  #11501  
Old Posted Jun 27, 2023, 1:45 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 68,999
TransEd, the company building the Valley Line Southeast LRT expansion, has identified 140 kilometres of oxidized copper signalling cables that need to be replaced, which will delay the project further. In a news release, TransEd said replacing the cables now will allow it to run the line more reliably and reduce “future operational impacts.” The company will cover the costs as per its public-private partnership contract with the city. Spokesperson Dallas Lindskoog said the repairs are expected to take six to eight weeks and that while the oxidized cables don’t present a safety issue, the company is investigating why new cables are already corroding. Mayor Amarjeet Sohi said he was beyond frustrated by the latest discovery. “This LRT project should have been in service in 2020 and here we are in 2023, and that’s absolutely unacceptable,” Sohi said. There is still no launch date for the line, which has already been delayed four times.

Taproot
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #11502  
Old Posted Jun 28, 2023, 6:23 PM
buildings buildings is offline
Registered User
 
Join Date: Aug 2020
Posts: 47
surprising that they went with copper and not fibre.
     
     
  #11503  
Old Posted Jun 28, 2023, 6:59 PM
EdmTrekker EdmTrekker is offline
Registered User
 
Join Date: Jul 2006
Posts: 5,246
Quote:
Originally Posted by buildings View Post
surprising that they went with copper and not fibre.
Likely what the P3 electrical engineer specified? or the City base line spec required? I wonder what the City is using on the City owned Capital line.
     
     
  #11504  
Old Posted Jun 28, 2023, 9:04 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 68,999
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #11505  
Old Posted Jun 29, 2023, 12:33 AM
RetiredGuy RetiredGuy is offline
Registered User
 
Join Date: Oct 2019
Posts: 60
Thanks for the link Coldrsx. Insightful.

I wonder how much truth there is concerning the letter that was read in the clip? If the city had asked for a pier design not used anywhere else, is the city not partly responsible? I agree with Cartmell that it was TransED's responsibility to design and make noted adjustments if they felt it was needed. I did a google search of elevated train piers and did not find any piers that looked like ours. Lots of Y shaped piers but none missing the wedge. Of course that is not exhaustive or meaningful but whenever you introduce something different than what has been done before, there is risk, is there not?

I hope there is an independent audit on this.
     
     
  #11506  
Old Posted Jul 3, 2023, 9:29 PM
stilicho's Avatar
stilicho stilicho is offline
In Edmonton
 
Join Date: Feb 2021
Posts: 107
Quote:
Originally Posted by Coldrsx View Post
I didn't watch the entire thing but for those who don't want to click, it's local media presenter Ryan Jespersen with Councillors Cartmell and Knack. Around the 29 minute mark they begin talking about the contrast they see with Marigold versus TransEd. More communication and such although they feature an injured worker before moving on to downtown crime.

The question I didn't hear asked or answered was whether the experience level in building projects like this was comparative, superior or inferior to the brain trust at TransEd. I think this is important. It seems that the South-East branch was designed and constructed by relative newbies to the mass transit infrastructure business.

How many mass transit infrastructure projects have Marigold's constituent companies completed? Where are they? We don't need "perfection" as Knack carefully warns but a track record can reveal a lot about expectations.
     
     
  #11507  
Old Posted Jul 6, 2023, 1:26 AM
CMD UW's Avatar
CMD UW CMD UW is offline
Urbis Maximus
 
Join Date: Feb 2002
Location: Edmonton
Posts: 12,006
Quote:
Originally Posted by stilicho View Post
I didn't watch the entire thing but for those who don't want to click, it's local media presenter Ryan Jespersen with Councillors Cartmell and Knack. Around the 29 minute mark they begin talking about the contrast they see with Marigold versus TransEd. More communication and such although they feature an injured worker before moving on to downtown crime.

The question I didn't hear asked or answered was whether the experience level in building projects like this was comparative, superior or inferior to the brain trust at TransEd. I think this is important. It seems that the South-East branch was designed and constructed by relative newbies to the mass transit infrastructure business.

How many mass transit infrastructure projects have Marigold's constituent companies completed? Where are they? We don't need "perfection" as Knack carefully warns but a track record can reveal a lot about expectations.
The two other main partners with Marigold are Colas and Parsons.

Looks like Colas has extensive experience designing and engineering 'complex' railway projects.
https://www.colas.com/en/group/our-activities

Parsons looks to have some depth too.
https://www.parsons.com/transportation/
__________________
"Call me sir, goddammit!"
     
     
  #11508  
Old Posted Jul 6, 2023, 6:50 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 68,999
Neat, but I'm not sure I'd want to live in those lofts now.





https://marigoldinfra.ca/project/section-one/
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #11509  
Old Posted Jul 7, 2023, 4:38 PM
Black Star Black Star is offline
BANNED
 
Join Date: Jun 2010
Location: Edmonton
Posts: 7,259
Welp....I knew this was going to happen. I just got the call to Inspect the LRT Piers for Weld cracks and structural engineering. I will post a couple picks when I'm up in the man basket. This should be interesting lol.
     
     
  #11510  
Old Posted Jul 7, 2023, 9:47 PM
Harrison's Avatar
Harrison Harrison is offline
A Better Place
 
Join Date: Jan 2007
Location: Edmonton
Posts: 3,078
Quote:
Originally Posted by Black Star View Post
Welp....I knew this was going to happen. I just got the call to Inspect the LRT Piers for Weld cracks and structural engineering. I will post a couple picks when I'm up in the man basket. This should be interesting lol.
Uh oh, are these for the piers that have already been 'fixed'? Let's hope it's just double checking that work, if so, and not for inspecting new issues...
__________________
Bingo bango bongo
     
     
  #11511  
Old Posted Jul 7, 2023, 11:16 PM
EdmTrekker EdmTrekker is offline
Registered User
 
Join Date: Jul 2006
Posts: 5,246
I wonder which party requested the inspection.

Last edited by EdmTrekker; Jul 7, 2023 at 11:30 PM.
     
     
  #11512  
Old Posted Jul 7, 2023, 11:29 PM
Hardhatdan Hardhatdan is offline
Registered User
 
Join Date: Jan 2003
Posts: 4,328
Weld cracks on concrete piers...

Inspect structural engineering...

Seems right.
     
     
  #11513  
Old Posted Jul 8, 2023, 11:27 PM
Black Star Black Star is offline
BANNED
 
Join Date: Jun 2010
Location: Edmonton
Posts: 7,259
Quote:
Originally Posted by Hardhatdan View Post
Weld cracks on concrete piers...

Inspect structural engineering...

Seems right.
I guess I could enlighten you. But I'm NOT paid to entertain trolls. Its to much energy. But Hey bud...sounds like you really don't know to much. Maybe sit the next couple conversations out
     
     
  #11514  
Old Posted Jul 8, 2023, 11:31 PM
Black Star Black Star is offline
BANNED
 
Join Date: Jun 2010
Location: Edmonton
Posts: 7,259
Quote:
Originally Posted by EdmTrekker View Post
I wonder which party requested the inspection.

City of Edmonton. They are now being Proactive I guess. Welds on the support braces are visually cracking and there is a host of other deficiencies that are arising. From a another Engineer that had concerns, there are MANY other problems that are now relevant!! Yikes.

BTW, I called this last year lol.
     
     
  #11515  
Old Posted Jul 9, 2023, 2:03 AM
EdmTrekker EdmTrekker is offline
Registered User
 
Join Date: Jul 2006
Posts: 5,246
Quote:
Originally Posted by Black Star View Post
City of Edmonton. They are now being Proactive I guess. Welds on the support braces are visually cracking and there is a host of other deficiencies that are arising. From a another Engineer that had concerns, there are MANY other problems that are now relevant!! Yikes.

BTW, I called this last year lol.
My take (now that you shared this) is this matter is headed to immediate mediation under terms of the contract but will end up in court sooner than than this project is turned over - as the failed piers may/likely require replacement.This could take another 2 years to replace, maybe longer ... as some/all?existing piers may need to be removed and some tracks possibly realigned and constructed. While this is all happening the P3 team is fighting it out with the Structural Engineering firm who is trying to blame the constructor of the piers if the shit will stick. Meanwhile the City is fucked and the public will set their eyes on the current city council.
     
     
  #11516  
Old Posted Jul 9, 2023, 3:10 AM
Hardhatdan Hardhatdan is offline
Registered User
 
Join Date: Jan 2003
Posts: 4,328
Quote:
Originally Posted by Black Star View Post
I guess I could enlighten you. But I'm NOT paid to entertain trolls. Its to much energy. But Hey bud...sounds like you really don't know to much. Maybe sit the next couple conversations out
Can you at least use the right 'too', or even describe the problem so it makes sense?

What are you a Level 3 weld inspector? Are you actually an engineer? A material tech?
     
     
  #11517  
Old Posted Jul 9, 2023, 3:13 AM
Hardhatdan Hardhatdan is offline
Registered User
 
Join Date: Jan 2003
Posts: 4,328
Quote:
Originally Posted by EdmTrekker View Post
My take (now that you shared this) is this matter is headed to immediate mediation under terms of the contract but will end up in court sooner than than this project is turned over - as the failed piers may/likely require replacement.This could take another 2 years to replace, maybe longer ... as some/all?existing piers may need to be removed and some tracks possibly realigned and constructed. While this is all happening the P3 team is fighting it out with the Structural Engineering firm who is trying to blame the constructor of the piers if the shit will stick. Meanwhile the City is fucked and the public will set their eyes on the current city council.
In pretty sure the structural engineer age the contractor are one in the same. It's a joint venture.
How exactly is the city fucked?
     
     
  #11518  
Old Posted Jul 9, 2023, 12:12 PM
stilicho's Avatar
stilicho stilicho is offline
In Edmonton
 
Join Date: Feb 2021
Posts: 107
Quote:
Originally Posted by CMD UW View Post
The two other main partners with Marigold are Colas and Parsons.

Looks like Colas has extensive experience designing and engineering 'complex' railway projects.
https://www.colas.com/en/group/our-activities

Parsons looks to have some depth too.
https://www.parsons.com/transportation/
Each has experience in mass transit infrastructure.

Colas has completed rail projects in Egypt, Vietnam, and Poland. Parsons has completed a few design and engineering challenges including a P3 project in Chicago. That project focused on grade separation so they might be back in Edmonton when we have to rebuild the segment of line at the 104 Avenue and 109 Street intersection.

Thanks for the links.
     
     
  #11519  
Old Posted Jul 9, 2023, 12:28 PM
stilicho's Avatar
stilicho stilicho is offline
In Edmonton
 
Join Date: Feb 2021
Posts: 107
Quote:
Originally Posted by Coldrsx View Post
I warned people this was going to happen. They are planning to forbid left turns on 104 Avenue at those two intersections and probably several others.

If you live in Oliver and drive to or from downtown or Oliver Unity Square your commute is going to be different.

I saw an elderly couple stopping at the light to cross 104 Avenue the other day and I asked them if they were excited that a new LRT line was going to be built right down the middle of the road. They looked at me and laughed and shook their heads in disbelief.

About a quarter of Oliver's residents are over the age of 60 and there are several old age homes within striking distance of the new tramway.
     
     
  #11520  
Old Posted Jul 10, 2023, 1:51 PM
feepa's Avatar
feepa feepa is offline
Change is good
 
Join Date: Oct 2005
Posts: 8,552
Quote:
Originally Posted by Black Star View Post
I guess I could enlighten you. But I'm NOT paid to entertain trolls. Its to much energy. But Hey bud...sounds like you really don't know to much. Maybe sit the next couple conversations out
The troll calling others trolls. How cute.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Edmonton
Forum Jump



Forum Jump


All times are GMT. The time now is 9:39 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.