I would not be surprised if this were to be completed by Labour Day.
I admit to being very impressed by the speed and efficiency of the contractors on this major project. :tup:
I would not be surprised if this were to be completed by Labour Day.
https://www.youtube.com/watch?v=doglb0eD-t0
I would not be surprised if this were to be completed by Labour Day.
https://www.youtube.com/watch?v=doglb0eD-t0
I would not be surprised if this were to be completed by Labour Day.
construction projects are famous for looking like they are going at breakneck speed and then they slow down, Having said that, I hope you are correct and the project opens fast.
WHAT impresses me is how fast the new channel formed. I imagine the Bore is going farther and farther up the river because of it.
https://www.youtube.com/watch?v=mwgW8Rl6gt0
at about 1:10 you can see a flattened area under the bridge i wonder if it will be similar to the other crossing where you can cross under the structure to connect to the walking trails. which would also give access to that area with the trees that they have seemed to preserve for some reason.
https://www.youtube.com/watch?v=mwgW8Rl6gt0
at about 1:10 you can see a flattened area under the bridge i wonder if it will be similar to the other crossing where you can cross under the structure to connect to the walking trails. which would also give access to that area with the trees that they have seemed to preserve for some reason.
I assume this will likely be the case same as on the other bridge. Once the old riverbed is filled in, there’s no reason to think they can’t extend the waterfront trail all the way to the area around the Dobson Arena.
It looks like they're doing a lot of road work on the Moncton side of the new bridge as well.
https://www.youtube.com/watch?v=sC-QsuQ_CYM
It looks like they're doing a lot of road work on the Moncton side of the new bridge as well.
https://www.youtube.com/watch?v=sC-QsuQ_CYM
I recommend setting the playback speed to 50%, or pausing often. Appreciate the poster's video and all, but the quick edits are maddening when the eye wants to take so much in.
Totally agree. I found myself rewinding & pausing so I could take a look at what was happening.
One thing that stood out to me was the amount of silt buildup on either side of the ex gate structure. I wonder if they'll just let it fill in and then cover it to create more green space?
Your guess is as good as mine. I suspect they'll just leave it as is, let the silt build up.
I went by tides today and the crane was down
Sometimes when they take a mini tower crane down, this means that a full fledged tower crane is on the way to replace it. We'll see............
This recently happened with 66 Weldon and 2430 Mountain Road. I have a suspicion it might also happen with 120 Weldon.
Could it have something to do with the demand for cranes, they use a smaller crane until a larger becomes available?
It could be a cost thing too. Why pay to use a big one when you don’t need it.