Quote:
Originally Posted by Tvisforme
Would a tunnel through the UEL be cheaper? Looking at that path, it would appear to go through the golf course, which might lend itself to cut-and-cover without the need to accommodate traffic and businesses.
|
The cost of building two tunnel to elevated transitions likely makes the short elevated section less of a cost saver.
I would bet on the UEL portion being cut and cover to drive down costs regardless of which option they choose (elevated or fully tunneled), with that wide median running the length of University Blvd it would make sense to excavate along that and then build traffic decks similar to what we're seeing around the stations on Broadway right now.
Another factor is that the Musqueam own the golf course and they have previously stated they want to build housing on it when the lease expires. Building the tunnel option across the golf course would allow them to build the potential infill station shown right in the middle of the development, should they eventually want to go ahead with it.