Quote:
Originally Posted by skyscraperaccount
You're telling me that we planned a 3 stage transit system that was to support and grow our community for the next what, 50 years minimum, and no one ever thought about shifting use cases and the impact of technology on ability work from home or work remote? Everyone approving this multi-billion dollar transit system didn't take into account the long term effects of TOD along this future system and projected that maybe downtown wouldn't remain the primary work hub? Gower et al are short sighted.
Build stage 3 and properly feed into it with local bus routes. Stop builiding park and rides and develop those properties. Discourage car commuting by gettig rid of HOV and increasing the cost of vehicle use (parking fees, tolls, licensing etc)
All of a sudden induced demand goes out the window when speaking of building stage 3 but we all believe it exists when building roads.
|
Exactly this, the short sightedness is baffling. And anyone who thinks we will somehow get a bank street LRT or somehow massive injection into our BRT because of them cancelling Stage 3 doesn't understand how difficult it is for Ottawa to get funding at the provincial level. Getting the provincial government to spend on Stage 3 which was already communicated to them, and has completed studies is more likely to happen. If Gower and co lobby to get this taken away, we will get nothing but useless study after study and nothing else in return for no less than a decade.
The economic and long-term city planning benefits of Stage 3 is far greater than we're making it seem. And those saying it's going to be slower than BRT have not taken this current disjointed system because you're effectively foregoing approximately 271,220 (2022 numbers) of our city's metro population from direct access to LRT. We want the whole city to start buying into transit, and we don't get that by alienating our two fastest growing boroughs.
And then there's the issue of TOD and sprawl. Of course we aren't going to get TOD and extreme density right now, but the mentality of saying "Ottawa' central core is all we should care about when building the network" is the big reason we will continue to have this nonsense of sprawl. We've seen the plans in place with just the prospect of stage 3, and the fact is we won't see the benefits right away... but those benefits will be seen over the next 20-25 years.
And then there's the fact of FINALLY being ahead of the curve with building out our network and using today's dollars to do it instead of clamoring to do it and trying to do it when it's more difficult/even MORE costly.
It really makes less sense to be in support of transit but think Stage 3 is only useful as a commuter line, because it wouldn't be. And that brings us to fixing local bus routes within each of the city's boroughs and core areas: it's much much better for local transit to feed off the LRT than not. Or we can stay with what we got, and have them continue to reduce bus service, and take zero improvements to the overall network. I am sure we will see huge investments into bus transit by our current city's councilors or provincial government.