Salt Lake City: Official Development News Thread - Part 4


Status
Not open for further replies.

SLC Projects

Bring out the cranes...
This thread is the fourth installment of the "Salt Lake:Official development news thread"

The original and first thread's last page can be accessed at the following link:

http://forum.skyscraperpage.com/showthread.php?t=115696&page=503


the second thread can be accessed at this link:

http://forum.skyscraperpage.com/showthread.php?t=169428&page=501

the third thread can be accessed at this link:

http://forum.skyscraperpage.com/showthread.php?t=199234&page=501

The Unofficial Salt Lake City Project Rundown List

Disclaimer: Information contained in this Project Rundown List could change at any time, and should not be used for anything other than this forums discussions, and its informational purposes.

http://www.downtownrising.com/


PROPOSED

Convention Center Hotel
Proposed
more info to follow if these guys can EVER get their act together..

The Regent Street Hotel
Proposed
Added: 06/14/2015
Location: Eat-A-Burger site
Other: 14 levels Boutique Hotel, 6 levels condos. 190 hotel rooms and 36 Residential Units with restaurant and lobby 20 story tall with a pavilion for a roof deck. 330 FT. 20-stories total. 8th tallest building when/if finish.
18724571671_05351d18d5_o.jpg



151 Tower
http://www.dixonslc.com/?section=office
Proposed
Updated: 04/30/2014
Floors:18
Other: Tower building proposed by Boyer as part of their recent purchase of the former Questar and adjacent properties to the south and then to the west. A parking structure to the east, mid block, is currently under construction.
Location: 151 S State
13977274906_dfab8878b9_c.jpg

photo credit: Dixon & Associates


Air Hotels
http://airslc.info/
Proposed
Added: 04/30/2014
Location: NW corner of 400 S and West Temple
Other: This 300+ FT 23-story tower ( based off of the rendering below ) could be Salt Lake's next skyscraper that will include a restaurant and a high end night club., roof top pool/club, 350 person multi-use entertainment space. The lot is cleared and the small two story building on the north end is already built and occupied.

2015 Renderings
36818_AirHotel_SE_Day2_zpsmxk1sgpi.jpg



Arrow Press Highrise
Proposed
Added: 08/11/2015
Location: Arrow Press Building site
Other: One of the new plans is to tear down and build a high-rise structure on the site of Arrow Press Square, across from the Salt Palace (and site of the old Dead Goat Saloon and Club DV8). The Downtown Alliance released this artist’s rendering of the concept development:
arrow-press.png



Hardware Station Development
Proposed
Added: 01/10/2016
Location: 155 N 400 W Salt Lake City
Other: Three Buildings, each 5-7 stories
23464099774_c554c0b788_b.jpg

23463327874_4be83c7527_b.jpg

24091562425_edccfba548_b.jpg




Salt Lake City AC Hotel
Proposed
Added: 08/27/2015
Location: Unknown at this time
Other: 10-stories 127 rooms opening 2017
AC.jpg


Utah Theater
Proposed
Added: 11/18/2014
Location: Approx 170 S. Main Street
picture-7.jpg



Wasatch 600 South Apartments
Proposed
Added: 08/11/2015
Location: Approx 616 S. State Street
1rXq2dQ.png




Granite Furniture Block Redevelopment, Phase II
Proposed
Location: McClelland St (10th E) and Sugarmount Drive
Other: South of the completed Phase I Granite Furniture Redevelopment. Across the street from the current terminus of the S-Line Streetcar
22405985192_0029fea8fb_b.jpg

15.12.02-Sugarmont-Southwest-Aerial-View.jpg



Zellerbach Property
Proposed
Floors: 4-stories
Other: Mix use development in South Salt Lake alone the S-line
Location: 2255 South 300 East
Screenshot_2015-09-29-18-21-3601_zpscbvbc5iy.png

Screenshot_2015-09-29-18-20-3702_zps72sbssyb.png



4th & 4th Apartements
Proposed
Floors:5 floors, 122 apartments
Location: NW Corner 400 E 400 S on the former Sizzler site.
1216_4%264-1.1e10d6a66b028c1655d403c06cfb980f.jpg

Image from www.beecherwalker.com



City Creek Center - The Cascade
http://www.citycreekliving.com/
Proposed
Floors:19
Other: Residential Condos. The base has been constructed up to level 2. The residential units above will be constructed as economic conditions and demand grow.
Location: approx 51 West 100 S
tower2.jpg



Social Hall Tower 1
http://www.cowboy.us/citycreekcenter.php
Proposed
Floors: unknown
Other: Residential.On Hold until market demand improves.
Location: NW corner 200 E 100 S



CCC Tower 8
http://www.downtownrising.com/city_creek/
Proposed
Floors: 20ish
Other: Future Planned Tower. Timeline unknown.
Location: NE corner State and 100 S


World Trade Center plaza
http://www.wtcut.com/
Proposed
Floors:Unknown, but RFPs call for a 25-30 floor tower
Address: The location of this rendering shows 200 South and State Street, but no official site has been chosen yet.
Other:Future Planned... looking for 700,000 sq ft of office space. They are looking for a plaza of buildings as well. We could see a smaller 10-15 floor tower on the plaza as well, as seen in the pic. Final renderings have not been released yet.
wtcuzq8.jpg



Wasatch Properties
Proposed
Floors: unknown
Address: 400 South State Street
Other: The developer is in early plans to develop a mixed-use devlopment on the site. In planning phase. Early Preliminary drawings and tentative plans call for a large office tower onsite. Timeline unknown. No updates on this project since the start of the previous thread. There has been no recent news regarding this project.



Hardage Group Redevelopment
http://www.thehardagegroup.com/index.cfm/hotel_development_in_salt_lake_city.htm
Proposed
Location: 400 S 800 E
photo_sub_saltlakecity.jpg



DA Building
Proposed
Location: NE Corner 500 S and Main
Other: County has purchased the parcel at this location and will most likely be selling the former parcel at 600 S and State SW Corner
Image is from the formerly proposed location, no image for 500 S and Main has been released.


UNDER CONSTRUCTION

Ballpark Lofts
Proposed
Updated 11/14/2012
Floors: 4-5
Units: 30 - 40 residential units
Location: 1380 S West Temple
Other: First floor retail, structured parking garage, rooftop garden with patio overlooking Spring Mobile Ballpark. The project sign is no longer on the site.
285.jpg


Liberty Crest
Proposed
Updated 01/10/2016
Floors: 7 stories
Units: 177
Location: 150 S 200 E
Other:
ilio91.jpg



Alta Gateway
Proposed
Updated 01/10/2016
Floors: 4-stories
Units: 277
Location:
Other:
Need to find renderings for


341
Proposed
Other: Developed by Garbett Homes, looks to be Garbett's first city core project. http://www.garbetthomes.com/
Other: Previous proposals on this site, Metro Park West, and Townhomes.
Floors:5-6 floors
Location: 341 S 400 W (between 400 W and Rio Grande St
341_zpsd5a07c85.jpg

341-2_zps81e321bc.jpg





Eco Lofts
http://method-studio.com/work/housing/eco-lofts/
Proposed
Added: 05/19/2014
Location: Approx 440 S 900 E
Other: 6 story building with residential on the top 5, possible retail on the ground floor.
34.jpg

Image from method studios.


Hope Lodge
Under Construction
Address: NW Corner 100 S 400 E
Other: Project by the American Cancer Society. A facility designed for those that come to Salt Lake City from around the state and neighboring states for cancer treatment.
74821_487663807923825_233881205_n.jpg



Seasons at Library Square
Under Construction
Other: Same developers as Seasons at City Creek.
Other: Developers have been into the planning office to discuss the project.
Floors:5 floors
Location: SE corner of 500 S and 300 E
librarysquare.jpg

photo credit: Tuttle & Associates


111 Tower
Under Construction
Updated: 04/30/14
http://111southmain.com/
Floors:23 387'
Other: The Tower being built by City Creek Reserve in conjunction with the Performing Arts Center. Steel has started to rise on the property.
Location: 111 S Main
2akaauw.png



Performing Arts Center
http://utahperformingartscenter.org/
Under Construction
Floors: 3-5
Other: Steel has started to rise on the property.
Location: SE Corner of Main and 100 S
ScreenShot2013-04-17at10753PM_zpsf695733c.png




State Street Plaza
Under Construction
Floors:10 & 7
Location: Approx 251 South State, east side
Other: 180 Units
Picture+11.png

Picture+12.png




SugarHouse block Development
Under Construction
Address: 2100 South & McClelland Street
Other: Mixed use development in sugarhouse. Will include up to 6 stories of offices and 7 stories of condominiums and & retail.
DSCN1473.JPG



ESA Hotels
Under Construction
Address: 100 S between 300 and 400 W directly across the street from Energy Solutions Arena
Other: Two six story hotels, with retail on the first floor, and a parking garage. One Hotel will be a Hyatt House, 137 rooms. The other will be a Courtyard by Marriott, 175 rooms. Hyatt House on the corner of 100 S and 300 W will be the first of the two hotels built.
609_Hyatt_House.742e2eb37abdba63b0880d418d297735.jpg


608_13.11.291ff26847e9a216e731f9c15384ca68.jpg

Images from www.beecherwalker.com


Newhouse Apartments
Under Construction
Location:540 East 500 S
Other Underground Parking is currently under construction
newhouse.jpg





COMPLETED


Broadway Park Lofts
http://www.broadwayparklofts.com/pages/index.php
Under Construction
Floors: three 7-8 story buildings
Other: Completed units in the rear building were auctioned in February 2012 to raise capital, now under new ownership. New ownership applied for a $4.5 million loan for the RDA on 11/13/2012 to pay off purchase financing and use to complete construction of remaining units. 11/14/2012
24201524755_247a905130_b.jpg


600 West Apartments
Under Construction
Location: Approximately 50 N 600 W, east side of the street
Other:Proposed as mixed use, residential and retail. The mural in the rendering is just an example, that will not be the mural on the building.
8635703999_ce6f50224c_b.jpg



Capital Theater- Ballet West academy
Under Construction
Floors: 4
Location: Adjacent to Capital Theater, west side
Other: Funding has been approved, ground breaking should occur in 2012
dt.common.streams.StreamServer.cls




Cowboy Partners SugarHouse Development
Under Construction
Address: Aprox 2150 South McClelland Street
Other: 171 Units with underground parking
Screen+Shot+2013-01-08+at+2.51.34+PM.png\




Denver Street Apartments
Under Construction
Floors:5 floors
Location: 448 E 400 S
13082620Denver20Street20Apartments20-20overall_zpsde4d7ac0.jpg



Encore Apartments
Under Construction
Address: NW Corner 400 S between 500 E and Denver Street.
Other: 189 Units
14403889559_8fa70f80dd_b.jpg



101 Building
Completed
Address: 101 S 200 E
Other 9 floors, plus roof top mechanical and the front tower would be taller.
7693114586_9b8b9815d0_b.jpg



US Federal Courthouse
http://www.tphifer.com/
Completed
Updated: 04/30/2014
Floors:10
Location: NE corner 400 S W. Temple
3553377982_5e70f321d3_o.jpg



Granite Furniture Block Redevelopment
Completed Phase 1
Location: 10th East 2100 S
Picture+1.png

Picture+2.png



Liberty Gateway
Completed
Floors: 5 stories
Location: Approx 500 W and 50 S
Other: 160 Residential units. Project is back on track, should break ground soon.
387967_488787601152382_541500050_n.jpg



CityScape Apartements
Completed
Address: 150 S 400 E
Other: 122 units, amenities will include a rooftop courtyard and spa, business conference center, dog park, outdoor fireplace and barbecue areas.
dt.common.streams.StreamServer.cls



Public Safety Building
Completed
Floors: 4
Location: NE corner 500 S 300 E
490635.jpg



21 & View
http://21andview.com/
Completed
Location: 2100 S and View Street, about 1350 East
Other: 29 Units with two signature office/retail spaces.
21andview1_cropto_916x550.jpg



Lotus Apartments (Formerly the Madeline apartments)
Completed
Location: 338 East South Temple
Other: 84 Units

2D6L_Lotus_Rendering_small.jpg



Eastside Apartments
http://pegdevelopment.com/commercial-developer/30-eastside-apartments
Completed
Floors: 3-6 stories
Location:
Slide35.JPG



The Sugarhouse Aparments
http://sugarhouseapartments.com/
Completed
Location: 2057 South 1200 E
Other: 70 units; Studio, 1 bedroom, 1 bedroom + Den and 2 bedroom units. Fitness Center, rooftop garden and lounge area with gas grill. Looks to be a nice project. These are being developed by the same company that did Urbana.
IMG_4124.jpg




Merrimac Townhomes
Completed
Location: 38 West Merrimac (just south of Spring Mobile Ballpark)
Other: Five town homes on .343 acres.


644 City Station
Completed
Location: Approx 644 West North Temple
Other: 132 units
http://644.punchlinedev.com/
Picture+1.png



Gateway Office building
Completed
Floors:5
Location: North end of Gateway, approx 450 W 50 N
office3ri8.jpg

5751485190_29d1896f18_b.jpg

Broadway Place Apartments (Senior Apartments)
http://pegdevelopment.com/commercial-developer/31-broadway-place-apartments
COMPLETED
Floors: 4 Stories
Location: Approx 550 E 300 S
Slide36.JPG



Rendon Terrace Apartments (Senior Housing)
COMPLETED
Location: Approx 150 North 600 West
Rendon+Court.jpg


Biomat Building
COMPLETED
Location: Approx 620 West North Temple
Picture+2.png




Other projects in the works for Downtown SLC include:

-Large 1,000+ room convention center hotel.
-Over 4,000 residential units planned/under construction in Downtown Area.
-There have been discussions off and on of various towers and mixed use buildings on Block 70.


I believe everything on here is up to date. I removed things in which I couldn't find any information on line about and if they projects still have a web presence I left them.

Last updated 01/10/16 New projects will be added as they appear on the site.
 
Last edited:
Guys,
Feel free to let me know if there's any developments that are not yet listed or if you have any updates to add.
Thanks and enjoy this thread.
 
Hey SLC projects, since we have a new thread, can you check the broken images to make sure there still is an image, and that said image had a file type tag (jpg usually) because that'd what throws off the image embedded thingy. TY
 
Hey SLC projects, since we have a new thread, can you check the broken images to make sure there still is an image, and that said image had a file type tag (jpg usually) because that'd what throws off the image embedded thingy. TY

What images are broken? Everything's showing up on my end.
 
During the last thread Future Mayor has done a great job at keeping up a updated list of projects that for the most part has a rendering to it. I just copy and paste his list from the old thread to this one. As far as I can tell, FM has uploaded these images the right way since I can view them all. Not sure why you can't see them.
The Shark image works. ( but if you don't mind ) can you please remove it. It's very big and takes up a lot of space and it's not on topic. But it does work.
 
None of th images have blue boxes? I checked on my computer and broken images are still there. Oh well :/
 
City Creek store closed

Did you chumps see that "Love Culture" closed at City Creek? They filed for bankruptcy and closed. It was the store closest to The Cheesecake Factory underneath the gym. Apparently, they owed $1.2 million to Taubman.

As always, ignore if old news.
 
None of th images have blue boxes? I checked on my computer and broken images are still there. Oh well :/

Not on my end, but I can't speak for everybody else. Maybe your computer has some kind of a block? Or needs upgrading? Besides that, I just don't know. Sorry.
 
Last edited:
This might also be a good time to get rid of the CCC thread. There is nothing going on there any more.... Also 644 city station has been open for like a year or more... Does that really belong here any more?
 
This might also be a good time to get rid of the CCC thread. There is nothing going on there any more.... Also 644 city station has been open for like a year or more... Does that really belong here any more?

You don't need to "get rid" of a thread. If people don't comment on it, it will over time sink to the bottom. There is no reason to delete it simply because most (yes there are still towers to built) of the project i completed. Additionally, FM's updates of condo sales are telling of the market in the downtown area.
 
May I suggest that we do some clean-up on our proposed projects list?? There are several projects listed that are long dead, or mere fantasy. I nominate:

508SouthTemple
Radi8
Market Station
Wasatch Properties...these projects have been dead since the recession. The Wasatch Properties site has had the new Questar building erected there since the old two-tower rendering was released. These projects are never going to happen.

City Center Lofts
University Station...pure fantasy. There was never even a site for the shipping-container lofts, if I recall. University Station was some architecture student's project, never an actual developer's suggestion.

The Hardage Group project? Isn't that dead? The Brunswick? Any action there in the last couple years?

Missing from the Proposed list:
phase II of Wilmington Gardens in Sugarhouse
the next big apartment complex across 500 West from the Gateway
the Boyer Group's residential development on 200 East.
 
Update on the Eccles Theater (UPAC). At the RDA meeting last night a lot of the talk revolved around the surrounding mid-block streets.

Thanks, very nice. I recommend everyone give a quick read.

However, I did notice, what I assume to be, a typo. Is the theater really only going to cost $160 to construct?? If so, I'd like to make a donation of $155 so that it can be re-named the "George S. and Dolores Doré Eccles and Toys Noiz Theater". ;)
 
Status
Not open for further replies.


Back
Top