Quote:
Originally Posted by swimmer_spe
Who said more than a second track?
We have already discussed and proven that CN has plans to add a second track. There is no reason that with that added track that CN cannot fit in a few trains. Remember, the biggest bottleneck is actually not in the Lower Mainland, but it is the Coast Mountains and the fact that CN and CP only have single track through there and adding more will be horrendously expensive. So, until that happens, the CN twinned double track will not reach peak use. I doubt any of us will be alive when that happens.
|
I said it, and it was discussed. You apparently ignored it because it doesn't fit your alternate reality. If CN add the second track that they've been planning, it's because they want to operate trains in two directions through that stretch.
The line was effectively abandoned only 20 years ago. The City of Vancouver did a planning exercice for the False Creek Flats that assumed the rail uses would almost disappear. The tracks alongside Terminal Avenue were torn up, and the land sold off for development. Few trains came through, and there were almost no delays to the few passenger trains that went into Pacific Central.
Then container traffic grew and the yards became busy again. The plan for The Flats was revisited, with rail staying and even expanding. Centerm has nearly doubled capacity. Amtrak and VIA trains can be delayed for minutes, and sometimes hours, when freight operations are in the way. Freight engines break down. Couplings break. A brake seizes on a railcar, and someone has to be called out, walk along the train, find it and free it. There are limits to the hours a driver is allowed to operate the train - if an incident delays a train, sometimes it has to stop until a new driver can be driven to the nearest convenient place that they can take over. The trains are assembled and broken up into shorter sections using the line. The same train can pass through the same stretch of track two or three times, reversing direction.
For the freight operations, a delay is inconvenient, but it can be accomodated and it doesn't make a huge difference. There's enough padding in the schedules that it shouldn't stop a ship sailing, for example.
For passenger operations it's a huge problem. The West Coast Express has had terrible
problems in recent years, and despite attempts to improve things
they continued . It would be just the same through The Cut. It's why CP aren't interested in expanding WCE service - they can sort out any delays to freight, but the passenger service complicates things more.