Quote:
Originally Posted by J.OT13
And budget cuts forced upon them by the City. It will be a decade before we get anything close to the pre-pandemic ridership. Line 2 re-opening, if it goes smoothly, will provide a good boost, though I'm sure it will be shut down again before the decade's over for further "upgrades" that should have been done during this shut-down.
|
The on-time, on-budget mantra has come back to bite us badly, although the first part failed anyways.
In order to keep on budget, we required very large trains compared to the existing Citadis model and the wheel assembly was not upgraded sufficiently to match the expanded capacity and expected capabilities of the trains.
Likewise with the Trillium Line, which will be opened at maximum capacity. There is no reasonable upgrade path, which is stupid for what should be a 100 year project. We just keep band-aiding the Trillium Line and maintaining many aspects of the original temporary plan. And Phase 2 will mean that it won't be a strictly student train, which means further closures will be politically unpopular. But we didn't consider this, because that is future politicians' problem.
Funny how the original plan would have provided at least a bit of redundancy and the original street running problems would have been eliminated with the opening of the Confed Line.