***Updated 09/03/2024 - Next update planned for December***
This list only includes projects with a publicly available source for the height or floor count that are at least 200' in height. The listed heights are mostly from the approved and released elevations or the most recent elevations if the project is not yet approved. If elevations are not available, other city permits, city meeting backup files or FAA filings are used. If there are none of those, renderings or public comments from the developer are used.
There are six status types:
Proposed – A project has been announced and/or project documents/permits have been filed with the city
Approved - The City has approved the site plan
Site Demo – At least one structure on the site has been or is being demolished
Site Prep – Dirt is moving or utility work is underway
U/C – Concrete has been poured
On Hold- Developer has stopped work
Projects highlighted in green are underway.
Projects highlighted in yellow were completed during the current calendar year and have been removed from the project count.
Projects highlighted in pink are on hold
Projects highlighted in dark red have no approved site plan and have had no public updates including permit activity for at least a year. They are removed from the list after two years of no updates.
This is a list of 81 projects that are are least 200'.
This is a list of 10 buildings U/C that are over 300'.
This is a list of the 62 completed or topped out buildings in Austin that are over 300'. This is the skyline now.
This is a list of the 66 completed and U/C projects over 300'. This is the skyline in 2025.