Quote:
Originally Posted by Klazu
Not sure if this has been addressed before, but are SkyTrain column concrete slabs always this massive this deep into the ground or have they been continuously reinforced, as they went on with the excavation? It seems like total over-engineering to have them that bulky anywhere else than here.
|
I would have to imagine that extra reinforcement was done (and continuously being done) as excavation was ongoing, since, as you remove earth and dirt, you're essentially removing what the columns brace against to support the guideway (and themselves).
Probably the extra reinforcement is not just to compensate for the lost support, but also to help tie them to the project's own structural support system, which in turn is itself directly braced against the Earth, and transfers structural load onto it.
It's doubtful to me that they would have originally constructed them this massive and thick, since you don't really need that much structural support, when everything that's being supported is above grade.
There's probably some over-engineering (as is standard practice a lot of the time) but likely not much more so than you'd find for similar kinds of structures anywhere else in the world.
Engineers usually tend to over-engineer and over-compensate to provide extra redundancy in situations like this.
EDIT :I've also thought of some other reason they might have to rebuild them this massive.
Because the columns support is now essentially tied to the buildings' own support underground, could another reason be to reduce or buffer the inevitable extra live-load vibrations you'll be getting from skytrain cars running back and forth transferring to the buildings' own structure?