Quote:
Originally Posted by Kitchissippi
Why would having double trains exclusively be a prerequisite to the test period? I would think they would be testing for typical day operations, and won't they have a mix of double and single trains depending on the time of day? Maybe the ability to switch between coupled and uncoupled trains on the fly is part of the testing?
|
The 12 consecutive day testing will emulate regular service therefore, they won't be testing any sort of scenario beyond regular service. From what I understand, they will exclusively run double trains during the week and singles during the weekend. I believe they determined it would be too laborious to switch to singles during the off-peak periods of the week, opting to reduce frequency instead.
From my understanding, the 12 consecutive days will mean double trains only running during the week, so that should be an indication that they are close, or actively performing the last stage of testing, that elusive 12 days.