HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Reply

 
Thread Tools Display Modes
     
     
  #3181  
Old Posted Jun 20, 2023, 6:57 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,399
Interesting decision of not going all the way up with the glass panel on the Corso Italia station.

This is ... ugly, not to mention the elements.

Reply With Quote
     
     
  #3182  
Old Posted Jun 20, 2023, 7:57 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Running theory is that it's for air circulation, otherwise the doorway would be the only opening, which would not provide enough airflow.
Reply With Quote
     
     
  #3183  
Old Posted Jun 20, 2023, 8:22 PM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,977
Quote:
Originally Posted by J.OT13 View Post
Running theory is that it's for air circulation, otherwise the doorway would be the only opening, which would not provide enough airflow.
Yeah I would bet they didnt want to spend money on ventilation and the only way to pass fire safety regulation without ventilation is to keep it an open air building, that would be my guess. Same thing with the open air station in the Byron Tunnel on the west side
Reply With Quote
     
     
  #3184  
Old Posted Jun 20, 2023, 8:29 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,801
I think they are likely just waiting for custom pieces of glass that have yet to be received.
Reply With Quote
     
     
  #3185  
Old Posted Jun 20, 2023, 8:54 PM
LRTeverywhere LRTeverywhere is offline
Registered User
 
Join Date: Oct 2018
Posts: 326
Quote:
Originally Posted by TransitZilla View Post
I think they are likely just waiting for custom pieces of glass that have yet to be received.
Unfortunetly not.

Reply With Quote
     
     
  #3186  
Old Posted Jun 20, 2023, 9:50 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,650
Is the overhang wide enough to keep most of the snow out? Otherwise, that's gonna 🞵🞵🞵🞵!
Reply With Quote
     
     
  #3187  
Old Posted Jun 21, 2023, 12:55 AM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,698
Quote:
Originally Posted by AuxTown View Post
Is the overhang wide enough to keep most of the snow out? Otherwise, that's gonna 🞵🞵🞵🞵!
Sometimes snow blows horizontally and no amount of overhang will block it. Tunney’s in the winter is proof
Reply With Quote
     
     
  #3188  
Old Posted Jun 21, 2023, 1:17 AM
skyscraperaccount skyscraperaccount is offline
Registered User
 
Join Date: Jun 2023
Posts: 302
It lets the smell of urine dissipate. First Class.
Reply With Quote
     
     
  #3189  
Old Posted Jun 21, 2023, 8:18 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by LRTeverywhere View Post
Unfortunetly not.

Walkley station is the same, towards the back they have this "ventilation feature"
Reply With Quote
     
     
  #3190  
Old Posted Jun 21, 2023, 8:36 PM
OTownandDown OTownandDown is offline
Registered User
 
Join Date: Jul 2018
Posts: 1,637
Typically 'they' just fake it for you people and put sheet metal louvres, at least it makes a finished look.
Reply With Quote
     
     
  #3191  
Old Posted Jun 29, 2023, 4:15 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Trains have reached Bayview.
Reply With Quote
     
     
  #3192  
Old Posted Jun 29, 2023, 6:18 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,811
Videos of train testing at and near Bayview can be found here.

https://urbantoronto.ca/forum/threads/ottawa-transit-developments.28872/page-125
Reply With Quote
     
     
  #3193  
Old Posted Jun 29, 2023, 9:03 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,689
Quote:
Originally Posted by lrt's friend View Post
Videos of train testing at and near Bayview can be found here.

https://urbantoronto.ca/forum/threads/ottawa-transit-developments.28872/page-125
Funny (or is it just sad?) that the Urban Toronto forum has a 125-page Ottawa Transit Developments thread with information that isn't found here. Maybe we should encourage those forum members who aren't already members to join us over here?
Reply With Quote
     
     
  #3194  
Old Posted Jun 29, 2023, 10:35 PM
eltodesukane eltodesukane is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,146
This is a skyscaper forum.
Nothing to do with transit.
Reply With Quote
     
     
  #3195  
Old Posted Jun 30, 2023, 9:45 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by eltodesukane View Post
This is a skyscaper forum.
Nothing to do with transit.
And Urban Toronto is a Toronto forum. Doesn't stop them from have discussions beyond the borders of Toronto.

It's called SkyscraperPage, but the forum goes way beyond just skyscrapers. It's an urbanism forum, and beyond.
Reply With Quote
     
     
  #3196  
Old Posted Jul 6, 2023, 1:58 AM
On Edge On Edge is offline
Registered User
 
Join Date: Oct 2012
Posts: 159
Spotted a train slowly climbing over the Ellwood crossover this evening around 8.
Reply With Quote
     
     
  #3197  
Old Posted Jul 6, 2023, 12:33 PM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,977
Quote:
Originally Posted by On Edge View Post
Spotted a train slowly climbing over the Ellwood crossover this evening around 8.
I spotted a train at around 8pm at Carleton Station and heading south



Reply With Quote
     
     
  #3198  
Old Posted Jul 6, 2023, 1:22 PM
hwy418 hwy418 is offline
Registered User
 
Join Date: Jun 2013
Posts: 410
I really like these new Stadler trainsets - can't wait to try them!
Reply With Quote
     
     
  #3199  
Old Posted Jul 6, 2023, 2:25 PM
Multi-modal Multi-modal is offline
Registered User
 
Join Date: Jul 2014
Posts: 1,154
Quote:
Originally Posted by rocketphish View Post
Funny (or is it just sad?) that the Urban Toronto forum has a 125-page Ottawa Transit Developments thread with information that isn't found here. Maybe we should encourage those forum members who aren't already members to join us over here?
I find a lot of the transit discussion on skyscraperpage has moved over the Rail Fans Canada discord. A lot less discussion on here now.
Reply With Quote
     
     
  #3200  
Old Posted Jul 7, 2023, 6:45 PM
Truenorth00 Truenorth00 is online now
Registered User
 
Join Date: May 2017
Posts: 29,115
Going to move this to a more relevant thread....

Quote:
Originally Posted by PHrenetic View Post
Good Day.

Fair enough, but I would think that the Ontario / B.C. company producing the cells has had to go down this road. and justify their impact.
Battery technologies just kinda grew helter skelter, and we are seeing more and more of the impact as time progresses, along with the economics of geopolitics.

That same energy system can go to green hydrogen production - no real need for the natural gas option if properly configured / installed / operated.

Reliability of battery systems could well be - again I have no numbers.
This is what a proper trial is meant to prove out.
But unfortunately - to be a bit nasty - there have been several widely reported difficulties with various manufacturers' battery systems in cars and suvs lately, as the technology ages into more massive production and matures.
True - this is cars and suvs, where they are trying to reduce costs and margins to an extreme, but still.....

Good discussion, but I am open to having it move elsewhere than the VIA thread if anyone wishes to suggest where.

Thx.
In any other city, the Trillium Corridor would be twin tracked and electrified and we wouldn't be having this discussion. The best solution to any moderate frequency urban or suburban rail corridor is electrification. Battery or fuel cells are at best a compromise solution. Full electrification has the lowest operating cost, the least disruption (no refuelling time, lower maintenance) and the highest reliability (fewer components and no novel technology).

Second to the above is battery-electric. And that's largely because there's no need to buildout a whole storage and distribution infrastructure, as you would have to for hydrogen. Installing charging gantries at the terminii is relatively easy. Hooking them up to the grid is not an issue.

Hydrogen fuel cells have a very specific application which really doesn't apply to the Trillium Line. Hydrogen fuel cells are great for long, low frequency routes where batteries can't provide enough range and the cost of electrification is not justified because of low frequency. If you want to run a train 95 km through the countryside, a few times a day, hydrogen fuel cells might make sense. A 24 km suburban rail line running 5-6 trains per hour in each direction? Full electrification or battery with charging at the terminii is more sensible.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 11:42 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.