Quote:
Originally Posted by Luisito
That's pretty cool the line will reach the Edmonton airport.
|
It won't reach the airport until 2050, at the absolute minimum. Too expensive to lay tracks out there, especially when there is nothing built up for 10 km, once it passes 41 Ave SW. My guess is 2055.
The city wants to complete the Valley line by 2028 (spoiler: it won't be on time). The other priority is to build a line out near St.Albert by 2040, which is more of a priority.