Quote:
Originally Posted by YOWetal
Are they achieving 3 minute headways? I think it's way above that though maybe the lower demand and shortage of trains. Wouldn't interlining also make that trickier as you need to zip the two lines together? Whenever I'm on routes that do that in other cities they seem to bunch up and three trains in a row come and then a longer wait (If the theoretical frequency is 2 minutes this is less of an issue as you only wait 5). I'd guess we end up with 8-10 minute peak and 12 minute off peak.
|
There's currently no shortage of trains, but like you said there's just not as much ridership demand and therefore no reason for OC Transpo to put more trains into service. It conveniently also gives RTG a lot of room to breathe and get their act together before Stage 2 opens.
Train bunching happens a lot in cities that have less automated train control systems. Ottawa's trains can effectively drive themselves, and the control system is able to precisely space trains apart to maintain headways. This is especially effective when recovering from service disruptions where trains get really bunched up, and has been demonstrated regularly in Ottawa.