 180 metres from the current 61 metres.