HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > Austin


Reply

 
Thread Tools Display Modes
     
     
  #8941  
Old Posted Mar 23, 2023, 8:33 PM
freerover freerover is offline
Registered User
 
Join Date: Nov 2017
Posts: 2,395
Quote:
Originally Posted by H2O View Post
But for how long? Even the TxDOT spokesman said "We know we can't build our way out of congestion". And yet they keep trying.
This is less of a freeway expansion project and more like a new freeway. 183 south of 71 is just a road.
Reply With Quote
     
     
  #8942  
Old Posted Mar 23, 2023, 9:22 PM
atxsnail atxsnail is offline
Registered User
 
Join Date: Feb 2014
Posts: 608
Quote:
Originally Posted by H2O View Post
But for how long? Even the TxDOT spokesman said "We know we can't build our way out of congestion". And yet they keep trying.
I don't think it's set up for dynamic pricing, but when it comes to that point they can increase tolls. The toll road is at least theoretically congestion-resistant though of course that leads to other issues like equity
Reply With Quote
     
     
  #8943  
Old Posted Mar 24, 2023, 12:55 AM
Sigaven Sigaven is offline
Registered User
 
Join Date: Jan 2010
Posts: 1,585
Quote:
Originally Posted by dilliam View Post
It all comes down to inflation and the interest rate hikes that followed. We just can afford to service the same amount of debt as we originally planned for.

Depressing as hell, but honestly, I'd vote to raise more funds again if it meant we could get the original plan.
Same here, please, take my money.
Reply With Quote
     
     
  #8944  
Old Posted Mar 24, 2023, 4:53 PM
ahealy's Avatar
ahealy ahealy is offline
Registered User
 
Join Date: Jul 2008
Location: San Antonio / Austin
Posts: 2,843
Not to beat a dead horse, but I really cannot believe this is happening with project connect. I need to rant.

Last night I sat up in bed thinking of all the ads, articles and promise back in '20. I encouraged a lot of friends who normally don't vote to make this happen. The fact that we got it to pass under those circumstances/price tag during a pandemic and economic slump was astonishing....and here we are. Mark my words, this will not happen again in our lifetimes. This is THE perfect soundbite for anti-transit groups and true NIMBYs. I just have zero faith in the city/capital metro at this point. It probably doesn't help I know several individuals who work for both that I cannot stand ....or understand how they have jobs in general.

Also, I've never even heard of Yellowjacket Ln. AM I DREAMING?! WAKE ME UP!
Reply With Quote
     
     
  #8945  
Old Posted Mar 24, 2023, 4:54 PM
freerover freerover is offline
Registered User
 
Join Date: Nov 2017
Posts: 2,395
Quote:
Originally Posted by ahealy View Post
Not to beat a dead horse, but I really cannot believe this is happening with project connect. I need to rant.

Last night I sat up in bed thinking of all the ads, articles and promise back in '20. I encouraged a lot of friends who normally don't vote to make this happen. The fact that we got it to pass under those circumstances/price tag during a pandemic and economic slump was astonishing....and here we are. Mark my words, this will not happen again in our lifetimes. This is perfect bait for anti-transit groups and true NIMBYs. I just have zero faith in the city/capital metro at this point. It probably doesn't help I know several individuals who work for both that I cannot stand ....or understand how they have jobs in general.

Also, I've never even heard of Yellowjacket Ln. AM I DREAMING?! WAKE ME UP!

Surely you can understand why a street you never heard of would be where they would put the train yard / maintenance facility?
Reply With Quote
     
     
  #8946  
Old Posted Mar 24, 2023, 5:00 PM
ahealy's Avatar
ahealy ahealy is offline
Registered User
 
Join Date: Jul 2008
Location: San Antonio / Austin
Posts: 2,843
Quote:
Originally Posted by freerover View Post
Surely you can understand why a street you never heard of would be where they would put the train yard / maintenance facility?
Oh, I thought Yellowjacket was there the line ends? I understood that to be the end destination, which, in my mind is the line to nowhere.
Reply With Quote
     
     
  #8947  
Old Posted Mar 24, 2023, 5:12 PM
freerover freerover is offline
Registered User
 
Join Date: Nov 2017
Posts: 2,395
Quote:
Originally Posted by ahealy View Post
Oh, I thought Yellowjacket was there the line ends? I understood that to be the end destination, which, in my mind is the line to nowhere.
Nowhere is where train yards go because you need a lot of relatively cheap land.
Reply With Quote
     
     
  #8948  
Old Posted Mar 24, 2023, 5:15 PM
ahealy's Avatar
ahealy ahealy is offline
Registered User
 
Join Date: Jul 2008
Location: San Antonio / Austin
Posts: 2,843
Quote:
Originally Posted by freerover View Post
Nowhere is where train yards go because you need a lot of relatively cheap land.
I don't think the original proposals were expensive lines to nowhere though?? Were they?
Reply With Quote
     
     
  #8949  
Old Posted Mar 24, 2023, 5:48 PM
freerover freerover is offline
Registered User
 
Join Date: Nov 2017
Posts: 2,395
Quote:
Originally Posted by ahealy View Post
I don't think the original proposals were expensive lines to nowhere though?? Were they?


Since when is downtown, UT, Auditorium Shores, Oltorf, east riverside, SoCo, Monopolis, the capitol and North Campus 'nowhere'?

Are you entirely hung up on the literal last stop of the line? Maybe you've never used other transit systems but it's not uncommon for a line to terminate outside of the urban core that most people might not attend. I can assure you though there are a lot of working class families that live at Monopolies and Yellow Jacket (basically 71) that might not appreciate the sentiment. Also pointing out the obvious advantage of having the line end along a major highway with a park and ride. People coming form 130 or Bastrop can park at Yellowjacket and take the line to any of the non-nowhere stops which is (again) quite common with public transit.

Last edited by freerover; Mar 24, 2023 at 5:59 PM.
Reply With Quote
     
     
  #8950  
Old Posted Mar 24, 2023, 6:25 PM
papertowelroll papertowelroll is offline
Registered User
 
Join Date: Dec 2017
Posts: 323
Quote:
Originally Posted by Enghum View Post
My initial reaction is that the Partial Elevated: 29th to Oltorf to Yellow jacket would be the most likely to get us to a successful vote on phase 2. Get construction started and tee up a vote on phase 2 for 2026 on extensions North and south on the Orange line plus to the airport. Phase 3 vote would be the second river crossing, gold line extension, Orange line to tech ridge, and Orange line to Slaughter after the initial operating segment is completed in 2030. That gets us nearly everything in the initial plan by 2040. Seattle did this really well with their vote timings and maintaining voter motivations for each phase of their plan.

Edit: I know pleasant valley to North Lamar isn't a bad plan. I am just afraid that is all we will get done for a while.
As a north loop resident I much prefer the North Lamar to Pleasant Valley plan, and I think that's easily the most functional of these as a standalone system, even if it is at grade downtown.

That said you make a compelling argument for the Partial Elevated plan, and I think I have to agree with you that it might be the best way to go. It gives us grade separation downtown and serves three directions decently, but not good enough to keep them from voting for extensions. While it really sucks compared to what was originally proposed it would still be amazing for Austin to build this system IMO. The absolute worse thing we can do is build nothing.
Reply With Quote
     
     
  #8951  
Old Posted Mar 24, 2023, 6:35 PM
papertowelroll papertowelroll is offline
Registered User
 
Join Date: Dec 2017
Posts: 323
Quote:
Originally Posted by papertowelroll View Post
As a north loop resident I much prefer the North Lamar to Pleasant Valley plan, and I think that's easily the most functional of these as a standalone system, even if it is at grade downtown.

That said you make a compelling argument for the Partial Elevated plan, and I think I have to agree with you that it might be the best way to go. It gives us grade separation downtown and serves three directions decently, but not good enough to keep them from voting for extensions. While it really sucks compared to what was originally proposed it would still be amazing for Austin to build this system IMO. The absolute worse thing we can do is build nothing.
The one thing that really, really sucks about the partial elevated plan is that it doesn't have a single red line connection. I really like the idea of this new line giving the red line a boost of usefulness, and I don't think that happens here.
Reply With Quote
     
     
  #8952  
Old Posted Mar 24, 2023, 6:40 PM
ahealy's Avatar
ahealy ahealy is offline
Registered User
 
Join Date: Jul 2008
Location: San Antonio / Austin
Posts: 2,843
Quote:
Originally Posted by freerover View Post

Since when is downtown, UT, Auditorium Shores, Oltorf, east riverside, SoCo, Monopolis, the capitol and North Campus 'nowhere'?

Are you entirely hung up on the literal last stop of the line? Maybe you've never used other transit systems but it's not uncommon for a line to terminate outside of the urban core that most people might not attend. I can assure you though there are a lot of working class families that live at Monopolies and Yellow Jacket (basically 71) that might not appreciate the sentiment. Also pointing out the obvious advantage of having the line end along a major highway with a park and ride. People coming form 130 or Bastrop can park at Yellowjacket and take the line to any of the non-nowhere stops which is (again) quite common with public transit.
Yes, I am familiar with mass public transit plans.

...and I don't care if someone doesn't like my comment about that area tbh .

That particular route is crap, which the vast majority of Austin will not use. We need N + S connectivity, not UT, DT to....a park and ride.
Reply With Quote
     
     
  #8953  
Old Posted Mar 24, 2023, 7:02 PM
freerover freerover is offline
Registered User
 
Join Date: Nov 2017
Posts: 2,395
Quote:
Originally Posted by ahealy View Post
Yes, I am familiar with mass public transit plans.

...and I don't care if someone doesn't like my comment about that area tbh .

That particular route is crap, which the vast majority of Austin will not use. We need N + S connectivity, not UT, DT to....a park and ride.
It's also not my favorite plan but you were were the one referencing it. There is a more N/S route that goes all the way to 183 with 40,000 projected daily users so maybe reference that one?

Obviously we want to build the entire system. This is the 1st phase. Once you build the first section, then you extend it. That's. literally how all transit systems work.


Quote:
Originally Posted by papertowelroll View Post
The one thing that really, really sucks about the partial elevated plan is that it doesn't have a single red line connection. I really like the idea of this new line giving the red line a boost of usefulness, and I don't think that happens here.

Yeah, not my favorite plan and I doubt it gets picked. If it does, not sure if it makes more sense to still try to go up trinity and cross 4th with LRT or extend the Red/Greed line from the convention center to Republic Square.

Last edited by freerover; Mar 24, 2023 at 7:21 PM.
Reply With Quote
     
     
  #8954  
Old Posted Mar 24, 2023, 8:14 PM
ahealy's Avatar
ahealy ahealy is offline
Registered User
 
Join Date: Jul 2008
Location: San Antonio / Austin
Posts: 2,843
Quote:
Originally Posted by freerover View Post
It's also not my favorite plan but you were were the one referencing it. There is a more N/S route that goes all the way to 183 with 40,000 projected daily users so maybe reference that one?

Obviously we want to build the entire system. This is the 1st phase. Once you build the first section, then you extend it. That's. literally how all transit systems work.





Yeah, not my favorite plan and I doubt it gets picked. If it does, not sure if it makes more sense to still try to go up trinity and cross 4th with LRT or extend the Red/Greed line from the convention center to Republic Square.
For sure...and I don't mean to be short, just pissy about all this. Which plan do you think will actually come to fruition? I wonder if PRT might come into the picture again. Just build "The Wire" system

Reply With Quote
     
     
  #8955  
Old Posted Mar 24, 2023, 9:20 PM
freerover freerover is offline
Registered User
 
Join Date: Nov 2017
Posts: 2,395
Quote:
Originally Posted by ahealy View Post
For sure...and I don't mean to be short, just pissy about all this. Which plan do you think will actually come to fruition? I wonder if PRT might come into the picture again. Just build "The Wire" system

I get it. No one is happy. The reality is we can't afford what we want and that's always a shitty feeling. However, we have to look forward and we need to work towards sustainable city design. This gets us toward that goal.
Reply With Quote
     
     
  #8956  
Old Posted Mar 24, 2023, 9:24 PM
Novacek Novacek is offline
Registered User
 
Join Date: Jan 2013
Posts: 2,583
Quote:
Originally Posted by ahealy View Post
Just build "The Wire" system
You think we're seeing cost increases now
Reply With Quote
     
     
  #8957  
Old Posted Mar 24, 2023, 10:56 PM
freerover freerover is offline
Registered User
 
Join Date: Nov 2017
Posts: 2,395
Reply With Quote
     
     
  #8958  
Old Posted Mar 25, 2023, 4:16 PM
ahealy's Avatar
ahealy ahealy is offline
Registered User
 
Join Date: Jul 2008
Location: San Antonio / Austin
Posts: 2,843
Interesting. Are they also doing a sort of racial equity study? Not sure why BIPOC is on the chart? Our is it something else?

Seems like N. Lamar meets everything head on
Reply With Quote
     
     
  #8959  
Old Posted Mar 25, 2023, 6:54 PM
freerover freerover is offline
Registered User
 
Join Date: Nov 2017
Posts: 2,395
Quote:
Originally Posted by ahealy View Post
Interesting. Are they also doing a sort of racial equity study? Not sure why BIPOC is on the chart? Our is it something else?

Seems like N. Lamar meets everything head on
It seems like the strongest candidate however it's all at grade so there are tradeoffs. It's jus not clear that we will need the 2050 capacity that we predicted we would pre-covid. Time is infinite so maybe we need it someday but it might not be for a really long time. Still, pedestrians and auto traffic means it's going to be slower downtown.


The layers and layers and layers of overlapping government agencies make this such an annoying process. State, county, city, federal, CAMPO, Cap Metro, and now ATP that has to work between all of them playing moderator/peacekeepr/begger. The fact that yahoos elected from east Texas hundreds of hours away have power over what we choose to do with our land is just insane.
Reply With Quote
     
     
  #8960  
Old Posted Mar 26, 2023, 1:57 AM
dilliam dilliam is offline
Registered User
 
Join Date: Jun 2021
Location: Austin, TX
Posts: 172
Quote:
Originally Posted by papertowelroll View Post
As a north loop resident I much prefer the North Lamar to Pleasant Valley plan, and I think that's easily the most functional of these as a standalone system, even if it is at grade downtown.

That said you make a compelling argument for the Partial Elevated plan, and I think I have to agree with you that it might be the best way to go. It gives us grade separation downtown and serves three directions decently, but not good enough to keep them from voting for extensions. While it really sucks compared to what was originally proposed it would still be amazing for Austin to build this system IMO. The absolute worse thing we can do is build nothing.
I have this exact same opinion. We have to start building ASAP and this one, while not quite extensive enough, will keep them wanting more basically teasing N/S/E Austin lol
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > Austin
Forum Jump



Forum Jump


All times are GMT. The time now is 6:09 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.