Quote:
Originally Posted by Geckos_Rule
How much of this budget is dedicated towards property purchases though? While surely the plan needs some, I can't imagine it needing a lot more than the city (or state) already owns near all of these lines.
|
When they actually did the parcel by parcel design, real estate estimates for the initial plan went from ~250M to almost 1 billion.
These proposals cut the length by about half, but a lot of the cuts are more on the edges. So you still need land in the most expensive areas, so I wouldn’t be surprised if real estate costs are still near that figure.
In most places the existing RoW is enough for the existing travel lanes, maybe a center turn lane, and sidewalks if we’re lucky.
To that you need to add two tracks, sometimes an extra turn lane, sometimes stations or track approaching stations, bike lanes or shared use paths…
Plus whatever they need for the maintenance yard.