HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Closed Thread

 
Thread Tools Display Modes
     
     
  #16641  
Old Posted Jul 11, 2023, 4:16 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,101
Quote:
Originally Posted by Truenorth00 View Post
To the extent that we're investing in transit in Ottawa, it's going to be for city building and general public mobility.
Is it still city-building if all you're building is in the suburbs and not in the city?
     
     
  #16642  
Old Posted Jul 11, 2023, 4:47 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Uhuniau View Post
Is it still city-building if all you're building is in the suburbs and not in the city?
Like it or not, but the suburbs are part of the city.
     
     
  #16643  
Old Posted Jul 11, 2023, 5:31 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,101
Quote:
Originally Posted by swimmer_spe View Post
Like it or not, but the suburbs are part of the city.
Like it or not, so is the city, is what I'm getting at.

I don't mind the suburbs getting things.

I do mind the suburbs getting all of the things.
     
     
  #16644  
Old Posted Jul 11, 2023, 6:28 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,125
Quote:
Originally Posted by Uhuniau View Post
Is it still city-building if all you're building is in the suburbs and not in the city?
I guess when I drive by the Scott St trench or the Byron Corridor I'm just imagining things....
     
     
  #16645  
Old Posted Jul 11, 2023, 6:41 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,125
Quote:
Originally Posted by J.OT13 View Post
The Confederation and Trillium Lines are ultimately about improving transit for suburbanites.
If this was true, we wouldn't be building a system with 1.4 km station spacing. This entire tangent of discussion started because we were discussing specifically how the system isn't "competitive" enough with driving for suburbanites. So if the improvements are meant for them, somebody should let them know. They don't see it.

Quote:
Originally Posted by J.OT13 View Post
We're just converting what we already have. It's not new transit for the inner Greenbelt.
Amazing how people forget all the effects of the bus congestion in the core, or what expresses buses skipping stops did to service inside the Greenbelt. I have lived along the Transitway and now along the Confederation Line. The O-Train is a notable improvement in frequency and service consistency over buses on the Transitway.

Also, how do you go from saying it's just a conversion to them listing all the improvements and additions here:

Quote:
Originally Posted by J.OT13 View Post
That said, it's not like there's no benefit for the urban area. The Downtown tunnel, Pimisi, Bayview and Corso Italia, the Byron tunnel and two stations are all major improvements for the core however, they are mostly just a side effect of a grand scheme to bring rail to the suburbs.
The biggest improvements are capacity and consistency. You know there's always a train on the Confederation Line every 3-6 mins (8-12 mins on the Trillium Line). You know the train won't skip your stop if the driver doesn't see you wave. You know the stops are only 1-2 km apart, so anywhere along the line is a maximum 15 min walk. And you know, your train won't be caught in 20 mins of traffic in the core, at peak.

Quote:
Originally Posted by J.OT13 View Post
The planned BRTs are about half and half. Inside the Greenbelt will get Baseline and Carling (maybe), but outside the Greenbelt gets Cumberland, Kanata North, Chapman Mills and Stittsville.
Fair. I forgot about those suburban BRTs. Though, they seem closer to just painted bus lanes than what is intended for Carling and Baseline.
     
     
  #16646  
Old Posted Jul 11, 2023, 7:20 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Uhuniau View Post
Like it or not, so is the city, is what I'm getting at.

I don't mind the suburbs getting things.

I do mind the suburbs getting all of the things.
Just because your neighbourhood does not get something, does not mean another cannot either.
     
     
  #16647  
Old Posted Jul 11, 2023, 7:25 PM
originalmuffins originalmuffins is offline
Registered User
 
Join Date: Jun 2018
Location: Ottawa
Posts: 877
The infatuation with speeds comparable to cars makes no sense here. Metros and our LRT system aren't designed for that, especially with our winter climate. It doesn't make sense as a goal or caveat for Stage 3 either, our LRT isn't all of a sudden going to speed up miraculously after Moodie and Algonquin. And BRT isn't going to speed up anything nor is it a more "effective" solution.

The benefits are TOD long-term, reduction of sprawl overall, reliability with consistency, and accessibility. Accessibility meaning you can get to most major places within our metro without having to spend money on a taxi or uber. It also allows better local transit bus services in conjunction to the LRT stations. Effectively, our bus network can efficiently build off those nodes instead of the random mess they are in now.

Those are goals that we should have. That is the value. That is what will drive up ridership, not looking at this as being only a commuter line. It's also much easier to plan bus routes siphoning off the final stage 3 destinations, which then allows the community to grow around secondary-type cores. I don't think we need to have event centres be the reason to build out the network. The whole mess we are in now is because our city didn't adopt a metro or LRT and now we are playing catch-up, so this rhetoric of it's a waste to get the network to be more future-proofed doesn't make sense. We save money in the long-term by getting the commitment now, than spending even more down the road when we realize we do need it. It's the same argument against double tracking the Trillium line, we cheaped out on it and now there's worry about fixing those capacity issues in the future (be it expanding Trillium or a new Bank St tunnel or whatever). All those costs are much more than if we decided to just double track it from before.

A good example of a beneficial add that Stage 3 in terms of accessibility is someone who lives in Riverside South who wants to go to Algonquin College. They would usually take a car because the bus routes currently are atrocious. Instead, they'd hop into LRT from Marketplace and then go directly to Algonquin from there. Or someone who lives near St. Laurent who wants to go to the outlets at Tanger now doesn't need to worry about how much it would cost if they didn't have a car. Yeah sure, it would "take longer", but that person now has a reliable way to get there without having to rent a car, ask someone to take them, or buy a car to rely on. And yes, these are specific scenarios - but there are thousands of them that show why a built out network is better than half-assing it, ignoring the two major areas in our city, and then calling it a day.


Quote:
Originally Posted by swimmer_spe View Post
Like it or not, but the suburbs are part of the city.
Quote:
Originally Posted by swimmer_spe View Post
Just because your neighbourhood does not get something, does not mean another cannot either.
A very good point. I fail to see how this is the suburbs getting all the things. Taking this away literally means these areas get nothing. And taking this away doesn't miraculously mean we're getting any better core projects - because we more than likely won't.

Quote:
Originally Posted by swimmer_spe View Post
And in 30 years, lose all that benefit for 5 years while it is converted. Instead, bite the bullet and build something that does not need to be upgraded in the future. I get the draw of BRT, but if you look long term, it is less appealing. It also doesn't cause TOD, of which is desperately needed.
My point exactly. We also lose 30 years worth of TOD and slowdown of sprawl.

Quote:
Originally Posted by Truenorth00 View Post
If this was true, we wouldn't be building a system with 1.4 km station spacing. This entire tangent of discussion started because we were discussing specifically how the system isn't "competitive" enough with driving for suburbanites. So if the improvements are meant for them, somebody should let them know. They don't see it.



Amazing how people forget all the effects of the bus congestion in the core, or what expresses buses skipping stops did to service inside the Greenbelt. I have lived along the Transitway and now along the Confederation Line. The O-Train is a notable improvement in frequency and service consistency over buses on the Transitway.

Also, how do you go from saying it's just a conversion to them listing all the improvements and additions here:



The biggest improvements are capacity and consistency. You know there's always a train on the Confederation Line every 3-6 mins (8-12 mins on the Trillium Line). You know the train won't skip your stop if the driver doesn't see you wave. You know the stops are only 1-2 km apart, so anywhere along the line is a maximum 15 min walk. And you know, your train won't be caught in 20 mins of traffic in the core, at peak.
To add to this, it's not all suburbanites - there are many who are angry at this whole notion of removing LRT. There is a lot of support for it, and I saw locally in my area that there is more than enough support and angst against those councilors who aren't for it. And the point of capacity and consistency is the big point here. I remember that hell swarm of busses downtown, it made that congestion impossible to deal with.

Quote:
Originally Posted by Uhuniau View Post
Is it still city-building if all you're building is in the suburbs and not in the city?
Yes it is (and we know we aren't just building in the suburbs, but if you build to create more urban environments in the suburbs, then yes it is city building). Because the whole point of wanting something like Stage 3 to happen is that we start solidifying the core more and reduce sprawl. Our city's density was hurt by not adopting density with LRT or metro earlier, so the sprawl went out of control. If you notice, all those "not Ottawa" projects outside the greenbelt are creating more city life, and more urban lifestyle beside the stations. The plans and zoning already show how much improvement just the prospect of adding the final parts of our network adds.

Last edited by originalmuffins; Jul 11, 2023 at 7:39 PM.
     
     
  #16648  
Old Posted Jul 11, 2023, 7:33 PM
originalmuffins originalmuffins is offline
Registered User
 
Join Date: Jun 2018
Location: Ottawa
Posts: 877
Delete.
     
     
  #16649  
Old Posted Jul 11, 2023, 7:41 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by Truenorth00 View Post
If this was true, we wouldn't be building a system with 1.4 km station spacing. This entire tangent of discussion started because we were discussing specifically how the system isn't "competitive" enough with driving for suburbanites. So if the improvements are meant for them, somebody should let them know. They don't see it.
It was the City's intention, doesn't mean they didn't botch it. It would have been politicly impossible to remove existing stations, so they only added two in the Byron tunnel, two that were planned decades ago but never built.

The 1.4 km spacing does show that the City was looking for a more commuter focused system and speed. In no other city are the urban stops more spaced out than suburban ones (Stage 3 in particular, but also when looking at future infill stations).

Quote:
Amazing how people forget all the effects of the bus congestion in the core, or what expresses buses skipping stops did to service inside the Greenbelt. I have lived along the Transitway and now along the Confederation Line. The O-Train is a notable improvement in frequency and service consistency over buses on the Transitway.
I did mention this, and you then go on to criticize me mentioning it:

Quote:
Also, how do you go from saying it's just a conversion to them listing all the improvements and additions here:
The conversion came with improvements to the central section. There's no denying that. it comes with the territory. Ultimately, there's no new service for the inner Greenbelt, just an improvement over what we had (four new stations across Confed and Trillium notwithstanding).

Quote:
The biggest improvements are capacity and consistency. You know there's always a train on the Confederation Line every 3-6 mins (8-12 mins on the Trillium Line). You know the train won't skip your stop if the driver doesn't see you wave. You know the stops are only 1-2 km apart, so anywhere along the line is a maximum 15 min walk. And you know, your train won't be caught in 20 mins of traffic in the core, at peak.
I completely agree. Confed today, and even more so Stage 2, will be a huge improvement for the corridor it serves. a corridor that's been mostly served for 30+ years. Despite the City's intention, the central segments of the line will see more benefit than the suburbs.

As for Trillium, it will stay 12 minute frequencies, not 8. Never 8. The City spent $700 million, and that came with no improvement to service on the existing line other than the addition of Walkley and Corso Italia stations (long planned). They preferred adding double tracked stations in farm fields over increasing the frequencies by even a minute, or adding a second platform to the most TOD intensive station (+hospital) in Ottawa. That is proof of the City's true priorities of serving suburban (and rural) areas.

The O-Train improving service in urban areas and the City focusing more on suburban wants and needs aren't mutually exclusive. Stage 3 would invest Billions on converting bus routes that are already adequate while doing nothing to improve chronically bad urban transit on quickly densifying Carling, Baseline, Bank, Rideau-Montreal (and no, Rideau Station doesn't count).
     
     
  #16650  
Old Posted Jul 11, 2023, 9:45 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,125
Quote:
Originally Posted by J.OT13 View Post
They preferred adding double tracked stations in farm fields over increasing the frequencies by even a minute, or adding a second platform to the most TOD intensive station (+hospital) in Ottawa. That is proof of the City's true priorities of serving suburban (and rural) areas.
Correct me if I'm wrong. Wasn't the choice to double track the extension because of the marginal cost to do so vs. substantial cost and even tunneling to twin the existing corridor?

Quote:
Originally Posted by J.OT13 View Post
The O-Train improving service in urban areas and the City focusing more on suburban wants and needs aren't mutually exclusive. Stage 3 would invest Billions on converting bus routes that are already adequate while doing nothing to improve chronically bad urban transit on quickly densifying Carling, Baseline, Bank, Rideau-Montreal (and no, Rideau Station doesn't count).
I'm not by any means suggesting the city couldn't and shouldn't do more for the actual urban corridors in this city. However, that doesn't in any way mean the the Confederation Line mostly benefits suburbanites and does nothing for those living inside the Greenbelt. Indeed, one could argue the elimination of express buses and forced transfers on to the O-Train is in some ways a downgrade for suburbanites.
     
     
  #16651  
Old Posted Jul 11, 2023, 10:41 PM
TheMeddlingMonke's Avatar
TheMeddlingMonke TheMeddlingMonke is offline
Registered User
 
Join Date: May 2023
Posts: 5
Quote:
Originally Posted by Truenorth00 View Post
Fair. I forgot about those suburban BRTs. Though, they seem closer to just painted bus lanes than what is intended for Carling and Baseline.
At least for Chapman Mills they're planning on median lanes/stations.

Quote:
Originally Posted by originalmuffins View Post
The benefits are TOD long-term, reduction of sprawl overall, reliability with consistency, and accessibility. Accessibility meaning you can get to most major places within our metro without having to spend money on a taxi or uber...

...Those are goals that we should have. That is the value. That is what will drive up ridership, not looking at this as being only a commuter line. It's also much easier to plan bus routes siphoning off the final stage 3 destinations, which then allows the community to grow around secondary-type cores. I don't think we need to have event centres be the reason to build out the network.
I agree with most of your message but these parts in particular. In these discussions I see most focused on people going downtown or to specific events as if those are the only destinations.

Stage 3 would allow for better spaces to be built along the corridor (secondary-type cores) which would become destinations themselves. You can already see hints of this even without the LRT at places such as Marketplace or Longfields as well as in the overall longer-term goals in the Secondary Plans.

Having a reliable system that improves connections to get between these new areas/hubs would be an incredible benefit overall I think.

Last edited by TheMeddlingMonke; Jul 11, 2023 at 11:28 PM.
     
     
  #16652  
Old Posted Jul 11, 2023, 11:18 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,125
^ Excellent points. In these discussions, we often fail to imagine what the future will be like after the current projects are built out. The 2027 post-Stage 2 system with substantially re-arranged bus routes will be substantially different and vastly more useable for more residents.
     
     
  #16653  
Old Posted Jul 12, 2023, 4:12 AM
originalmuffins originalmuffins is offline
Registered User
 
Join Date: Jun 2018
Location: Ottawa
Posts: 877
Quote:
Originally Posted by TheMeddlingMonke View Post
At least for Chapman Mills they're planning on median lanes/stations.


I agree with most of your message but these parts in particular. In these discussions I see most focused on people going downtown or to specific events as if those are the only destinations.

Stage 3 would allow for better spaces to be built along the corridor (secondary-type cores) which would become destinations themselves. You can already see hints of this even without the LRT at places such as Marketplace or Longfields as well as in the overall longer-term goals in the Secondary Plans.

Having a reliable system that improves connections to get between these new areas/hubs would be an incredible benefit overall I think.
Exactly. And that will make us a much more transit dependent city overall... which would be the general purpose of it. We don't need to think how does this get people downtown, we need to realize that this can create a stable network to get people to 90% of where they need to go within the city, while also creating diverse urban places to live with actual density. There is a lot to benefit from this, way more than it seems at the surface.


Quote:
Originally Posted by Truenorth00 View Post
^ Excellent points. In these discussions, we often fail to imagine what the future will be like after the current projects are built out. The 2027 post-Stage 2 system with substantially re-arranged bus routes will be substantially different and vastly more useable for more residents.
Yeah, the fruition of how the city will shape because of these re-arranged bus routes from certain hubs/nodes along the network will be huge in creating a walkable city. It will take time but that is generally my point, the network will be about useability, consistency, and reliability with the benefit of increasing diverse urban hubs across the city and densification. Sure, we aren't going to have a network that is bullet trains throughout Ottawa (which to be fair, is that even necessary?) but those things create more than enough value for Ottawa. We are going to get to 2 million metro population around 2040, we need to start future thinkingm which will actually benefit our city as a whole.
     
     
  #16654  
Old Posted Jul 12, 2023, 11:18 AM
OCCheetos OCCheetos is online now
Registered User
 
Join Date: Aug 2017
Posts: 2,118
Quote:
Originally Posted by YOWetal View Post
So it's fast from South Keys to Bayview? How many are doing that? It's great for Carleton and probably has shifted resident patterns for Carleton students and employees which it can do much faster than an employment noted. Airport to Rideau or Parliament as a different story.
Why does this matter? Students use public transit, they still count.


Quote:
Originally Posted by lrt's friend View Post
Any train that needs to run at an excruciating slow pace is a failure. At times (when I was riding it), you could walk faster.
Unless you can walk from Greenboro to Bayview faster than the train, you're just moving the goalposts here. Do you get this upset any time the train stops to pick up passengers?-- wait I already know the answer, but in the context of the Trillium Line how does this matter?

Quote:
Is this really to be complimented? You gain 3 minutes in frequency to lose 5 minutes in speed. To me, this is a net loss, for a substantial expenditure.
I'm not praising this in isolation, but in the context of "car competitiveness" you still chose the measurably worst example to use to support your argument.


A loss of 5 minutes, is substantial. It is extremely irritating to ride on transit that runs very slowly and both rail lines now have slow sections where this is happening despite having an exclusive right of way. Why should I not complain about these design failures?

Quote:
Perhaps, I am the most persistent, but others have also commented and what about the silent majority who grumble under their breath about this.
An average of 20,000 people per day who used the line daily probably didn't care much.
I used the line to commute nearly every day for years and I certainly didn't think this was such a big issue because it's still extremely competitive with every other mode of transport.

Quote:
I really get annoyed about my words being twisted. I say that the Trillium Line is truly car competitive and then it is said that this means that all transit needs to reach the same level. I did not say that, so why bring it up?
I mean, you tell me, you brought the Trillium Line into this. I'm just as confused as you are.
If I had to guess, it's because you've got some personal vendetta against the modern Trillium Line and didn't really think through how pointless the comparison was.

What else was anyone supposed to infer when you brought up this "40% decrease in speed (40% of 12 minutes........)" in contrast to the 90/30 minute transit/car travel times that sparked the original discussion?

Quote:
However, when we invest in rapid transit, there should be a net gain in transit speed, otherwise, why spend the money?
Capacity? Reliability? Coverage? i.e. the entire reason Stage 2 South exists?

These are all very important reasons to spend money on rapid transit.

Quote:
It may be only a few minutes, but Ottawa seems to get into projects where there is a net loss in speed. Why should I not complain about this?
There's a time and a place.

Quote:
I am a taxpayer and I expect to see value for my money.
So how much money are you willing to spend just to save 5 minutes of travel time? (And no, doubling Walkley for "$20M 2017 dollars" would not guarantee faster end-to-end times).
     
     
  #16655  
Old Posted Jul 12, 2023, 1:03 PM
skyscraperaccount skyscraperaccount is offline
Registered User
 
Join Date: Jun 2023
Posts: 302
Have a question for the transit experts...

What would be the expected frequency of service if (and I'll just pick on Kanata extension since its where i'm from) the LRT stage 3 was built out as currently planned.
     
     
  #16656  
Old Posted Jul 12, 2023, 1:19 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,125
I would expect the trains to split at Lincoln Fields. So frequency would be half of what it is on the central portion. So maybe 6 mins at peak and 10 mins off-peak?
     
     
  #16657  
Old Posted Jul 12, 2023, 1:25 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by Truenorth00 View Post
Correct me if I'm wrong. Wasn't the choice to double track the extension because of the marginal cost to do so vs. substantial cost and even tunneling to twin the existing corridor?
Short answer is yes, but it would still be cheaper to not double track. Money saved could have been re-invest in the norther part the line, or they could have not built Boweville which literally serves no one. On the original line, the only thing that absolutely needed double tracking to actually improve frequency was Walkley. City's estimate for that was about $26 million on a $700 million project. Dow's Lake is a station capacity issue, with major TOD and a massive hospital complex. The Dow's Lake tunnel and bridge over the Rideau will probably never need to be twinned.

Quote:
I'm not by any means suggesting the city couldn't and shouldn't do more for the actual urban corridors in this city. However, that doesn't in any way mean the the Confederation Line mostly benefits suburbanites and does nothing for those living inside the Greenbelt. Indeed, one could argue the elimination of express buses and forced transfers on to the O-Train is in some ways a downgrade for suburbanites.
The City's intention was to benefit suburbanites. The Transitway was built to serve suburban commuters, and now they are converting the Transitway. The grid lock on the Central Transitway was largely an issue for suburban commuters. In the end, I do think it will benefit more the urban residents from Lincoln Fields to Lees more than anyone else.

Quote:
Originally Posted by Truenorth00 View Post
Fair. I forgot about those suburban BRTs. Though, they seem closer to just painted bus lanes than what is intended for Carling and Baseline.
Cumberland is a full on Transtiway from Navan Road to Trim, with maybe a few crossings (Gatineau Rapibus style). Same with Stittsville. Kanata North I think will be similar to Baseline. Carling is bus lanes.

Quote:
Originally Posted by skyscraperaccount View Post
Have a question for the transit experts...

What would be the expected frequency of service if (and I'll just pick on Kanata extension since its where i'm from) the LRT stage 3 was built out as currently planned.
West and South of Lincoln Fields, the frequencies will be split in half. So if the Blair/Trim to Lincoln Fields has 5 minute frequencies, Moodie (or Kanata) and Algonquin (or Barrhaven) will have 10 minutes. It really depends on ridership demand and how much the City is ready to invest in a larger fleet of trains by then, so we don't know for sure. We are told that Confed could have a frequency of up to 1.5 minutes (so 3 minutes on branches), but that's on paper. I doubt that will happen. I'd say 2 minutes on the central corridor, 4 minutes on the branches, is probably the best we can hope for, if the City is ready to invest.

My hope is that by the time Stage 2 opens, we'll have 4/8 and by the time Stage 3 opens 3/6.
     
     
  #16658  
Old Posted Jul 12, 2023, 1:29 PM
YOWetal YOWetal is offline
Registered User
 
Join Date: Oct 2006
Posts: 7,749
Quote:
Originally Posted by Truenorth00 View Post
I would expect the trains to split at Lincoln Fields. So frequency would be half of what it is on the central portion. So maybe 6 mins at peak and 10 mins off-peak?
Are they achieving 3 minute headways? I think it's way above that though maybe the lower demand and shortage of trains. Wouldn't interlining also make that trickier as you need to zip the two lines together? Whenever I'm on routes that do that in other cities they seem to bunch up and three trains in a row come and then a longer wait (If the theoretical frequency is 2 minutes this is less of an issue as you only wait 5). I'd guess we end up with 8-10 minute peak and 12 minute off peak.
     
     
  #16659  
Old Posted Jul 12, 2023, 2:23 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Of course, when you follow the link, the video above the article is from last week when they covered OPS' "statement" claiming the station can't handle crowds.

Quote:
Mayor, OC Transpo pleased with Pimisi Station during Bluesfest

Ted Raymond, CTV News Ottawa
July 11, 2023


Ottawa Mayor Mark Sutcliffe and OC Transpo say they've been pleased to see that there have been no significant issues at Pimisi Station after it was restricted on Canada Day for what authorities said were safety concerns.

Throughout Canada Day, access to Pimisi Station was limited at the behest of Ottawa police and Canadian Heritage officials. When asked why, Ottawa police said in a statement that the current design of Pimisi Station "does not facilitate the efficient handling of substantial crowds," adding that there are insufficient exits in the event of emergencies.

The station has a single platform to serve eastbound and westbound trains, and straddles the Booth Street Bridge. The upper floor, where bus travellers and pedestrians access the station, is small. Police said there was a medical issue on Canada Day in 2022 and that first responders were stymied by the station's design and the crowds.

Shania Twain attracted a record crowd of around 30,000 people to LeBreton Flats last Thursday, and OC Transpo encouraged attendees to make use of the nearby Pimisi Station, which was kept open both before and after the show.

CTV News Ottawa asked OC Transpo for approximate numbers of transit riders leaving LeBreton Flats via Pimisi Station on Friday. In a reply Tuesday, a statement attributed to Raouia Howarth, the city's acting director of transit customer systems and planning, said OC Transpo is pleased with how its service plan is operating during the festival.

"On the evening of Thursday, July 6, 11,700 attendees used Pimisi Station while travelling to Bluesfest," Howarth said.

More than 13,000 people used Pimisi Station when leaving the show, Howarth said, but overflow buses for westbound travellers were still required.

"When exiting the event, 9,000 customers used Pimisi Station and another 4,400 customers travelled westbound via bus," Howarth said.

Ottawa police told CTV News Ottawa over the weekend there were no significant events to report at Pimisi Station that night.

Speaking on Newstalk 580 CFRA's Ottawa at Work with Patricia Boal on Tuesday, Sutcliffe said he believed Pimisi was handling the crowds well.

"I think it's probably better than it might have been portrayed when the story came out after Canada Day about concerns about the volume and what it can handle. I suspect it can probably handle more than people thought," he said.

He wouldn't comment on whether there was a flaw in the design of the station, but said he was open to improvements.

"I know there are discussions happening internally about what potential adjustments or improvements can be made to the station," he said. "We've got to make sure the system can handle a lot of traffic around major events and the evidence seems to suggest that it can."

Bluesfest continues until Sunday. Headline acts this week include Foo Fighters, Mumford and Sons, Charlotte Cardin and Pitbull.
https://ottawa.ctvnews.ca/mayor-oc-transpo-pleased-with-pimisi-station-during-bluesfest-1.6475261
     
     
  #16660  
Old Posted Jul 12, 2023, 2:36 PM
skyscraperaccount skyscraperaccount is offline
Registered User
 
Join Date: Jun 2023
Posts: 302
"When exiting the event, 9,000 customers used Pimisi Station and another 4,400 customers travelled westbound via bus," Howarth said.

Why?
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 5:42 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.