Quote:
Originally Posted by jollyburger View Post
Found this note about the Grandview Cut/BNSF
Quote:
...In addition, the City assumed ownership of and liability for maintenance and replacement of the bridges over the Grandview Cut, for which Burlington Northern compensated the City.
That's interesting. Does that mean that BNSF paid for the new bridges that were built at the same time as the Skytrain went into the cut? I know they replaced the bridges at Nanaimo St. and Lakeview Drive, and I think perhaps Woodland as well.
     
     
  #23822  
Old Posted Jan 11, 2023, 1:27 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
Quote:
Originally Posted by jollyburger View Post
Found this note about the Grandview Cut/BNSF

https://council.vancouver.ca/previous_years/000201/a9.htm
I think the delay was about RoW for the station site over the BNSF yards, as the guideway was built and sitting idle all the way to Clark Drive or so.
     
     
  #23823  
Old Posted Jan 11, 2023, 1:49 AM
Changing City's Avatar
Changing City Changing City is online now
Registered User
 
Join Date: Nov 2016
Posts: 8,343
Quote:
Originally Posted by VancouverOfTheFuture View Post
next time you're on the street, stand in the middle median and look at the lamp standards on both sides. you'll see they are tilted back slightly. this was done on purpose with the intent to build the street car. the weight of the overhead lines would have pulled them upright to be straight. its kind of funny looking. i wonder when those poles need to be replaced, if they'll install them straight over slightly tilted.

they really did plan to build it! but it was killed long after it was planned.
Who is 'they'? Who was going to pay for it? And who was going to run it?

As far as I understand the situation, the City Engineers have continued to ensure that a streetcar system could be built, by ensuring there's a viable right-of-way wherever new developments are built (like the W1st median), but it hasn't been 'killed', because it has never been 'alive'. City reports reference the intention for TransLink to operate the route, and there has never been any commitment from TransLink to do so. The City have never pushed the idea because getting the Broadway SkyTrain built is much more important. Council request updates from time to time, and get updated cost estimates, usually prepared by a consultant, but they don't go any further. The last person who said they wanted it built was Susanne Anton who had it in her bag of goodies to pursue if she was elected mayor. She lost.
     
     
  #23824  
Old Posted Jan 11, 2023, 3:32 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,824
Quote:
Originally Posted by officedweller View Post
I think the delay was about RoW for the station site over the BNSF yards, as the guideway was built and sitting idle all the way to Clark Drive or so.
Yeah I think Wikipedia mentioned that but the article they referenced was deleted.
     
     
  #23825  
Old Posted Jan 11, 2023, 4:25 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
     
     
  #23826  
Old Posted Jan 11, 2023, 7:32 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by chowhou View Post
The Squamish Nation + Westbank are pushing for it again as part of Senakw so maybe we'll see some movement this decade.
don't bet on it. as of now, TransLink has 0 interest in any streetcar. they hate the system from my understanding. the costs of it aren't worth it in their eyes (i agree). and as of now, no other city can operate a competing system against TransLink. so in other words, only TransLink could do it, and they don't want to.

Quote:
Originally Posted by Changing City View Post
Who is 'they'? Who was going to pay for it? And who was going to run it?

As far as I understand the situation, the City Engineers have continued to ensure that a streetcar system could be built, by ensuring there's a viable right-of-way wherever new developments are built (like the W1st median), but it hasn't been 'killed', because it has never been 'alive'. City reports reference the intention for TransLink to operate the route, and there has never been any commitment from TransLink to do so. The City have never pushed the idea because getting the Broadway SkyTrain built is much more important. Council request updates from time to time, and get updated cost estimates, usually prepared by a consultant, but they don't go any further. The last person who said they wanted it built was Susanne Anton who had it in her bag of goodies to pursue if she was elected mayor. She lost.
the original intention was to rebuild the Downtown Historic Railway from Granville Island - Science world. and either 1, TransLink would have been pushed to operate the line as they legally are the only ones who can. or 2, to petition the BC government to give CoV an exemption to allow them to operate the line themselves.

what was killed was the rebuilding of the Downtown Historic Railway, and all the associated infrastructure which then of course killed any other plans for the line to open.

i don't see it ever happening unless CoV operates it, and as of now they cant. i don't really see it ever happening in the future since it would be expensive; i think it is forever dead.
     
     
  #23827  
Old Posted Jan 11, 2023, 7:45 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,185
On hiatus, yeah, but it's not dead per se unless the City (and the MST) give away the ROW to something else.
     
     
  #23828  
Old Posted Jan 11, 2023, 2:32 PM
dpogue dpogue is online now
Registered User
 
Join Date: Aug 2013
Posts: 770
Quote:
Originally Posted by VancouverOfTheFuture View Post
don't bet on it. as of now, TransLink has 0 interest in any streetcar. they hate the system from my understanding. the costs of it aren't worth it in their eyes (i agree). and as of now, no other city can operate a competing system against TransLink. so in other words, only TransLink could do it, and they don't want to.
Any city or company can ask TransLink for permission to operate an independent transit service in their city. Usually they just need to provide data showing that it won't interfere with TransLink operations and won't steal major ridership. Often things will get approved for an initial pilot, with a request for the operator to come back with data after the pilot for full approval.

For something like the downtown heritage railway from Main Street to Olympic Village to Granville Island, I don't see why that wouldn't get approved.

For a full streetcar line down the Arbutus corridor, there would probably be some more involved discussions.
     
     
  #23829  
Old Posted Jan 11, 2023, 4:17 PM
Changing City's Avatar
Changing City Changing City is online now
Registered User
 
Join Date: Nov 2016
Posts: 8,343
Quote:
Originally Posted by VancouverOfTheFuture View Post
the original intention was to rebuild the Downtown Historic Railway from Granville Island - Science world. and either 1, TransLink would have been pushed to operate the line as they legally are the only ones who can. or 2, to petition the BC government to give CoV an exemption to allow them to operate the line themselves.

what was killed was the rebuilding of the Downtown Historic Railway, and all the associated infrastructure which then of course killed any other plans for the line to open.

i don't see it ever happening unless CoV operates it, and as of now they cant. i don't really see it ever happening in the future since it would be expensive; i think it is forever dead.
If there was ever an intention by the City to rebuild the Downtown Historic Railway, it was so far back in time that it's irrelevant. That wasn't why the Arbutus corridor was acquired, for example.

And the Downtown Historic Railway was never transit. It was a publicly subsidized tourist attraction. The fact that it no longer operates doesn't affect any potential future streetcar operation.
     
     
  #23830  
Old Posted Jan 11, 2023, 4:30 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,736
Quote:
Originally Posted by VancouverOfTheFuture View Post
next time you're on the street, stand in the middle median and look at the lamp standards on both sides. you'll see they are tilted back slightly. this was done on purpose with the intent to build the street car. the weight of the overhead lines would have pulled them upright to be straight. its kind of funny looking. i wonder when those poles need to be replaced, if they'll install them straight over slightly tilted.

they really did plan to build it! but it was killed long after it was planned.
Interesting, I will do that.

It's the City half assing things again. They should have known it would be years or decades away, realistically. The space could have been set aside as it has been, but with better temporary use in the mean time.

If and when it gets built, I bet they will replace those lamps.
     
     
  #23831  
Old Posted Jan 11, 2023, 6:00 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,824
Quote:
Originally Posted by WarrenC12 View Post
Interesting, I will do that.

It's the City half assing things again. They should have known it would be years or decades away, realistically. The space could have been set aside as it has been, but with better temporary use in the mean time.

If and when it gets built, I bet they will replace those lamps.
I doubt they need to lean the light poles to support a catenary system let alone have wires that have enough tension on them to cause them to straighten them out.
     
     
  #23832  
Old Posted Jan 13, 2023, 4:00 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
Related to the streetcar discussion -
story on the housing project near Granville Island that will be built on the former RoW having a straighter route leading to Senakw.
The plan would now be to have the streetcar take sharp turns on the street.

100 rental homes and retail proposed for parking lot near Granville Island
https://dailyhive.com/vancouver/1595-west-2nd-avenue-vancouver-rental-housing


https://dailyhive.com/vancouver/1595-west-2nd-avenue-vancouver-rental-housing


https://dailyhive.com/vancouver/1595-west-2nd-avenue-vancouver-rental-housing


https://dailyhive.com/vancouver/1595-west-2nd-avenue-vancouver-rental-housing


https://dailyhive.com/vancouver/1595-west-2nd-avenue-vancouver-rental-housing
     
     
  #23833  
Old Posted Jan 13, 2023, 4:16 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,185
I believe that's been a thing since before the lockdown - the last open house had it taking up the whole site as well.

Not sure how a straight shot down Fir will mix with the buses. The 4, 7, et al use it to get from the Granville loop to 4th, and that could be a problem if TransLink doesn't reroute them.
     
     
  #23834  
Old Posted Jan 13, 2023, 4:30 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
Yeah, having the tracks on street on Fir has been the City's plan for a while.
     
     
  #23835  
Old Posted Jan 13, 2023, 7:17 AM
Helvetia's Avatar
Helvetia Helvetia is offline
Registered User
 
Join Date: Jan 2023
Location: North Delta
Posts: 98
I heard somewhere that the area on the Canada Line where Capstan station is being built had the power rails switched to be on the far side (relative to the future passenger platforms) in preparation for the now-under-construction station. Were any measures taken during construction to facilitate future 33rd/57th Ave stations?
     
     
  #23836  
Old Posted Jan 14, 2023, 2:51 AM
Express691 Express691 is offline
Registered User
 
Join Date: Aug 2015
Posts: 650
Quote:
Originally Posted by Helvetia View Post
I heard somewhere that the area on the Canada Line where Capstan station is being built had the power rails switched to be on the far side (relative to the future passenger platforms) in preparation for the now-under-construction station. Were any measures taken during construction to facilitate future 33rd/57th Ave stations?
The power rail is continuous in these areas (unlike Capstan). However I am not certain if there are any structures/other indicators built in at 33rd/57th.
     
     
  #23837  
Old Posted Jan 14, 2023, 2:58 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,218
RFP is up for construction of the Scott Road R6 Rapid Bus street modifications.

http://discovery.ariba.com/rfx/15115845

Quote:
The Work comprises of the creation of bus priority measures from Scott Road Station to Newton Exchange via 72nd Avenue as part of the creation of the R6 RapidBus line.
Scope:


Image from Translink
     
     
  #23838  
Old Posted Jan 14, 2023, 5:08 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,824
Quote:
Originally Posted by Helvetia View Post
I heard somewhere that the area on the Canada Line where Capstan station is being built had the power rails switched to be on the far side (relative to the future passenger platforms) in preparation for the now-under-construction station. Were any measures taken during construction to facilitate future 33rd/57th Ave stations?
Quote:
TransLink’s February 26, 2016, letter to the City states that the cost of an “underground infill station on the Canada Line is not known” but references a meeting with the City in 2014, at which time TransLink offered a “ballpark” construction cost estimate of $90 million;
Quote:
TransLink’s February 26, 2016, letter to the City states that, “even if the [57th Avenue] station is fully funded by a third party, the implementation timeline is expected to be no less than ten years and may be prolonged” due to significant engineering challenges that would increase the complexity of station construction;
https://council.vancouver.ca/20171128/documents/motionb3.pdf
     
     
  #23839  
Old Posted Jan 14, 2023, 5:20 AM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,597
Quote:
Originally Posted by madog222 View Post
RFP is up for construction of the Scott Road R6 Rapid Bus street modifications.

http://discovery.ariba.com/rfx/15115845
I still have no idea why they insist on having a stop at 75A instead of one stop south (which would put it close to Scottsdale Exchange).
     
     
  #23840  
Old Posted Jan 14, 2023, 5:40 AM
Helvetia's Avatar
Helvetia Helvetia is offline
Registered User
 
Join Date: Jan 2023
Location: North Delta
Posts: 98
Quote:
Originally Posted by Express691 View Post
The power rail is continuous in these areas (unlike Capstan). However I am not certain if there are any structures/other indicators built in at 33rd/57th.
Quote:
Originally Posted by jollyburger View Post
Thank you both! This is more information than I was expecting to find.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 3:05 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.