Quote:
Originally Posted by Migrant_Coconut
Thanks. Forgot the Production Way branch isn't a separate track.
Still, the end goal should be to make that entire segment operate independently of one line or the other (preferably both at once); right now it's a third wheel that just overcomplicates whichever line it gets dumped on.
|
There are 4 points to terminate the existing lines, Waterfront, Larfarge Lake, King George ( 103St in Langley eventually), VCC-Clark (Arbutus eventually)
Way back when, you have to remember that the Millenium Line was supposed to be the entire UBC to Coquitlam line. That is what it always was supposed to be. Likewise the Expo Line was always supposed to go to Langley City.
What has really happened is that there was a design oversight in the assumption that Loughheed Town Center would be a hub, rather than Production Way. Thus it inconveniences passengers to have to get off at Lougheed, only to go one stop to get to Production Way to transfer yet again to the Gondola/Bus. What would have made "more sense" would have been to make Lougheed the transfer point to the University and put the Gondola there to avoid making changes to the tracks. But I guess we will live with this until there is a capacity crunch which isn't foreseeable right now.
And the only way to really fix that is to rebuild the track between Lake City Way, Production Way and Lougheed to have 4 tracks. Otherwise you're basically saying Sapperton and Braid shouldn't exist, and everyone coming from Surrey should have to travel all the way to Commercial to transfer to the Millennium Line and then travel all the way back.
It's an automated system, they can tweak it enough that they can make do with the existing track setup. So if this ultimately means all trains do a full network circuit, then that just makes sense to.
So if 50% head to Langley and 50% head to Arbutus, then the other 50% on the Millennium Line has to be Arbutus to Coquitlam, and 50% can be Surrey to Langley only. It'll all depend on rolling stock and capacity. Not everyone is going to want to do a full circuit, but it makes more logical sense to send rolling stock on one side of the river further down to Langley than to send it back over the river and then have to wait at the notoriously mechanical-failure prone, cramped, Columbia Station.
You have to get out of the mindset that these are two, three, four, even five different systems. They are just one system, and they can be reconfigured just by changing the fixed signage at stations. No need to re-train staff to learn new routes or signaling changes. The computer does all of that.