HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Reply

 
Thread Tools Display Modes
     
     
  #2201  
Old Posted Jun 15, 2023, 3:18 PM
giallo's Avatar
giallo giallo is offline
be nice to the crackheads
 
Join Date: Apr 2002
Location: Vancouver
Posts: 12,747
Quote:
Originally Posted by jollyburger View Post
Why are all the cars going in reverse?
A strange Vancouver phenomenon indeed.
Reply With Quote
     
     
  #2202  
Old Posted Jun 18, 2023, 3:55 PM
Lexus's Avatar
Lexus Lexus is offline
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,846
2023, June 17

Granville, East section, about 1/2 TBM ring deep

IMG_1983 by Lexus LX600, on Flickr

IMG_1984 by Lexus LX600, on Flickr

Hospital, East section, bottomed and the floor will be complete in the coming week to be ready to meet TBMs

IMG_1985 by Lexus LX600, on Flickr

IMG_1986 by Lexus LX600, on Flickr

IMG_1987 by Lexus LX600, on Flickr

City Hall, West section, was very busy, I think the pouring concrete on the very western section

IMG_1988 by Lexus LX600, on Flickr

You can see both TBMs

IMG_1989 by Lexus LX600, on Flickr

Middle of the platform, looking West

IMG_1990 by Lexus LX600, on Flickr

IMG_1992 by Lexus LX600, on Flickr

Mount pleasant box

IMG_1993 by Lexus LX600, on Flickr

IMG_1994 by Lexus LX600, on Flickr
Reply With Quote
     
     
  #2203  
Old Posted Jun 21, 2023, 6:49 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,207
The province provided Vancouver is Awesome with otherwise unreleased pictures and video, the video includes installation of a liner segment. https://www.vancouverisawesome.com/local...broadway-subway-tunnel-vancouver-7172909




Photos from BC MOTI https://www.vancouverisawesome.com/local...broadway-subway-tunnel-vancouver-7172909

TBM cutter head undergoing overhaul.



Images from Brendan Kergin https://www.vancouverisawesome.com/local...broadway-subway-tunnel-vancouver-7172909
Reply With Quote
     
     
  #2204  
Old Posted Jun 21, 2023, 8:01 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,768
Nice, thanks for posting!
Reply With Quote
     
     
  #2205  
Old Posted Jun 23, 2023, 12:41 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,207
^above video now on youtube

• Video Link
Reply With Quote
     
     
  #2206  
Old Posted Jun 23, 2023, 3:09 PM
FarmerHaight's Avatar
FarmerHaight FarmerHaight is offline
Peddling to progress
 
Join Date: Jul 2019
Location: Vancouver's West End
Posts: 1,631
Quote:
Originally Posted by madog222 View Post
^above video now on youtube
RMTransit posted a video on the Eglinton West extension TBM a few weeks ago. The setup looks almost identical to the Broadway TBM, and he goes into more depth on the machine.

• Video Link
__________________
“Nothing compares to the simple pleasure of riding a bike” – John F Kennedy
Reply With Quote
     
     
  #2207  
Old Posted Jun 29, 2023, 10:44 PM
Unregistered User Unregistered User is offline
Registered User
 
Join Date: Sep 2018
Posts: 40
Spoil conveyer belt was moving today. Not very much spoil on it, though.
Reply With Quote
     
     
  #2208  
Old Posted Jun 30, 2023, 2:16 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,207
Quote:
Originally Posted by Unregistered User View Post
Spoil conveyer belt was moving today. Not very much spoil on it, though.
Thanks for the heads up.
I passed by the Cambie site where Phyllis has moved forward significantly, the tail end is visible in front of the No Frills. Measuring on Google Earth I estimate the cutter head is around 30-40m off the wall at Cambie. Elsie is still in the same position near the No Frills.
Reply With Quote
     
     
  #2209  
Old Posted Jun 30, 2023, 6:38 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,780
Quote:
Station construction underway at Great Northern Way-Emily Carr Station site (click to view detailed notice)

Over the summer of 2023, various activities will be taking place, including:
the construction of the station entrance building section, starting with excavation and shoring work
followed by the pouring of the concrete foundation, walls and columns, and then the concourse level
Simultaneously, removal of tunnel soil from tunnel boring activities continues via the conveyor system through 2023.
https://www.broadwaysubway.ca/construction/current-work/
Reply With Quote
     
     
  #2210  
Old Posted Jun 30, 2023, 3:23 PM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888
Anyone have a source for this info?

Maybe has been noted before but will tunnel boring machines be disassembled and removed by crane when they reach Arbutus?

Main motivation here is re-use of the machines? They don't want to leave them underground? (by drilling past the Arbutus station platform until they are out of the way).
Reply With Quote
     
     
  #2211  
Old Posted Jun 30, 2023, 3:31 PM
Changing City's Avatar
Changing City Changing City is offline
Registered User
 
Join Date: Nov 2016
Posts: 8,314
Arrow

Quote:
Originally Posted by Jimbo604 View Post
Anyone have a source for this info?

Maybe has been noted before but will tunnel boring machines be disassembled and removed by crane when they reach Arbutus?

Main motivation here is re-use of the machines? They don't want to leave them underground? (by drilling past the Arbutus station platform until they are out of the way).
There will be an extraction pit at West Broadway and Cypress, just to the east of Arbutus station. The machines will be disassembled and removed there. Presumably they go back to Germany.
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
Reply With Quote
     
     
  #2212  
Old Posted Jun 30, 2023, 6:00 PM
Unregistered User Unregistered User is offline
Registered User
 
Join Date: Sep 2018
Posts: 40
I assume this is the beginning of the GNW-Emily Carr Station entrance.

Reply With Quote
     
     
  #2213  
Old Posted Jul 3, 2023, 7:11 PM
fredinno's Avatar
fredinno fredinno is offline
Registered User
 
Join Date: Jan 2012
Posts: 2,317
I'm back. I'm moving the discussion here.

Quote:
Originally Posted by Migrant_Coconut View Post
It’s Sasamat OR Jericho - all the graphics and documentation make that pretty clear - and they already picked Jericho. Both stations is wishful thinking.
TBF, none of them show accurate station locations (or usually any station locations) for the infill station.

It seems the original idea was to put the infill station in the Golf Course lands itself, but threw that idea later on and moved it to West Point Grey Village (probably a good decision.)

So the current plans are Jericho + infill in West Point Grey...

I'm proposing just building the infill station when the rest of the line is built rather than waiting, because it's still useful now.

Quote:
Seeing as Edmonds-Highgate is much less walkable than Jericho? Probably less. If it were just distance and height, it’d be very unpleasant to walk up the Arbutus Greenway for groceries, but it isn’t. And again, Jericho is much shallower if you don’t walk directly up the steepest angle of the slope; that's evidently what the planners have in mind.

And it’s even less convenient to walk from the station to Alma or 4th. Let’s face it – if residents want a change of scenery for dinner, they’ll have to get some exercise.

You call me fast, I call me average. There’s a lot more people that’re in better shape than I am. Joggers, bikers and scooters (all of which Jericho will have ample access to) are definitely much faster.
Dunno, I just think you're underestimating distances because of higher walkability (or just being used to it), and if you had a timer, it would show out to be around the same amount of time Google Maps says it is.
My experience is that it's roughly in line with the actual amount of time it takes if you time it if you're walking at a lesiurely pace, and I'm not really a slow walker or out of shape either.


Either way, it doesn't matter that much. If Highgate isn't very convenient for Edmonds residents, neither is W. Point Grey for Jericho.
The experience is nicer, but it's still not going to be a common trip, and people are just going to prefer other destinations.


Plus, the Safeway development's FSR kind of presumes at least some decent transit service up there to service it and future density (if build to that standard or higher), and I don't know if 9 alone would be able to handle it (nor would it be very efficient to have a bus service from Jericho to Sasamat for accessibility reasons.)

Ridership on the 99B on Sasamat is also not that much lower than that for the Alma Stop (about 15%-20% less.) - Alma is around ~2k boardings/weekday.

Inlet Center Station is also at 2k boardings/weekday, for comparison.


Sasamat should be viable if it is a train station if it's almost viable at its current numbers as a bus stop.
Reply With Quote
     
     
  #2214  
Old Posted Jul 3, 2023, 7:38 PM
Changing City's Avatar
Changing City Changing City is offline
Registered User
 
Join Date: Nov 2016
Posts: 8,314
Quote:
Originally Posted by fredinno View Post
I'm back. I'm moving the discussion here.
Please take it away again. This is for the Broadway Line that's under construction. You can comment on phantom stations at Sasamat on the UBC extension thread, if you really must, (although we understand your point - it's just we don't think the Provincial transportation office planning the route agrees with you).
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
Reply With Quote
     
     
  #2215  
Old Posted Jul 3, 2023, 7:54 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,177
Quote:
Originally Posted by fredinno View Post
- snip -
Both from last year. Seem pretty accurate to me. One more time: Sasamat was never an "infill" station; the options were either (Blanca)-Sasamat OR (Blanca)-Jericho, and the latter won.

You skimmed over UU's post: 12 minutes, uphill. Not 15. Walking is just straight-up faster/less tedious when there's nice scenery and minimal busy arterials; Edmonds doesn't have that, and Jericho does. If some people can't walk that far, that's what bikes and scooters are for, so Point Grey Village will be just fine without a SkyTrain next door - just like Olympic Village, Commercial, South Main and the West End.

The Alma stop exists to connect to the 7 (from Dunbar to 4th). What does Sasamat connect to? Nothing.
Now please don't make up some stupid new "future" bus route out of nowhere to justify your cancelled station, because that just makes your argument look even worse.

Edit: And CC is correct - this is the thread for construction updates about the Arbutus Extension.

Last edited by Migrant_Coconut; Jul 3, 2023 at 8:12 PM.
Reply With Quote
     
     
  #2216  
Old Posted Jul 3, 2023, 9:40 PM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888
Quote:
Originally Posted by Changing City View Post
There will be an extraction pit at West Broadway and Cypress, just to the east of Arbutus station. The machines will be disassembled and removed there. Presumably they go back to Germany.
Wow.. have any details on where this pit will be located been released?

Hopefully Memory Express won't be unduly more impacted!
Reply With Quote
     
     
  #2217  
Old Posted Jul 3, 2023, 10:07 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,207
Quote:
Originally Posted by Jimbo604 View Post
Wow.. have any details on where this pit will be located been released?

Hopefully Memory Express won't be unduly more impacted!
Broadway is already excavated there. The project video even shows the Memory Express safe and sound.

• Video Link
Reply With Quote
     
     
  #2218  
Old Posted Jul 3, 2023, 11:12 PM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888
Quote:
Originally Posted by madog222 View Post
Broadway is already excavated there. The project video even shows the Memory Express safe and sound.

• Video Link

Source: above video

So northwest corner. Good news about M.E. Here is a link that skips directly to the Arbutus extraction part of the video: https://www.youtube.com/watch?v=fLyA3c3O41Q&t=184s

As we've seen setting up the tunnel boring machine is a very complicated and time consuming process. Dreaming out loud: They should just keep drilling west of Arbutus, bring the spoils out where the gas station is on the corner there and figure out the stations later if they have to, we just need more westward!

Last edited by Jimbo604; Jul 4, 2023 at 11:29 PM. Reason: adjusted start time on video
Reply With Quote
     
     
  #2219  
Old Posted Jul 4, 2023, 7:42 AM
Tvisforme's Avatar
Tvisforme Tvisforme is offline
Registered User
 
Join Date: Sep 2014
Location: Metro Vancouver
Posts: 2,177
Quote:
Originally Posted by fredinno View Post
I'm back. I'm moving the discussion here....
Please don't.
Reply With Quote
     
     
  #2220  
Old Posted Jul 10, 2023, 7:45 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,207
Recent and detailed drone shots.

• Video Link

Last edited by madog222; Jul 10, 2023 at 7:56 PM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 8:46 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.