Quote:
Originally Posted by ssiguy
It's also important to remember that, as I stated before, Ontario decided to plan for the future which is why their GO system can expand at such a dizzying rate.
20 years ago, Metrolinx began buying up rail corridors knowing they will need them in the future and it has turned out to be a very good investment. GO now owns 340km of track covering all of it inner suburban routes within a 60km radius of downtown save the Milton line. This is going to allow GO, once electrified by 2026, to provide a whopping 8,000 trips per week and possibly 10,000 by 2030. This is Metro/subway style service at a fraction of the cost.
A basic bus service may suffice for now and that's fine but you don't plan for tomorrow, you plan for 30, 50, or 100 years from now. Translink/BC should start buying up any and all rail it can get it's hands on and keep buying it as well as "working" with CN/CP. As GO found out, you would be amazed how notoriously uncooperative CN/CP are willing to be to sell unneeded rail lines/corridors until you wave a fat cheque in front of their face.
Either Translink/BC plans now or we are going to have to build SkyTrain to Chilliwack at 10X the price with half the speed.
|
Also a fraction of the ridership. 10,000/week is about 1,500/day; the Canada Line, despite being "underbuilt," gets 150,000/day. You're also conveniently ignoring how GO's still paying ~$17 billion even though they own the corridor.
TransLink IS planning for the far future. It's not just the far future you want them to plan for. Like it or not,
1) the GVRD is just as snarled in traffic as the Valley,
2) politics and proportional representation means BC only has enough money to serve one at a time, and
3) there's more potential riders in the city.
Once again, it's $8 billion or more to get to Abbotsford and Chilliwack. Why pay for two SkyTrains to get 1k, when you can pay for one SkyTrain to get 150k? Abby and Chilliwack aren't even part of TransLink! And which corridor, assuming one is even for sale, would get you there in a reasonable time?
The interurban, even without all the freight trains, would take an hour just to reach
Langley from
Surrey. That's over three hours to Chilliwack.
Extending the WCE from Mission skips most of the Valley's ridership base, which wants to go to Surrey and Langley.
So your best option is the middle of the TCH, followed by a tunnel into King George/Scott Road/whatever works best, and that's pricey too.
Total ridership?
3,900. Total Langley extension ridership?
80,000. The Valley will have to wait.