Quote:
Originally Posted by p_xavier
How's the construction being handled at Capstan station. There doesn't seem to have any protection for the trains but I can't see well on the pics on this page. Anticipating for the REM Griffintown station.
|
Correct, there has never been any temporary ROW protection. When required there has been periods of single tracking throughout the day for working on the platforms and full closure in both directions from 9:30pm for crane lifts for roof and escalator installation at night.