Quote:
Originally Posted by Dougler306
The pine island construction as stated above is for an enclosed finish line booth with video reply to monitor the finish line. My co-worker is an avid kayaker and said this will help Regina attract larger international rowing and kayaking events. She used a specific term but with the enclosed finish line, wascana lake will be only a handful of lake venues that allow for this type of competition in Canada she said.
And yes on another note that OCP was released. I'm proud to see the city's short term and long term bicycle plans. I still think interchanges need to be considered at smaller locations in the city. Also encouraging to see that they are attempting to plan for RT but as stated is out of the timeline in this plan. Un able to copy the images and post em
http://www.regina.ca/opencms/export/site...014-04-20-final-policies-and-maps-v2.pdf
|
What the hell, why is Courtney not connected to Dewdney in this plan, is it that arrow.
Why is Fleet St not going over the tracks.
Finally some plans for rail bridges on the Ring Road. Possibly Winnipeg St bridge realignment too.
Do the Argyle St to Rochdale nowwwwwwwwwwwww! It is long overdue. Hate that intersection at Pasqua St and Rockdale. To many bottoming out the suspension on my truck going over that.
The Pasqua and 9Th Ave N interchange should have been do so long ago, how much longer will we have to wait. It has equal or more traffic then the Vic Ave interchange or the Highway 1 interchange. I drive it every day.
I don't think a interchange at Sask drive and Lewvan is needed. Kinda pointless to have and interchange on a road that is not set up to be a no intersection road. Even though it has 2 out of 3 interchanges already.
Twinning Winnipeg St in front of the Staples call center should be easy but now people can just maew done signs.
Sask drive twinning between Broad St and Winnipeg St, another no brainer.
Nice big draft stamp.
Edit: Will fix spelling and grammar and comment when I get back later, late for appointment.