Quote:
Originally Posted by Coldrsx
Given the recent rain, I wonder if this has to do with drainage, terminations and unexpected initial corrosion?
|
The control terminations aren't going to be done under ground and open to the weather, this isn't the 3rd world.
Typically the only thing in the track bed open to the weather is conductors connected to the rail.
They probably spec'd the wrong cable or damaged the fiber pulling it and are having communications issues. Considering they seemed to have people at every station, it's almost certainly a systemic issue, I'd guess an engineering muck up.
Unlike they inept self-performing of civil work with PME, they hired a reputable signals Contractor at least.