HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Feb 16, 2023, 12:03 AM
TMB14 TMB14 is offline
Registered User
 
Join Date: Sep 2020
Posts: 77
Quote:
Originally Posted by Festivus View Post
The new rebuilds (north and south) are not P3s, but are joint-operations between the Public and Catholic boards. They will be very close in design to the P3s, however, as those followed modern school design standards (as did other recent non-P3 builds, such as Connaught, Sacred Heart, etc).
Architecturally, at least on the exterior, those non-P3 schools look leaps and bounds better than the P3's. The P3 builds have exteriors that look like stacked up shipping containers or almost a prison vibe going on.

I know what matters is what happens inside the buildings, but in the case of Harbour Landing, it's bursting at the seams.

I'm just happy knowing that when the time comes that my kids will be going to a newly built and hopefully well-designed school in Lakeview.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 11:28 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.