Quote:
Originally Posted by gunnar777
Just rode the O-Train confederation line for the first time. Nice system overall but the underground stations smelled like $#!%. Are they still not gonna fix that?
|
The first year or so, they tried a bunch of things to fix it. It was brought up at every single transit commission. At this point, I think they gave up.
Quote:
Originally Posted by Nite
Forgot about Ottawa Trillium Line stage 2 expansion
|
Was initially supposed to open last summer, but that was delayed by an entire year. At the the current pace (doing next to nothing all summer and only picking up for a month in Fall), I'm not confident it will even open next summer. Tracks even even all laid yet.
Meanwhile, the east is going well. Many of the stations are well advanced, much of the tracks are installed, with centenary polls. We've been joking that east might open before south for a while, but now it starting to look like that may actually happen, or at least pretty close.
Note that south is supposed to be a far easier project, that was supposed to open a full 2 years earlier.