Quote:
Originally Posted by Hotwax
My picture from Saturday, 28-Jan-2023
Enlarge
|
Great Image.
one can see why the TBM is only pulled out about 70 feet or so. The first 70 feet is where all the "expendables" are located (cutters, hydraulics, etc.) where all the wear and tear really goes on.
So, a couple of weeks of this, then off she goes.
Does anyone know for sure whether the spoils will be extracted at Main Street or whether the conveyor belt goes all the way back to the flats.
I can't imagine the TBM having a 5 kilometer conveyor belt carrying spoils as it approached Arbutus.
And, they cannot start prepping that part of the tunnel for tracks etc, until the belt assembly is gone.