HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Nov 17, 2022, 6:09 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,161
Quote:
Originally Posted by Aroundtheworld View Post
The $11 B estimate in this proposal is not for high-speed rail but for rail with a design speed of less than 200 kph (most of it at 160 kph). The reason why HSR is so much more expensive is every aspect needed to accommodate vehicles going at 350 kph is more expensive. Your turning radius is more than 4x greater, necessitating more tunnels and viaducts. The tunnel entrances have to be designed differently to deal with the boom effect, etc

The high-speed rail component in Project Nexus is only for the Canadian portion of the line and does not include the portion built south of the border....
Right, and that's why I'm using the GO expansion - regular heavy rail - as the benchmark instead. $13.5 billion over 150 km gives me $90m/km; with 350 km, that's $31.5 billion, or almost 3x the lowball estimate.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 6:25 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.