  #10201  
Old Posted Apr 16, 2019, 4:03 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,741
Quote:
Originally Posted by bradnixon View Post
Would they announce the 12-day test ahead of time? How do we know they haven't started? I understood there was a lot of train testing over the weekend whereas on most of the past few weekends there was no testing...
Don't know if they plan on announcing the start, but once we start seeing double trains exclusively running on the track during weekdays, that should give us a pretty good indication.

Vast majority of trains running this weekend was singles, but that is what they plan on running during regular weekend service.
     
     
  #10202  
Old Posted Apr 16, 2019, 4:04 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,741
Quote:
Originally Posted by OttawaSteve View Post
I spent some time watching the eastbound arrivals display at Pimisi while they were testing trains on Saturday morning. It looked they were operating a ~3 minute frequency but actual headways varied between 1.5 and 5 minutes.

Also noticed that the arrivals display was quite slow to update/refresh -- e.g. still displaying 1.5 minutes when train was practically arriving in the station; displaying "NOW" for too long after previous train departed, etc.
When I was there Saturday, the south platform at Tunney's was displaying something like 16 minutes and 28 minutes, which made no sense considering the actual frequency.
     
     
  #10203  
Old Posted Apr 16, 2019, 4:57 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is online now
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,679
Quote:
Originally Posted by J.OT13 View Post
Don't know if they plan on announcing the start, but once we start seeing double trains exclusively running on the track during weekdays, that should give us a pretty good indication.

Vast majority of trains running this weekend was singles, but that is what they plan on running during regular weekend service.
Why would having double trains exclusively be a prerequisite to the test period? I would think they would be testing for typical day operations, and won't they have a mix of double and single trains depending on the time of day? Maybe the ability to switch between coupled and uncoupled trains on the fly is part of the testing?
     
     
  #10204  
Old Posted Apr 16, 2019, 5:12 PM
OtrainUser OtrainUser is offline
Registered User
 
Join Date: Jul 2017
Posts: 619
Quote:
Originally Posted by Kitchissippi View Post
Why would having double trains exclusively be a prerequisite to the test period? I would think they would be testing for typical day operations, and won't they have a mix of double and single trains depending on the time of day? Maybe the ability to switch between coupled and uncoupled trains on the fly is part of the testing?
No, OC Transpo already mentioned that coupled trains will be used on weekdays only and single trains on weekends only
     
     
  #10205  
Old Posted Apr 16, 2019, 5:13 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,741
Quote:
Originally Posted by Kitchissippi View Post
Why would having double trains exclusively be a prerequisite to the test period? I would think they would be testing for typical day operations, and won't they have a mix of double and single trains depending on the time of day? Maybe the ability to switch between coupled and uncoupled trains on the fly is part of the testing?
The 12 consecutive day testing will emulate regular service therefore, they won't be testing any sort of scenario beyond regular service. From what I understand, they will exclusively run double trains during the week and singles during the weekend. I believe they determined it would be too laborious to switch to singles during the off-peak periods of the week, opting to reduce frequency instead.

From my understanding, the 12 consecutive days will mean double trains only running during the week, so that should be an indication that they are close, or actively performing the last stage of testing, that elusive 12 days.
     
     
  #10206  
Old Posted Apr 16, 2019, 6:02 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,799
Quote:
Originally Posted by J.OT13 View Post
Don't know if they plan on announcing the start, but once we start seeing double trains exclusively running on the track during weekdays, that should give us a pretty good indication.

Vast majority of trains running this weekend was singles, but that is what they plan on running during regular weekend service.

You're probably right. If we are still seeing some singles during the week, they probably haven't started the 12 days yet.
     
     
  #10207  
Old Posted Apr 16, 2019, 9:02 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by bradnixon View Post
You're probably right. If we are still seeing some singles during the week, they probably haven't started the 12 days yet.
It probably wouldn't happen just before a long weekend anyway, but I was hoping
     
     
  #10208  
Old Posted Apr 17, 2019, 12:22 AM
bartlebooth bartlebooth is offline
Registered User
 
Join Date: Dec 2010
Posts: 480
I noticed today that the red "O" decal has been placed on one of the lanterns at Tunney's. Haven't seen one of those anywhere but Lees so far.

Also, the walls in the trench at Tunney's look unfinished. I thought they were supposed to have a mural? Not sure when/if that is expected to be done.
     
     
  #10209  
Old Posted Apr 17, 2019, 12:51 AM
corynv corynv is offline
Registered User
 
Join Date: Jun 2018
Posts: 171
Does anyone have, or know where i can see, any picture of the OCS at a switch? Specifically the wire that goes between the 2 tracks.
     
     
  #10210  
Old Posted Apr 17, 2019, 1:19 AM
Gat-Train Gat-Train is offline
BANNED
 
Join Date: Nov 2018
Posts: 508
Quote:
Originally Posted by J.OT13 View Post
The 12 consecutive day testing will emulate regular service therefore, they won't be testing any sort of scenario beyond regular service. From what I understand, they will exclusively run double trains during the week and singles during the weekend. I believe they determined it would be too laborious to switch to singles during the off-peak periods of the week, opting to reduce frequency instead.
Wouldn't be a problem if we had gone with driverless trains
     
     
  #10211  
Old Posted Apr 17, 2019, 1:28 AM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by bartlebooth View Post
I noticed today that the red "O" decal has been placed on one of the lanterns at Tunney's. Haven't seen one of those anywhere but Lees so far.

Also, the walls in the trench at Tunney's look unfinished. I thought they were supposed to have a mural? Not sure when/if that is expected to be done.
Not a mural, but coloured glass. I actually was wondering if the unfinished looking walls are really just a protective cover for now.
     
     
  #10212  
Old Posted Apr 17, 2019, 1:35 AM
bartlebooth bartlebooth is offline
Registered User
 
Join Date: Dec 2010
Posts: 480
Quote:
Originally Posted by kmcamp View Post
Not a mural, but coloured glass. I actually was wondering if the unfinished looking walls are really just a protective cover for now.
That makes a lot of sense. I am hoping the finished product gives the trench a bit of life. Everything around Tunney's is so grey.
     
     
  #10213  
Old Posted Apr 17, 2019, 2:23 AM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Quote:
Originally Posted by corynv View Post
Does anyone have, or know where i can see, any picture of the OCS at a switch? Specifically the wire that goes between the 2 tracks.
Good Day.

I recall a video of Tunney's from somebody, but I do not recall who nor when, of a train going through the switch.

Here is a link to two photos over at OTrainFans, The Trains, C-Line Train Test Spotting, pg.1, half way down, from Oc4526 on March 16 :

https://www.otrainfans.ca/forum/topic/64-confederation-line-train-tests-spotting/

This is the reason the pantographs have upsloped edges - the crossing wires will not get snagged, but are smoothly guided up and lifted.

EnJoy!
     
     
  #10214  
Old Posted Apr 17, 2019, 2:31 AM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Truenorth00 View Post
That's my point. It's done on major rapid transit corridors, major destinations and select interchange points. They don't have them at all their sheltered bus stops.

Keep in mind we're fast moving to the world of mobile payments. If you have a smartphone, you can have next bus information at any stop. So you really only need the electronic boards at much busier locations.
When I was in Montreal last December, I noticed one of their bus stops at a relatively minor stop (though on a busy street) had the billboard on the bus shelter replaced with a digital billboard and it would periodically show when the next buses were expected to arrive. That could certainly be one solution.
     
     
  #10215  
Old Posted Apr 17, 2019, 3:18 AM
Gat-Train Gat-Train is offline
BANNED
 
Join Date: Nov 2018
Posts: 508
Quote:
Originally Posted by Truenorth00 View Post

Keep in mind we're fast moving to the world of mobile payments. If you have a smartphone, you can have next bus information at any stop. So you really only need the electronic boards at much busier locations.
And yet we still can't pay our fare by tapping our phone, or even our credit cards.
     
     
  #10216  
Old Posted Apr 17, 2019, 10:38 AM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 28,892
Quote:
Originally Posted by Gat-Train View Post
And yet we still can't pay our fare by tapping our phone, or even our credit cards.
Metrolinx is working on it. They've said less than 5 years last year:


https://www.thestar.com/news/gta/2018/04...e-payments-as-part-of-presto-system.html


And that article says one of the hiccups is that Android phones can support their payments but Apple devices can't.


The new Presto app is alright if you've tried it. Instant validation of a load with NFC.
     
     
  #10217  
Old Posted Apr 17, 2019, 11:07 AM
McC's Avatar
McC McC is offline
Registered User
 
Join Date: Apr 2010
Posts: 3,057
They took down the construction fencing at Bayview during the day yesterday. It’s really nice how open the lower level is after years of feeling squeezed on the paths through the fences and hoarding.
     
     
  #10218  
Old Posted Apr 17, 2019, 9:15 PM
drizzo_613's Avatar
drizzo_613 drizzo_613 is offline
Registered User
 
Join Date: Feb 2006
Posts: 233
__________________
Ott-Gat [The Fraternal Twin Cities]
     
     
  #10219  
Old Posted Apr 17, 2019, 10:14 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,799
Quote:
Originally Posted by McC View Post
They took down the construction fencing at Bayview during the day yesterday. It’s really nice how open the lower level is after years of feeling squeezed on the paths through the fences and hoarding.
Does that mean you can walk straight up the stairs from the O-Train platform to the westbound bus stop?
     
     
  #10220  
Old Posted Apr 18, 2019, 12:07 AM
CanadaGoose CanadaGoose is offline
Registered User
 
Join Date: Sep 2014
Posts: 260
Quote:
Originally Posted by bradnixon View Post
Does that mean you can walk straight up the stairs from the O-Train platform to the westbound bus stop?
yes, that's correct.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 12:33 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.