  #361  
Old Posted May 27, 2021, 4:30 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by osirisboy View Post
Lmao. So now the moderator thinks demo and utility relocation means U/C
Isn't that the first steps of construction?
Reply With Quote
     
     
  #362  
Old Posted May 27, 2021, 5:04 PM
jlousa's Avatar
jlousa jlousa is offline
Ferris Wheel Hater
 
Join Date: Jun 2006
Posts: 8,371
Quote:
Originally Posted by osirisboy View Post
Lmao. So now the moderator thinks demo and utility relocation means U/C
No they don't, someone changed it and I don't care enough to change it back at this point. But the standard definition still applies, it's under construction when parts of the permeant project are being constructed.
Reply With Quote
     
     
  #363  
Old Posted May 27, 2021, 6:14 PM
osirisboy's Avatar
osirisboy osirisboy is offline
Registered User
 
Join Date: Mar 2006
Location: Vancouver BC
Posts: 6,430
Quote:
Originally Posted by jlousa View Post
No they don't, someone changed it and I don't care enough to change it back at this point. But the standard definition still applies, it's under construction when parts of the permeant project are being constructed.
Thank you for caring enough to give me that detailed explanation! So much for consistency. So it’s still proposed but the thread title is just in accurate. Lol

Last edited by osirisboy; May 27, 2021 at 6:41 PM.
Reply With Quote
     
     
  #364  
Old Posted May 27, 2021, 6:52 PM
Diegotheartist1's Avatar
Diegotheartist1 Diegotheartist1 is offline
Registered User
 
Join Date: Apr 2021
Location: Vancouver
Posts: 163
I remember back when the PMC/Evergreen Extension was under construction, the official website had cameras installed on a particular location. I used to watch the construction of these locations a lot. They were at the Tunnel Boring Machine, Moody Centre, Inlet Centre, Lincoln Station. If only the same method was done for this extension like they did in the previous, we wouldn't have to drive there in heavy traffic just to see the progress.
Reply With Quote
     
     
  #365  
Old Posted May 27, 2021, 6:58 PM
Changing City's Avatar
Changing City Changing City is offline
Registered User
 
Join Date: Nov 2016
Posts: 8,342
Quote:
Originally Posted by jlousa View Post
No they don't, someone changed it and I don't care enough to change it back at this point. But the standard definition still applies, it's under construction when parts of the permeant project are being constructed.
I'm pretty sure part of the Granville station is under construction, even if the boring machine isn't headed for it any time in the immediate future.
Reply With Quote
     
     
  #366  
Old Posted May 27, 2021, 8:28 PM
Feathered Friend Feathered Friend is offline
Registered User
 
Join Date: Jun 2016
Posts: 2,556
My Photos - May 18th & May 22nd - Broadway Cambie Demo

May 18th, 2021











May 22nd, 2021










Quote:
Given how busy Vancouver’s Broadway-City Hall station is, we had assumed there would be tons of photos showing the nearby demolition work. Fortunately, we were able to capture some shots of the mid-block building on May 18th.

By May 22nd, all that remained was some rubble, the western building, & these 24 steel beams which will form a temporary bridge at this intersection. That, along with the bored tunnels, will ensure this Canada Line station’s expansion won’t turn into another cut & cover mess
https://www.instagram.com/p/CPY7jrGMusB/...7P3TJpfEs47R0mj1XpmcW11C2H8R4gwXSb65FLqQ
Reply With Quote
     
     
  #367  
Old Posted May 27, 2021, 8:31 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,217
Quote:
Originally Posted by Diegotheartist1 View Post
I remember back when the PMC/Evergreen Extension was under construction, the official website had cameras installed on a particular location. I used to watch the construction of these locations a lot. They were at the Tunnel Boring Machine, Moody Centre, Inlet Centre, Lincoln Station. If only the same method was done for this extension like they did in the previous, we wouldn't have to drive there in heavy traffic just to see the progress.
The whole BC Construction Camera system has gone defunct.
Reply With Quote
     
     
  #368  
Old Posted May 27, 2021, 11:35 PM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,032
Hmm, this project seems to be at around the same stage now as the GMB was, time to pull the plug and go back to the drawing board?

JK, great to see this moving along.
Reply With Quote
     
     
  #369  
Old Posted May 29, 2021, 12:54 PM
Hooknose Hooknose is offline
Registered User
 
Join Date: Mar 2017
Posts: 248
Quote:
Originally Posted by Changing City View Post
That block has also lost all its street trees, so the work presumably extends that far.
The block in front of No Frills is also a construction zone as the Broadway line is building a line crossover there. (switches trains from one line to the other, if needed).

The holes may not be for hoarding but rather for piles that keep the No frills from c=falling into the big hole that is coming for the street in front of it.
Reply With Quote
     
     
  #370  
Old Posted May 29, 2021, 12:55 PM
Hooknose Hooknose is offline
Registered User
 
Join Date: Mar 2017
Posts: 248
Quote:
Originally Posted by Changing City View Post
That block has also lost all its street trees, so the work presumably extends that far.
The block in front of No Frills is also a construction zone as the Broadway line is building a line crossover there. (switches trains from one line to the other, if needed).

The holes may not be for hoarding but rather for piles that keep the No frills from falling into the big hole that is coming for the street in front of it.
Reply With Quote
     
     
  #371  
Old Posted May 29, 2021, 5:43 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,821
Quote:
Originally Posted by Hooknose View Post
The block in front of No Frills is also a construction zone as the Broadway line is building a line crossover there. (switches trains from one line to the other, if needed).

The holes may not be for hoarding but rather for piles that keep the No frills from falling into the big hole that is coming for the street in front of it.
Do you have a source on the location of the crossover? This 2018 document first says east and then says the location is west for the location.

Quote:
This document from 2018 mentions a crossover but says east and west. A rail track crossover will be provided east of the new Cambie Station.

The tunnel(s) will continue westward past Cambie to Oak Station. A rail track crossover will be provided west of the new Cambie Station.
https://www.broadwaysubway.ca/app/uploads/sites/626/2020/08/Business-Case-FINAL-March-2018.pdf
Reply With Quote
     
     
  #372  
Old Posted May 29, 2021, 6:46 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,217
Quote:
Originally Posted by jollyburger View Post
Do you have a source on the location of the crossover? This 2018 document first says east and then says the location is west for the location.
We can assume it will be East of the station. There is ‘Utilities Investigation’ between Cambie and Alberta, the same work at Mount Pleasant Station is only along one block. It also is the obvious choice as to the West would mean excavating around and under the Canada Line tunnel. Construction renders also show nothing to the West.

Traffic Decking by B.C. Ministry of Transportation and Infrastructure, on Flickr
Reply With Quote
     
     
  #373  
Old Posted May 29, 2021, 7:29 PM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888
Fencing at Broadway [and Cambie] subway construction site falls on senior in Vancouver
By Simon Little Global News
Posted May 28, 2021 9:15 pm
Updated May 28, 2021 9:16 pm

https://globalnews.ca/news/7903999/woman-trapped-subway-fence-vancouver/
Reply With Quote
     
     
  #374  
Old Posted May 29, 2021, 7:44 PM
Diegotheartist1's Avatar
Diegotheartist1 Diegotheartist1 is offline
Registered User
 
Join Date: Apr 2021
Location: Vancouver
Posts: 163
The crossover according to the interior layout will probably look like this (track in yellow)
Reply With Quote
     
     
  #375  
Old Posted May 29, 2021, 8:25 PM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
this is from April 2021, Broadway Subway Info Session, see page 17. the crossover area is all on the east.

at one point, they were proposing 1/2 a crossover on the east, the other 1/2 on the west. as seen in this report from 2019, page 121
Reply With Quote
     
     
  #376  
Old Posted May 30, 2021, 8:57 PM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888
del

Last edited by Jimbo604; Jun 2, 2021 at 3:50 AM. Reason: yadda
Reply With Quote
     
     
  #377  
Old Posted Jun 2, 2021, 3:50 AM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888








Photo source: me

Still standing.

Also in a BUS STOP UPDATE to the issue mcminsen mentioned, they have put a traffic cone and tape to warn people from wasting their time at the previous bus stop location.
Reply With Quote
     
     
  #378  
Old Posted Jun 2, 2021, 3:22 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,734
RIP weird wood furniture store.

Main/Broadway continues to be a mess with the sewer work. Hopefully it's over soon.
Reply With Quote
     
     
  #379  
Old Posted Jun 2, 2021, 5:52 PM
Changing City's Avatar
Changing City Changing City is offline
Registered User
 
Join Date: Nov 2016
Posts: 8,342
Quote:
Originally Posted by WarrenC12 View Post
RIP weird wood furniture store.
Not dead yet. They moved to North Vancouver.
Reply With Quote
     
     
  #380  
Old Posted Jun 4, 2021, 4:02 AM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888


Digging at Emily Carr site. Not under construction though, lol!




And it looks like the warehouse to the west of the former-MEC head-office building (901 Great Northern Way) has gotten its haircut at the back to make room for the subway to run between the office and the railway tracks.




This Google Maps Photo is in the parkade of the office building at 887 Great Northern Way. This is to the west of the modified warehouse and shows the scene. The warehouse used to go north of the wooden gazebo, but now the warehouse looks to have been cut back to the south of the gazebo.



Photo sources: me first two and Google Maps Street View & Google Maps
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:25 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.