  #3981  
Old Posted May 1, 2023, 5:46 PM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,664
Quote:
Originally Posted by dpogue View Post
IMO what Columbia needs is not a separate platform for trains towards Lougheed, but rather a centre platform for easier transfers. unfortunately, that's incredibly difficult to change at this point given the tunnels on either side of the station and the massive disruption to service it would cause.
You mean a Spanish solution?
Reply With Quote
     
     
  #3982  
Old Posted May 1, 2023, 6:02 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,207
I think they just mean a standard centre platform.
Reply With Quote
     
     
  #3983  
Old Posted May 1, 2023, 6:53 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,768
Reminder that the Daily Hive article says that TranLink asked Perkins Will to examine a 3 side-platform configuration
(i.e. 3 separate side-platforms, meaning one additional side-platform together with the 2 existing side-platforms).
Reply With Quote
     
     
  #3984  
Old Posted May 1, 2023, 7:03 PM
mcj mcj is offline
Registered User
 
Join Date: Dec 2021
Location: New West
Posts: 1,240
Quote:
Originally Posted by dpogue View Post
IMO what Columbia needs is not a separate platform for trains towards Lougheed, but rather a centre platform for easier transfers. unfortunately, that's incredibly difficult to change at this point given the tunnels on either side of the station and the massive disruption to service it would cause.
Spot on. There's not really any operating issues when it comes to the trains, the issue at Columbia is passenger circulation. Everyone here speculating that the purchase of the Boucher Centre somehow indicates that major trackwork is about to occur is dreaming. What we can expect out of this is a remodeling of the station itself, probably with some circulatory escalators and improved wayfinding to get people from one side of the tracks to the other slightly better than what currently exists. The purchase of the Boucher Centre will really just allow them to offset the costs by redeveloping that parcel into a more modern station hall with a residential tower on top.
Reply With Quote
     
     
  #3985  
Old Posted May 1, 2023, 7:26 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,207
Quote:
Originally Posted by officedweller View Post
Reminder that the Daily Hive article says that TranLink asked Perkins Will to examine a 3 side-platform configuration
(i.e. 3 separate side-platforms, meaning one additional side-platform together with the 2 existing side-platforms).
Quote:
It was stated that the successful proponent would also examine the feasibility of “three side-platform upgrade approaches.”
https://dailyhive.com/vancouver/435-colu...w-westminster-translink-columbia-station

Approach is plural so I read this as three different design approaches for a side-platform upgrade.
If they meant a three-platform design it should be written "a three side-platform upgrade approach."

Sure "three side-platform upgrade approaches" could mean multiple designs for a "three platform upgrade" but it's terrible language with that meaning and Translink's RFPs are always well written in unambiguous language.

It would have been great to see where Daily Hive is quoting that, the RFP posting on Ariba for the study doesn't contain that wording. http://discovery.ariba.com/rfx/7914873

Last edited by madog222; May 1, 2023 at 7:54 PM.
Reply With Quote
     
     
  #3986  
Old Posted May 1, 2023, 7:37 PM
scottN scottN is offline
Registered User
 
Join Date: Mar 2019
Posts: 286
As the expo line gets busier (especially the surrey branch) and train frequencies increase, I think it's going to become increasingly difficult to merge trains from the columbia-lougheed branch into the main expo line at Columbia. If a train coming from sapperton is late and misses it's spot, then the only option is to delay trains coming from surrey to make room for it. Without any slack in the schedule it becomes very difficult to clear the backlog.

A 3rd platform allows Columbia-Lougheed to be run as a shuttle or as a Millenium Line branch without impacting Expo line operations, eliminating any scheduling conflicts during normal operation. If the expo line ever needs full capacity over the skybridge to surrey, then this is the only possible solution. As noted, this would do nothing to improve passenger flows except maybe by providing more dedicated waiting space.

If Columbia-Lougheed was run as a shuttle, it could use 2 car trains to improve the frequency and reduce wait times. That might make up for the extra transfer that is needed for some users.
Reply With Quote
     
     
  #3987  
Old Posted May 1, 2023, 7:38 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,207
This was posted on Reddit February last year quoting an email response from Translink.

Quote:
TransLink conducted a feasibility study to review potential upgrade options of Columbia Station in collaboration with the City of New Westminster. This study was completed in Spring 2021.

Concept designs for the station upgrade are currently being developed based on the information learned in the feasibility study. Once a preferred design concept is chosen, detailed design work will begin. Construction of the station upgrade would not take place until that is complete and funding is established, which is not expected to occur prior to 2025.
https://www.reddit.com/r/NewWest/comments/sj998t/response_from_translink_re_the_long_planned/
Reply With Quote
     
     
  #3988  
Old Posted May 1, 2023, 8:01 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,176
Quote:
Originally Posted by scottN View Post
As the expo line gets busier (especially the surrey branch) and train frequencies increase, I think it's going to become increasingly difficult to merge trains from the columbia-lougheed branch into the main expo line at Columbia. If a train coming from sapperton is late and misses it's spot, then the only option is to delay trains coming from surrey to make room for it. Without any slack in the schedule it becomes very difficult to clear the backlog...
This. It could get even worse if the Expo branches to Newton as speculated.
Reply With Quote
     
     
  #3989  
Old Posted May 1, 2023, 8:45 PM
mcj mcj is offline
Registered User
 
Join Date: Dec 2021
Location: New West
Posts: 1,240
Quote:
Originally Posted by scottN View Post
As the expo line gets busier (especially the surrey branch) and train frequencies increase, I think it's going to become increasingly difficult to merge trains from the columbia-lougheed branch into the main expo line at Columbia. If a train coming from sapperton is late and misses it's spot, then the only option is to delay trains coming from surrey to make room for it. Without any slack in the schedule it becomes very difficult to clear the backlog.
Don't really think this issue is as dire as you put it. Current headways still are quite flexible for most of the day. If this becomes a consistent problem for the hoards of people at Braid/Sapperton station delaying trains there's ways to alleviate the issue, like shortening the time the doors are open at the platform.

The speculation that Translink sees this as an issue is just that, speculation, all documentation from Translink shows they plan on maintaining the Expo Line spurs as is for the foreseeable future.
Reply With Quote
     
     
  #3990  
Old Posted May 1, 2023, 10:55 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,799
Quote:
Originally Posted by Migrant_Coconut View Post
This. It could get even worse if the Expo branches to Newton as speculated.
The transit designers need to get over this whole branching mentality that they've been stuck in for the past several decades. Instead of the line branching it should cross over, like the Canada Line and the Millennium line at Broadway and Cambie. Keep the two lines independent of each other. They can build an interchange track between the lines to allow rerouting of trains if need be, but normal trains running on one line shouldn't affect the other.
Reply With Quote
     
     
  #3991  
Old Posted May 1, 2023, 11:00 PM
mcj mcj is offline
Registered User
 
Join Date: Dec 2021
Location: New West
Posts: 1,240
Quote:
Originally Posted by aberdeen5698 View Post
The transit designers need to get over this whole branching mentality that they've been stuck in for the past several decades. Instead of the line branching it should cross over, like the Canada Line and the Millennium line at Broadway and Cambie. Keep the two lines independent of each other. They can build an interchange track between the lines to allow rerouting of trains if need be, but normal trains running on one line shouldn't affect the other.
Good thing Migrant is just speculating and the actual transit designers for this don't exist yet afaik.
Reply With Quote
     
     
  #3992  
Old Posted May 1, 2023, 11:21 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,207
Quote:
Originally Posted by aberdeen5698 View Post
The transit designers need to get over this whole branching mentality that they've been stuck in for the past several decades. Instead of the line branching it should cross over, like the Canada Line and the Millennium line at Broadway and Cambie. Keep the two lines independent of each other. They can build an interchange track between the lines to allow rerouting of trains if need be, but normal trains running on one line shouldn't affect the other.
So once the South Surrey and PoCo lines are built we should just run trains between those and leave Expo only to Langley and Milenium only to Lafarge Lake?

The point of branch lines / interlining is to maximize capacity through the central areas where it is needed while not wasting capacity in the outlying areas.

I don't see how Cambie City Hall fits into this though.

Last edited by madog222; May 1, 2023 at 11:44 PM.
Reply With Quote
     
     
  #3993  
Old Posted May 1, 2023, 11:21 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,176
Quote:
Originally Posted by mcj View Post
Good thing Migrant is just speculating and the actual transit designers for this don't exist yet afaik.
Whether or not the Newton becomes an Expo branch, aberdeen is somewhat correct - TransLink's upper echelon seems fixated on one big octopus sprawling from the Edmonds depot across the whole metro, but it doesn't necessarily have to work like that.
Reply With Quote
     
     
  #3994  
Old Posted May 2, 2023, 12:03 AM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
How much "down time" would be needed to change out the I beams New west side of Skytrain bridge to offer direct route Surrey to Lougheed. Sane for the work to tie into the track after the tunnel woodlands side?
Reply With Quote
     
     
  #3995  
Old Posted May 2, 2023, 12:36 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,207
Quote:
Originally Posted by Mac Write View Post
How much "down time" would be needed to change out the I beams New west side of Skytrain bridge to offer direct route Surrey to Lougheed. Sane for the work to tie into the track after the tunnel woodlands side?
The bridge approach is a steel box girder all the way to ground level which would need to be completely replaced. There is also the issue of track switches on an inclined curve.

May as well just build a second bridge if that routing is wanted by Translink.

Last edited by madog222; May 2, 2023 at 12:58 AM.
Reply With Quote
     
     
  #3996  
Old Posted May 2, 2023, 12:58 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,110
Columbia station, could they have a bridge that goes over the tracks similar to what they have at New West station? a big part of the problem is the large volume of people changing trains at the station and only one option to do so. And at least put an escalator in at the Surrey/Lougheed bound side.

We got a letter about 6 weeks ago that said that Lougheed station would be starting some work to accommodate longer trains in the future and to expect some delays and such.
__________________
belowitall
Reply With Quote
     
     
  #3997  
Old Posted May 2, 2023, 1:00 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,110
Quote:
Originally Posted by Mac Write View Post
How much "down time" would be needed to change out the I beams New west side of Skytrain bridge to offer direct route Surrey to Lougheed. Sane for the work to tie into the track after the tunnel woodlands side?
I would like to see a train that originates on 152 at Guildford and goes over to Lougheed, have at least two River crossings out of Surrey. When the "bus bridge" is needed it seems like a nightmare to get from the New West side to the Surrey side. having another crossing option would be great.
__________________
belowitall
Reply With Quote
     
     
  #3998  
Old Posted May 2, 2023, 1:25 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,768
Quote:
Originally Posted by madog222 View Post
https://dailyhive.com/vancouver/435-colu...w-westminster-translink-columbia-station

Approach is plural so I read this as three different design approaches for a side-platform upgrade.
If they meant a three-platform design it should be written "a three side-platform upgrade approach."

Sure "three side-platform upgrade approaches" could mean multiple designs for a "three platform upgrade" but it's terrible language with that meaning and Translink's RFPs are always well written in unambiguous language.

It would have been great to see where Daily Hive is quoting that, the RFP posting on Ariba for the study doesn't contain that wording. http://discovery.ariba.com/rfx/7914873
Yeah, the language is awful, but it's Daily Hive, so I didn't expect much.
Your take didn't occur to me.
I thought "approach" would signal something quite different than what's there now.
Reply With Quote
     
     
  #3999  
Old Posted May 2, 2023, 1:37 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,207
Quote:
Originally Posted by officedweller View Post
Yeah, the language is awful, but it's Daily Hive, so I didn't expect much.
Your take didn't occur to me.
I thought "approach" would signal something quite different than what's there now.
They also used "approaches" in the RFP for 22nd Street and Gateway.

Quote:
As the first step in the upgrade project, TLFD is seeking a multi-disciplinary consultant team (hereafter “the Consultant”) to conduct a Feasibility Study analyzing two concept upgrade approaches and their component parts for each station (Gateway and 22nd Street).
http://discovery.ariba.com/rfx/15333921
Reply With Quote
     
     
  #4000  
Old Posted May 2, 2023, 3:11 AM
Hotwax's Avatar
Hotwax Hotwax is offline
Registered User
 
Join Date: Mar 2011
Location: Metro Vancouver
Posts: 184
Quote:
Originally Posted by SpongeG View Post
Columbia station, could they have a bridge that goes over the tracks similar to what they have at New West station? a big part of the problem is the large volume of people changing trains at the station and only one option to do so.
There's already two options for transferring platforms at Columbia; I always take the stairs for the 4th Street entrance as most people seem to be unaware they exist.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 6:38 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.