  #1961  
Old Posted Mar 16, 2023, 2:44 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,807
This excavation is for the Canada/Broadway Line platform connection.



https://twitter.com/broadwaysubway_/status/1635732833837744140
Reply With Quote
     
     
  #1962  
Old Posted Mar 17, 2023, 11:04 PM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,795
From Broadway Subway twitter:

Work at Broadway City Hall Station posted March 15th:


Check out the excavation @ Broadway-City Hall! You can see light shining through the future station entrance.
The vertical columns support the traffic deck, allowing people to move freely above. There are 70+ metal beams, called struts, supporting the excavation walls below.

https://twitter.com/broadwaysubway_?ref_src=twsrc%5Egoogle%7Ctwcamp%5Eserp%7Ctwgr%5Eauthor

Work at Maple & Broadway posted March 13th:


Have a look at crews preparing to hang excavated utilities from the traffic deck at Maple and Broadway. This will protect the utilities during upcoming excavation work.
https://twitter.com/broadwaysubway_?ref_src=twsrc%5Egoogle%7Ctwcamp%5Eserp%7Ctwgr%5Eauthor
Reply With Quote
     
     
  #1963  
Old Posted Mar 20, 2023, 10:59 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,807
Reply With Quote
     
     
  #1964  
Old Posted Mar 21, 2023, 2:25 AM
Diegotheartist1's Avatar
Diegotheartist1 Diegotheartist1 is offline
Registered User
 
Join Date: Apr 2021
Location: Vancouver
Posts: 163
Ayy!
Reply With Quote
     
     
  #1965  
Old Posted Mar 22, 2023, 2:20 AM
madog222 madog222 is offline
Moderator
 
Join Date: Jan 2014
Posts: 4,215
Guideway from today.






Photos by me.
Reply With Quote
     
     
  #1966  
Old Posted Mar 22, 2023, 2:41 AM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,795
Nice, thanks!
Reply With Quote
     
     
  #1967  
Old Posted Mar 28, 2023, 3:53 AM
Hooknose Hooknose is offline
Registered User
 
Join Date: Mar 2017
Posts: 248
Quote:
Originally Posted by officedweller View Post
Nice, thanks!
Nothing for the last 5 days

????????
Reply With Quote
     
     
  #1968  
Old Posted Mar 28, 2023, 4:09 AM
Helvetia's Avatar
Helvetia Helvetia is offline
Registered User
 
Join Date: Jan 2023
Location: North Delta
Posts: 98
Quote:
Originally Posted by Hooknose View Post
Nothing for the last 5 days

????????
Our resident reporter madog222 must have been busy elsewhere
Reply With Quote
     
     
  #1969  
Old Posted Mar 28, 2023, 4:25 AM
madog222 madog222 is offline
Moderator
 
Join Date: Jan 2014
Posts: 4,215
Edit: Sorry I'm late

Concrete pour scheduled for tomorrow for the headhouse foundation at Main St (rebar in first pic).

From today:




Not a great picture (impossible from this angle) but whatever, the little cart bringing tunnel segments up to the TBM is visible below the ventilation duct on the right.
Elsie is fully inside the tunnel on the way to Cambie.

Photos by me.

Last edited by madog222; Mar 28, 2023 at 4:38 AM.
Reply With Quote
     
     
  #1970  
Old Posted Mar 28, 2023, 5:12 AM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888

Src: https://twitter.com/broadwaysubway_/status/1638601916333604867?cxt=HHwWhoC29dvwvb0tAAAA "Did you know that the last of 21 elevated guideway columns was poured in February? 🎉Beginning this month, crews are installing the girders that will connect the columns and support the future SkyTrain tracks."


Src: https://twitter.com/broadwaysubway_/status/1639326484254031872?cxt=HHwWgIDQzY-wh8AtAAAA "Crews are laying out the welcome mat for the arrival of #TunnelBoringMachine Elsie at Broadway-City Hall! This Saturday, around 140 trucks will pour concrete into the east part of the base slab foundation for the Broadway-City Hall Station between Alberta and Yukon streets."
Reply With Quote
     
     
  #1971  
Old Posted Mar 28, 2023, 5:45 AM
madog222 madog222 is offline
Moderator
 
Join Date: Jan 2014
Posts: 4,215
^ I still can't get over how close the guideway will be to 887 GNW, that northern portion of the building is laboratory space, I can't image they'll be very happy.
Reply With Quote
     
     
  #1972  
Old Posted Mar 28, 2023, 5:48 AM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 769
Circa Thursday at Great Northern Way (photo by me):
Reply With Quote
     
     
  #1973  
Old Posted Mar 28, 2023, 3:15 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,721
Two pumps pouring concrete at Main St this morning. Go go go!
Reply With Quote
     
     
  #1974  
Old Posted Mar 28, 2023, 3:32 PM
FarmerHaight's Avatar
FarmerHaight FarmerHaight is offline
Peddling to progress
 
Join Date: Jul 2019
Location: Vancouver's West End
Posts: 1,631
I biked by Mount Pleasant Station on Saturday and stopped to take a look. The conveyor belt was spitting out dirt onto a large pile and while I understand the tunneling will take months to complete, I think it's incredible that the volume of dirt coming out is so small.
__________________
“Nothing compares to the simple pleasure of riding a bike” – John F Kennedy
Reply With Quote
     
     
  #1975  
Old Posted Mar 28, 2023, 7:51 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,807
Quote:
Originally Posted by FarmerHaight View Post
I biked by Mount Pleasant Station on Saturday and stopped to take a look. The conveyor belt was spitting out dirt onto a large pile and while I understand the tunneling will take months to complete, I think it's incredible that the volume of dirt coming out is so small.
It was approx 324,000m3 of soil from the TBM. 40,000 from each station 55,000 at Broadway/City Hall.

https://www.broadwaysubway.ca/app/upload...s-Technical-Data-Report-October-2019.pdf
Reply With Quote
     
     
  #1976  
Old Posted Mar 28, 2023, 8:23 PM
madog222 madog222 is offline
Moderator
 
Join Date: Jan 2014
Posts: 4,215
Quote:
Originally Posted by jollyburger View Post
It was approx 324,000m3 of soil from the TBM. 40,000 from each station 55,000 at Broadway/City Hall.

https://www.broadwaysubway.ca/app/upload...s-Technical-Data-Report-October-2019.pdf
I think they mean the TBM spoil at the GNW station.
Reply With Quote
     
     
  #1977  
Old Posted Mar 28, 2023, 8:23 PM
FarmerHaight's Avatar
FarmerHaight FarmerHaight is offline
Peddling to progress
 
Join Date: Jul 2019
Location: Vancouver's West End
Posts: 1,631
Quote:
Originally Posted by madog222 View Post
I think they mean the TBM spoil at the GNW station.
Yes, my bad.
__________________
“Nothing compares to the simple pleasure of riding a bike” – John F Kennedy
Reply With Quote
     
     
  #1978  
Old Posted Mar 28, 2023, 10:47 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,805
Quote:
Originally Posted by FarmerHaight View Post
I biked by Mount Pleasant Station on Saturday and stopped to take a look. The conveyor belt was spitting out dirt onto a large pile and while I understand the tunneling will take months to complete, I think it's incredible that the volume of dirt coming out is so small.
Quote:
Originally Posted by jollyburger View Post
It was approx 324,000m3 of soil from the TBM. 40,000 from each station 55,000 at Broadway/City Hall.
Napkin calculation:

324,000m³ over 2 years = 13,500m³ per month = 675m³ per working day = 42m³ per hour for an 16-hour shift = less than 1m³ per minute.
Reply With Quote
     
     
  #1979  
Old Posted Mar 28, 2023, 11:12 PM
madog222 madog222 is offline
Moderator
 
Join Date: Jan 2014
Posts: 4,215
Project news releases said up to 18m/day, at 6m diameter that's a max of 510m³/day for one TBM averaging to 0.35m³/min. They don't continuously progress though (to install the liner segments) so the actual flow whenever spoil is coming down the conveyor would be higher.
Reply With Quote
     
     
  #1980  
Old Posted Mar 28, 2023, 11:13 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,807
Quote:
Originally Posted by aberdeen5698 View Post
Napkin calculation:

324,000m³ over 2 years = 13,500m³ per month = 675m³ per working day = 42m³ per hour for an 16-hour shift = less than 1m³ per minute.
And then two tunnels so half of that since only the single TBM is running.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 6:22 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.