Quote:
Originally Posted by Lexus
City Hall:
Everything looks ready for TBMs to arrive:
|
My rough estimates of GNW-> Main St tunneling speed once the TBMs were fully built:
Elsie 9.3m/day
Phyllis ~12m/day
If Elsie does 12m/day she will break through at Alberta around April 28th.
At 14m/day would be a week earlier.