Old Posted Mar 29, 2023, 4:44 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,806
Quote:
Originally Posted by aberdeen5698 View Post
Napkin calculation:

324,000m³ over 2 years = 13,500m³ per month = 675m³ per working day = 42m³ per hour for an 16-hour shift = less than 1m³ per minute.
Quote:
Originally Posted by madog222 View Post
Project news releases said up to 18m/day, at 6m diameter that's a max of 510m³/day for one TBM averaging to 0.35m³/min. They don't continuously progress though (to install the liner segments) so the actual flow whenever spoil is coming down the conveyor would be higher.
Ha! Not bad, I was pretty close!
Reply With Quote
     
     
  #1982  
Old Posted Apr 2, 2023, 12:39 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,217
Guideway from today.


Photo by me.
Reply With Quote
     
     
  #1983  
Old Posted Apr 2, 2023, 4:35 AM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888
Quote:
Originally Posted by madog222 View Post
^ I still can't get over how close the guideway will be to 887 GNW, that northern portion of the building is laboratory space, I can't image they'll be very happy.
Quote:
Originally Posted by Jimbo604 View Post
Probably feeling better than next door to the east where the building got a hair cut to make the train fit.

Last edited by Jimbo604; Apr 2, 2023 at 4:56 AM.
Reply With Quote
     
     
  #1984  
Old Posted Apr 2, 2023, 1:17 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,806
Quote:
Originally Posted by madog222 View Post
Guideway from today.
It always surprises me that the end of the guideway beams have so little overlap with the support piers. I'm sure the engineers know what they're doing, but it just looks precarious...
Reply With Quote
     
     
  #1985  
Old Posted Apr 2, 2023, 3:26 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,821
Quote:
Originally Posted by aberdeen5698 View Post
It always surprises me that the end of the guideway beams have so little overlap with the support piers. I'm sure the engineers know what they're doing, but it just looks precarious...
They will form huge concrete blocks where the guideway sections join over the pier.
Reply With Quote
     
     
  #1986  
Old Posted Apr 2, 2023, 8:52 PM
waves's Avatar
waves waves is offline
waves
 
Join Date: Jun 2015
Location: North Vancouver
Posts: 383
You can see that the I-beams have rebar sticking out of the ends. I imagine they will tie in that rebar to a cast-in place concrete cap.
Reply With Quote
     
     
  #1987  
Old Posted Apr 2, 2023, 9:00 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,184
In other words, the guideway's fine as long as the Big One doesn't hit within the next few months or so?
Reply With Quote
     
     
  #1988  
Old Posted Apr 2, 2023, 9:59 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Migrant_Coconut View Post
In other words, the guideway's fine as long as the Big One doesn't hit within the next few months or so?
Generally the case with most construction.
Reply With Quote
     
     
  #1989  
Old Posted Apr 2, 2023, 10:09 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,217
-snip-
Reply With Quote
     
     
  #1990  
Old Posted Apr 3, 2023, 12:31 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,806
Quote:
Originally Posted by waves View Post
You can see that the I-beams have rebar sticking out of the ends. I imagine they will tie in that rebar to a cast-in place concrete cap.
Yeah, that makes sense. But if it's cast together like that I wonder how the structure handles thermal expansion...?
Reply With Quote
     
     
  #1991  
Old Posted Apr 3, 2023, 1:07 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,217
Quote:
Originally Posted by aberdeen5698 View Post
Yeah, that makes sense. But if it's cast together like that I wonder how the structure handles thermal expansion...?
They're cast together in groups of three or four long with expansion joints between those sections. You can see the finished ends of the girders where the joints are.

Quote:
Originally Posted by dpogue View Post
Circa Thursday at Great Northern Way (photo by me):
Reply With Quote
     
     
  #1992  
Old Posted Apr 3, 2023, 6:15 PM
Helvetia's Avatar
Helvetia Helvetia is offline
Registered User
 
Join Date: Jan 2023
Location: North Delta
Posts: 98
Broadway Subway Skytrain Construction Winter 2023

Neat summary of recent progress in video form.
Reply With Quote
     
     
  #1993  
Old Posted Apr 3, 2023, 7:09 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,217
^Great video!
Reply With Quote
     
     
  #1994  
Old Posted Apr 4, 2023, 6:16 PM
mattropolis's Avatar
mattropolis mattropolis is offline
matt in the city
 
Join Date: May 2004
Location: BC
Posts: 394
My pictures from Sunday evening Apr 2nd.

Where the guideway starts to dip down to ground level



Columns looking west.
Reply With Quote
     
     
  #1995  
Old Posted Apr 5, 2023, 2:21 AM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,864
2023, Apr 4

Main St.
After weekend concrete pouring:

Untitled by Lexus LX600, on Flickr

City Hall:
Everything looks ready for TBMs to arrive:

Untitled by Lexus LX600, on Flickr
Reply With Quote
     
     
  #1996  
Old Posted Apr 5, 2023, 3:09 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,217
Quote:
Originally Posted by Lexus View Post
City Hall:
Everything looks ready for TBMs to arrive:
My rough estimates of GNW-> Main St tunneling speed once the TBMs were fully built:
Elsie 9.3m/day
Phyllis ~12m/day

If Elsie does 12m/day she will break through at Alberta around April 28th.

At 14m/day would be a week earlier.

Last edited by madog222; Apr 5, 2023 at 3:28 AM.
Reply With Quote
     
     
  #1997  
Old Posted Apr 13, 2023, 2:02 AM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,864
2023, Apr 12

From West to East

Untitled by Lexus LX600, on Flickr

Untitled by Lexus LX600, on Flickr

Untitled by Lexus LX600, on Flickr

Untitled by Lexus LX600, on Flickr
Reply With Quote
     
     
  #1998  
Old Posted Apr 14, 2023, 3:44 AM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888
Reply With Quote
     
     
  #1999  
Old Posted Apr 14, 2023, 4:43 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
Thanks.
Still some excavation to go by the looks of the steel pipes outlining the TBM entry points.
Reply With Quote
     
     
  #2000  
Old Posted Apr 14, 2023, 9:46 PM
Hotwax's Avatar
Hotwax Hotwax is offline
Registered User
 
Join Date: Mar 2011
Location: Metro Vancouver
Posts: 186
Just witnessed Elsie arrive at Broadway-City Hall right now.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:25 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.