Quote:
Originally Posted by officedweller View Post
The guideway will probably be up within 2 years, then track installation and operational testing.
Guideway can't go up until the support columns, bents, etc are in place. Don't underestimate the amount of time that will take over such a long distance, particularly in areas of poor soil conditions.
     
     
  #7322  
Old Posted Jul 16, 2021, 12:59 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by aberdeen5698 View Post
Guideway can't go up until the support columns, bents, etc are in place. Don't underestimate the amount of time that will take over such a long distance, particularly in areas of poor soil conditions.
from what i remember of the Canada Line, the columns in Richmond were going pretty fast. i remember like 1/week being completed; moving like an assembly line.

though i could be misremembering.
     
     
  #7323  
Old Posted Jul 16, 2021, 1:24 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,779
Quote:
Originally Posted by VancouverOfTheFuture View Post
from what i remember of the Canada Line, the columns in Richmond were going pretty fast. i remember like 1/week being completed; moving like an assembly line.
At 30-metre intervals 1 per week would equate to 30 weeks per kilometre. How long was that line again?

I'm not trying to be prescriptive here, I'm just sayin': these things take time.
     
     
  #7324  
Old Posted Jul 16, 2021, 2:00 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,922
Well they will likely start from the west end of the project moving east.

Spoof conditions aren’t too bad around King Edward so that is likely where you will see the first columns take shape.

The marshy farmland in the middle stretch of the project will take longer.

It will be nice to have two mass transit rail projects occurring at once.

Metro Van for the last few decades had been actually building mass transit at a relatively fast pace compared to the rest of Canada, but suddenly over the last couple years Montreal and even Toronto (and surprisingly out of nowhere Ottawa too) seem to have suddenly eclipsed us. I would say Edmonton too, but to be honest I am really happy we aren’t building their current style of mass transit.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #7325  
Old Posted Jul 16, 2021, 3:23 AM
Klazu's Avatar
Klazu Klazu is online now
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,401
I guess they could start building from both ends or even from the middle.

How are they going to deal with the hill east of 168 Street? To my recollection it is a fairly notable one, eh?
     
     
  #7326  
Old Posted Jul 16, 2021, 3:41 AM
SpongeG's Avatar
SpongeG SpongeG is online now
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,009
I was reading up about the evergreen line, it started construction in 2013 and opened in 2016, so just in 3 years and that included a tunnel. So 4 years is doable.

Now I am a little confused as per reading facebook comments, if started in 2022 or later in 2021 would mean 2026 is a possible up and running date? for the complete line to Langley? is it going to be built all in one go or in two phases? People on Facebook are saying it won't be done till 2035 and that 1.3 billion won't be coming until after Trudeau wins the next election.
__________________
belowitall
     
     
  #7327  
Old Posted Jul 16, 2021, 3:52 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,922
Read the articles, ignore the Facebook / social media comments.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #7328  
Old Posted Jul 16, 2021, 3:53 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,616
Quote:
Originally Posted by SpongeG View Post
I was reading up about the evergreen line, it started construction in 2013 and opened in 2016, so just in 3 years and that included a tunnel. So 4 years is doable.

Now I am a little confused as per reading facebook comments, if started in 2022 or later in 2021 would mean 2026 is a possible up and running date? for the complete line to Langley? is it going to be built all in one go or in two phases? People on Facebook are saying it won't be done till 2035 and that 1.3 billion won't be coming until after Trudeau wins the next election.
Pre-construction started in January 2012. And it opened December 2, 2016 so if you want to be really picky that's almost 2017. It's a single phase project now I believe. They seemed to indicate either option could be completed by 2025 but that was with an assumption of a contractor being chosen in early 2021.
     
     
  #7329  
Old Posted Jul 16, 2021, 4:03 AM
bardak bardak is offline
Registered User
 
Join Date: Oct 2010
Posts: 370
Quote:
Originally Posted by Klazu View Post
How are they going to deal with the hill east of 168 Street? To my recollection it is a fairly notable one, eh?
I would assume if it is to high of a grade being elevated they could stretch the decent over a longer length to decrease the grade.
     
     
  #7330  
Old Posted Jul 16, 2021, 4:13 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,082
Quote:
Originally Posted by Klazu View Post
I guess they could start building from both ends or even from the middle.

How are they going to deal with the hill east of 168 Street? To my recollection it is a fairly notable one, eh?
Playing around in Google Earth I see average grades of 5% East of 168th and 6% West of 184th, looks to be a maximum of 7-8% West of 184th.

North Road along the Evergreen Line is about 4% though the guideway there climbs steeper than the road as it turns onto Clarke.

I assume they would just lengthen the hill at the lower end to reduce the grade. I remember 6% max grade for Skytrain, can anyone correct me?
     
     
  #7331  
Old Posted Jul 16, 2021, 4:21 AM
Tvisforme's Avatar
Tvisforme Tvisforme is offline
Registered User
 
Join Date: Sep 2014
Location: Metro Vancouver
Posts: 2,145
I'm curious as to the logistics involved in opening portions of the line earlier, as they become available. There's most likely an efficiency/cost saving in getting everything built first, but adding a station or two to Expo (and likewise to Millennium) a year or so before completion would boost public interest in the project. It might also help smooth out surges in passengers loads along the lines.
     
     
  #7332  
Old Posted Jul 16, 2021, 4:50 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,616
Quote:
Originally Posted by bardak View Post
I would assume if it is to high of a grade being elevated they could stretch the decent over a longer length to decrease the grade.
It's like a 90m drop from the high point along that road down to the river valley so I doubt they'll be able to do much with the pillar columns to reduce the grade.
     
     
  #7333  
Old Posted Jul 16, 2021, 4:57 AM
SpongeG's Avatar
SpongeG SpongeG is online now
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,009
Quote:
Originally Posted by jollyburger View Post
Pre-construction started in January 2012. And it opened December 2, 2016 so if you want to be really picky that's almost 2017. It's a single phase project now I believe. They seemed to indicate either option could be completed by 2025 but that was with an assumption of a contractor being chosen in early 2021.
i wasn't including pre-construction dates just construction dates.
__________________
belowitall
     
     
  #7334  
Old Posted Jul 16, 2021, 5:16 AM
Klazu's Avatar
Klazu Klazu is online now
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,401
Quote:
Originally Posted by madog222 View Post
Playing around in Google Earth I see average grades of 5% East of 168th and 6% West of 184th, looks to be a maximum of 7-8% West of 184th.
Oh wow, it's that steep? They will either have to trench the guideway at the top or build the guideway very high to reduce the grade, or perhaps both! It's going to be exciting to see all of this happen!
     
     
  #7335  
Old Posted Jul 16, 2021, 7:21 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,540
Another factor is how many gantries they'll be using.
The construction process does not need to be linear from just one starting point.
     
     
  #7336  
Old Posted Jul 16, 2021, 7:31 PM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,639
Quote:
Originally Posted by officedweller View Post
Another factor is how many gantries they'll be using.
The construction process does not need to be linear from just one starting point.
Exactly. Have multiple teams, maybe some prebuilding the pillars and guideway segments, others working on the stations.
     
     
  #7337  
Old Posted Jul 16, 2021, 7:39 PM
xd_1771's Avatar
xd_1771 xd_1771 is offline
(daka_x)
 
Join Date: Aug 2010
Location: Metro Vancouver, Canada
Posts: 1,738
The eastern gradient is signed at 7% (you can see that sign on westbound Fraser Highway just before you go down it), but there seems to be room on the north side (where the guideway will be) to come down closer to ground level if absolutely necessary. The western one is not signed but I measured it at around 6%.

I recall from reading a spec sheet that TransLink wants future line design to stick to a 6% maximum grade (the same as Bombardier puts on their spec sheet), but that portions of the current line are built to 6.5% and that new portions could operate at that grade if necessary. At any rate differences of 1-2% shouldn't matter much as it's easy to compensate for that with an elevated guideway, at least that seems to be the case at other places in our system like around 22nd St Station and on KGB up the hill into Surrey.
     
     
  #7338  
Old Posted Jul 16, 2021, 9:55 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,060
Wouldn't operating at 1% above spec cause the trains to wear out faster?
     
     
  #7339  
Old Posted Jul 16, 2021, 10:45 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,540
Good question.
With the linear induction motors, would it just be an electrical strain or just poorer propulsion?
     
     
  #7340  
Old Posted Jul 16, 2021, 10:59 PM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,639
Quote:
Originally Posted by officedweller View Post
Good question.
With the linear induction motors, would it just be an electrical strain or just poorer propulsion?
Could be a case of both. I reckon with power system upgrades, they could probably increase the speed.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 8:11 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.