Quote:
Originally Posted by swimmer_spe
Project NEXUS, of which you feel should be in the fantasy page.
How much does Translink pay for you to troll here?
|
When you resort to dumb questions like that all it does is lower your credibility (and that’s not easy to do). TransLink don't pay me, I pay them (to ride their buses and trains).
Project Nexus is a wonderful ‘what if we had a lot of money to spend on transit’ document, but the cost estimates fall very firmly into the realm of fantasy. It’s not good enough to suggest ‘tunneling costs should be less’. They aren’t.
The report’s suggestion is that bored tunnels could be built at $100m per km. I suggest that’s out by about a factor of five. The current Broadway extension is 5.7km (not all in tunnels) and it’s $2.83bn. That’s $500m per km. That’s a realistic cost for what twin 6m tunnels with underground stations cost in Vancouver – because that’s what it’s costing. A single 10m bore isn't particularly cheaper than two 6m tunnels we're building - there's a third extra spoil to have to dispose of.
Our costs are not on the high side of costs for that sort of project in North America, or elsewhere.
Sidney is building a 24km transit line with 11km in tunnels. It comes out at $460/km (Canadian $).
In the US tunnels outside New York are $600m to $900m per mile (US $). That’s from $510m (Canadian) per km to $760m. (New York is off-the-scale more expensive).
So, I’d be amazed if all the elements of Nexus could be built for less than $50bn. And it’s supposed to be built
as well as all the Translink projects. Those are easily 20 years worth of transit funding at current rates of investment from the sources we have. We can’t even raise the capital to build the UBC extension yet.
If there were $50bn lying around (or $30bn, or even $11bn) looking to be spent in capital projects, some would fund some transit, but most would go to reducing homelessness, and to improve healthcare facilities, some to create greater resilience against climate change, some to upgrade our replace health facilities, some to finally deal with the seismic upgrades needed to schools and other public buildings. Some might go to municipalities and Metro to upgrade the basic infrastructure like sewers, water mains, provide more charging stations, improve energy efficiency of public buildings and public housing.
Those are already identified as priorities that need money spent, that doesn’t currently exist. There is no $50bn. If there was, it wouldn’t go to ‘it would be great if we had better transit’ – that would be a fantasy, and that’s exactly what’s discussed in the fantasy thread (where nobody worries about what anything would cost in reality).