Quote:
Originally Posted by ilikeredheads View Post
It creates more problems than it solves that's why you don't see transit systems anywhere in the world do this.
They do this in London, no?
Reply With Quote
     
     
  #1542  
Old Posted Oct 20, 2022, 5:14 PM
Unregistered User Unregistered User is offline
Registered User
 
Join Date: Sep 2018
Posts: 40
Quote:
Originally Posted by Tvisforme View Post
This might be a silly question, but what is the overall length limit for SkyTrain cars that allow walk-through (IIRC Mark II and newer) and also on the Canada Line? I'm just curious if it is possible to increase carrying capacity by using trains that are slightly longer than the stations - perhaps one extra car - and having the doors at the far ends of the train stay closed? Passengers at teh ends of the train would have to walk half a car, but that's not too onerous if it means more capacity.

Instead of:

[ O O ][ O O ][ O O ][ O O ]
+--------------------------+

run them as:

[ X O ][ O O ][ O O ][ O O ][ O X ]
++++---------------------------++++


("O" = opening doors, "X" = closed door, "-" = platform, "+" = end of platform)
I'd much prefer they do this for the Canada Line using full-sized 20 metre middle cars rather than the truncated 10 metre C-cars that have been proposed for any capacity expansion. A 60 metre Canada Line train would fill a 50 metre platform with only *one* set of doors at one of the ends being inaccessible. You could establish that the end section of the trains are for "long-haulers" who are riding from terminus to terminus (maybe the seats in that section could be a different colour to signal that there is something special about it) or more daringly: set up some sort of a system where which end hangs off the edge of the platform alternates from station to station. I think the inconvenience of either would be a reasonable price to pay for a 50% increase in capacity.
Reply With Quote
     
     
  #1543  
Old Posted Oct 20, 2022, 6:05 PM
MistyMountain MistyMountain is offline
Registered User
 
Join Date: May 2020
Posts: 72
Quote:
Originally Posted by Unregistered User View Post
They do this in London, no?
They do it in London where it is physically impossible to extend the platforms, for instance where it would cut into other lines. It's not a great solution because it severely limits capacity.

When you do that you don't get the full additional peak capacity granted by the additional car because the rate people can get on and off is limited.
Reply With Quote
     
     
  #1544  
Old Posted Oct 20, 2022, 7:07 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Migrant_Coconut View Post
I figure it's also a bad idea in case of an emergency - can you imagine all the car's passengers rushing for the same door? Half a car extra, at the most.
Yet over on the Heavy Rail thread you tout that they can be extended no problem.
Reply With Quote
     
     
  #1545  
Old Posted Oct 20, 2022, 7:24 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,126
Quote:
Originally Posted by swimmer_spe View Post
Yet over on the Heavy Rail thread you tout that they can be extended no problem.
They can, as soon as we lengthen the stations; at the moment, the stations are long enough and the problem is lack of cars. Even you have to realize how petty you're being at the moment.
Reply With Quote
     
     
  #1546  
Old Posted Oct 20, 2022, 7:44 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Migrant_Coconut View Post
They can, as soon as we lengthen the stations; at the moment, the stations are long enough and the problem is lack of cars. Even you have to realize how petty you're being at the moment.
How do you extend a tunnel station if there are no knock out sections?
Reply With Quote
     
     
  #1547  
Old Posted Oct 20, 2022, 8:04 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,159
Quote:
Originally Posted by swimmer_spe View Post
How do you extend a tunnel station if there are no knock out sections?
By digging.
Reply With Quote
     
     
  #1548  
Old Posted Oct 20, 2022, 11:31 PM
Dave2 Dave2 is online now
Registered User
 
Join Date: Dec 2007
Posts: 542
Quote:
Originally Posted by Unregistered User View Post
They do this in London, no?
Until relatively recently they did something similar in New York on the 1 line at South Ferry. Only the first five (of eight iirc) cars had access to the platforms.

Last edited by Dave2; Oct 20, 2022 at 11:32 PM. Reason: a word
Reply With Quote
     
     
  #1549  
Old Posted Oct 21, 2022, 3:07 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by madog222 View Post
By digging.
Very expensive digging.
Reply With Quote
     
     
  #1550  
Old Posted Oct 21, 2022, 9:11 PM
NicholasHui NicholasHui is offline
Registered User
 
Join Date: Oct 2020
Posts: 38
They are going to have 4 through lanes on the traffic deck completed by the morning of October 22. Soon after they are going to do the bulk excavation and building the station.
Reply With Quote
     
     
  #1551  
Old Posted Oct 21, 2022, 10:14 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,649
Quote:
Originally Posted by NicholasHui View Post
They are going to have 4 through lanes on the traffic deck completed by the morning of October 22. Soon after they are going to do the bulk excavation and building the station.
That's the Oak Street notice? Seems like a few more weeks to complete the Cambie sewer work in the middle of the road.
Reply With Quote
     
     
  #1552  
Old Posted Oct 24, 2022, 8:06 PM
Hooknose Hooknose is offline
Registered User
 
Join Date: Mar 2017
Posts: 248
how far has the machone gone in 10 days

Since the TBM started Saturday 10 days ago, it should have "disappeared" already down a tunnel of its own making.

Does anyone have an image of how much of the TBM is still visible, if any.

In the rapid transit of the golf phrase, "you put for money but you drive for show"..perhaps we could say, "you tunnel for importance but you lay track for show" ... or something like this.
Have fun with this, if you like.
Reply With Quote
     
     
  #1553  
Old Posted Oct 24, 2022, 8:10 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,608
Given the distance and the 1 year time frame, it should be doing around 15-18m/day by my math.
Reply With Quote
     
     
  #1554  
Old Posted Oct 24, 2022, 10:16 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,159
I walked past today, there’s about 50m of TBM sticking out so it’s progressed around 100 meters.
Reply With Quote
     
     
  #1555  
Old Posted Oct 25, 2022, 6:09 AM
Hooknose Hooknose is offline
Registered User
 
Join Date: Mar 2017
Posts: 248
Quote:
Originally Posted by madog222 View Post
I walked past today, there’s about 50m of TBM sticking out so it’s progressed around 100 meters.
The rated performance is about 18 meters a day. If after 10 days or so , only 100 meters are already built, then they are just warming it up.

Probably smart.

If there is a glitch or two or ten, it is better to find that out now while the TBM is within reach of daylight and easy access to any maintenance facilities required.

I suspect, in a week or three, they can speed it up as they establish their regular pace.
Reply With Quote
     
     
  #1556  
Old Posted Oct 27, 2022, 6:21 AM
Zepfancouver's Avatar
Zepfancouver Zepfancouver is offline
Registered User
 
Join Date: Aug 2017
Location: Vancouver
Posts: 2,655
The Great Northern Way - Emily Carr Station

Today



I'm not sure if they're still feeding the tube with machinery or if that's the back end of the boring machine or it's a ventilate machine at the end of that tube.



Driving home I took a detour to check out our tunnelling machine and spotted a rebar cage going up on Fraser St. took a hard right and to my excitement their were installing it.


https://makeagif.com/i/GYv-NL

Sights and Sounds

Video Link
Reply With Quote
     
     
  #1557  
Old Posted Oct 27, 2022, 3:14 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,649
I guess those concrete tunnel liners and red steel cage is where the portal starts?
Reply With Quote
     
     
  #1558  
Old Posted Oct 27, 2022, 10:26 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,159
Quote:
Originally Posted by Zepfancouver View Post
I'm not sure if they're still feeding the tube with machinery or if that's the back end of the boring machine or it's a ventilate machine at the end of that tube.

I had a closer look today. That's the tail end of the TBM, last piece under the white tarp. It's mounted on rollers on a track, just visible in your picture.
For what its worth it hasn't moved between your picture yesterday and this afternoon.
Reply With Quote
     
     
  #1559  
Old Posted Oct 28, 2022, 2:32 AM
Zepfancouver's Avatar
Zepfancouver Zepfancouver is offline
Registered User
 
Join Date: Aug 2017
Location: Vancouver
Posts: 2,655
Quote:
Originally Posted by madog222 View Post
I had a closer look today...
Cool! thanks for the follow up.
I drive through Mount Pleasant at least 3 times a week using Broadway or 1st, 21 years living DT and never used G N Way to go home. I will now, for more postings.
Reply With Quote
     
     
  #1560  
Old Posted Oct 28, 2022, 6:58 AM
Hooknose Hooknose is offline
Registered User
 
Join Date: Mar 2017
Posts: 248
Does Translink have a public relations site

Why doesn't Translink have a "daily progress" web site?
Even a Saturday weekly update would be fun.
Something like
Tunnel A 2% complete
Tunnel B 0% complete
Main Street Box 15% complete

etc.

I am sure they have it for themselves.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 7:00 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.