Quote:
Originally Posted by swimmer_spe
By that time, there will be other things to worry about. It is no different than the issues with Bloor - Yonge station.
|
And Bloor-Yonge is a mess. The relief line should have been build decades ago. Even then, not quite the same situation. Bloor-Yonge has two transfers, and the transfer is further outside of downtown.
Quote:
Originally Posted by roger1818
It will eventually, but given that prior to Line 2 shutdown the vast majority of those using it were going to/from Carleton, the proportion of Line 2 riders transferring to the Confederation line will be a small. It will gradually grow, but I feel most on here are over estimating it, especially when you consider the effect of WFH. Also, capacity issues at Bayview/Confederation approach, increasing service on the S/E Transitway will help relieve the issue.
Once both Bayview/Confederation and Hurdman/Confederation do eventually reach their breaking point, N/S ridership will be high enough that we can look at a Bank St. Subway as an alternate route downtown, and that would relieve the congestion.
|
For sure, prior to the shut-down, Carleton was the main destination, but with major TOD, a massive new health care complex, an arena, the library and new development, that will change.
With that said, it's not an immediate problem that needs to be solved, but for sure, I think Bank Street should be considered as a relief line for Bayview and Hurdman over the next decades.