Quote:
Originally Posted by Base
|
Quote:
"Elevating it changes that perception to a metro system where it's fairly disconnected from the community," Sutherland argues.
A raised track would look similar to Vancouver's SkyTrain and create a visual and psychological barrier, Sutherland said.
"It wouldn't feel like it's a neighbourhood streetcar anymore, it would feel like you're getting on to a major metro system."
|
Is it a streetcar or LRT or a metro? Maybe we should stop trying to build streetcars to the far flung burbs?
I'll get the popcorn ready for when we start sending a train down this line every 2.5 minutes in each direction at peak hours, should we ever get this line running lol
Quote:
Learn from past mistakes, avoid delays
It's safe to say nobody wants delays and technical problems similar to those that beset the Metro Line, which opened two years after the initial deadline.
Henderson said he wants the city to get the Valley Line right.
"I suspect they're being extra cautious after the Metro Line decision was made, which was made without good information," Henderson said of the recent report.
|
... well... I guess that didn't pan out.
Quote:
|
Building the $1.8-billion southeast portion of the Valley Line between Mill Woods and downtown is expected to take another two years.
|
but adding another .2 B to get the line right was too expensive?