Quote:
Originally Posted by swimmer_spe View Post
I would assume this would fall under Via and Amtrak because:
1) it crosses international borders
2) it crosses more than 1 state line (potentially)

This project could stir massive funding elsewhere in Canada for HSR. It could be the kick this country needs for real passenger service funding.
VIA and Amtrak operate the Maple Leaf between New York and Toronto using Amtrak trains, but VIA crew in Canada and Amtrak crew in the US. That doesn't seem to work in the same way when the distance inside Canada is so short. It might be all Amtrak, like the Cascades, but I would assume it's going to have a significant private sector financing element and so would be a separate entity. Is there a reason why a train operated by 'Am-Can HSR' couldn't cross an international border and state lines?
Reply With Quote
     
     
  #3022  
Old Posted Sep 23, 2022, 5:26 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
 
Join Date: Oct 2015
Posts: 10,193
Quote:
Originally Posted by swimmer_spe View Post
Lets say each of those take 5 years. There are about 6 more lines/extensions to be done. If each take 5 years, and this current one is on time, that easily takes us to the 2050s or later.

Regardless, I feel this will fall under Via and will see federal funding. Translink won't be spending anything on it.
Sounds about right, unless we get another 2-for-1 deal like Broadway and Langley Phase 1.

Doesn't matter whether or not TransLink's doing the spending: Victoria doesn't usually pay for that many transit projects at once, and if so, SkyTrain v. HSR is a pretty obvious choice. The feds are likely to do a QC-Windsor train before Cascadia.
Reply With Quote
     
     
  #3023  
Old Posted Sep 23, 2022, 5:28 AM
swimmer_spe swimmer_spe is offline
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Changing City View Post
VIA and Amtrak operate the Maple Leaf between New York and Toronto using Amtrak trains, but VIA crew in Canada and Amtrak crew in the US. That doesn't seem to work in the same way when the distance inside Canada is so short. It might be all Amtrak, like the Cascades, but I would assume it's going to have a significant private sector financing element and so would be a separate entity. Is there a reason why a train operated by 'Am-Can HSR' couldn't cross an international border and state lines?
You need charters to legally operate trains in various locales. With the kind of red tape to do anything these days, it makes sense that it would not be run by a private entity. If it were just in the States, then it may be possible.
Reply With Quote
     
     
  #3024  
Old Posted Sep 23, 2022, 5:30 AM
swimmer_spe swimmer_spe is offline
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Migrant_Coconut View Post
Sounds about right, unless we get another 2-for-1 deal like Broadway and Langley Phase 1.

Doesn't matter whether or not TransLink's doing the spending: Victoria doesn't usually pay for that many transit projects at once, and if so, SkyTrain v. HSR is a pretty obvious choice. The feds are likely to do a QC-Windsor train before Cascadia.
If The US government and Amtrak said they would built to the Border, but Canada needs to chip in the rest, I could see this happening. It would then give the government a reason to reinvest in Via and could see lines along the Corridor, and possibly an Edmonton - Calgary HSR, like Albertans want.
Reply With Quote
     
     
  #3025  
Old Posted Sep 23, 2022, 5:37 AM
Changing City's Avatar
Changing City Changing City is offline
 
Join Date: Nov 2016
Posts: 8,370
Quote:
Originally Posted by swimmer_spe View Post
You need charters to legally operate trains in various locales. With the kind of red tape to do anything these days, it makes sense that it would not be run by a private entity. If it were just in the States, then it may be possible.
Do CN and CP run trains into the US? If so, why couldn't a passenger rail company get a charter?
Reply With Quote
     
     
  #3026  
Old Posted Sep 23, 2022, 5:41 AM
swimmer_spe swimmer_spe is offline
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Changing City View Post
Do CN and CP run trains into the US? If so, why couldn't a passenger rail company get a charter?
Any company could potentially get a charter. The problem is whether they would see it as a profitable venture.It could also delay the opening of the line. It is not whether a company can, but whether a company sees the worth in it.
Reply With Quote
     
     
  #3027  
Old Posted Sep 23, 2022, 5:47 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
 
Join Date: Oct 2015
Posts: 10,193
Quote:
Originally Posted by swimmer_spe View Post
If The US government and Amtrak said they would built to the Border, but Canada needs to chip in the rest, I could see this happening. It would then give the government a reason to reinvest in Via and could see lines along the Corridor, and possibly an Edmonton - Calgary HSR, like Albertans want.
You forgot the part where BC's nowhere near Ontario or Quebec and so doesn't ever get that much federal money at once.
Reply With Quote
     
     
  #3028  
Old Posted Sep 23, 2022, 5:50 AM
Changing City's Avatar
Changing City Changing City is offline
 
Join Date: Nov 2016
Posts: 8,370
Quote:
Originally Posted by swimmer_spe View Post
Any company could potentially get a charter. The problem is whether they would see it as a profitable venture.It could also delay the opening of the line. It is not whether a company can, but whether a company sees the worth in it.
I don't think Amtrak have a magic bottomless purse either. The whole idea of a Cascades HSR will be based on a long-term business case and a huge public subsidy to get it going. There are examples around the world of private sector businesses (like Eurostar) operating trains that cross international borders. The more private financing might play a role, the more likely a multi-billion-dollar system might get built, so rather than delay it, it might speed it up. Probably not for several decades - see the California HSR (with no borders to cross) for reasons why.
Reply With Quote
     
     
  #3029  
Old Posted Sep 23, 2022, 5:51 AM
swimmer_spe swimmer_spe is offline
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Migrant_Coconut View Post
You forgot the part where BC's nowhere near Ontario or Quebec and so doesn't ever get that much federal money at once.
While that is true, a government looking for votes may wish to throw some money to an area that might vote for it. What better photo op for a campaign than something like this to say that they are not forgotten?
Reply With Quote
     
     
  #3030  
Old Posted Sep 23, 2022, 5:56 AM
swimmer_spe swimmer_spe is offline
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Changing City View Post
I don't think Amtrak have a magic bottomless purse either. The whole idea of a Cascades HSR will be based on a long-term business case and a huge public subsidy to get it going. There are examples around the world of private sector businesses (like Eurostar) operating trains that cross international borders. The more private financing might play a role, the more likely a multi-billion-dollar system might get built, so rather than delay it, it might speed it up. Probably not for several decades - see the California HSR (with no borders to cross) for reasons why.
Comparing this to the one in California shows why this is going to be done by agencies already federally subsidized.
Reply With Quote
     
     
  #3031  
Old Posted Sep 23, 2022, 5:56 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
 
Join Date: Oct 2015
Posts: 10,193
Quote:
Originally Posted by swimmer_spe View Post
While that is true, a government looking for votes may wish to throw some money to an area that might vote for it. What better photo op for a campaign than something like this to say that they are not forgotten?
The same area that already votes their way (Liberal/NDP) to begin with?
Reply With Quote
     
     
  #3032  
Old Posted Sep 23, 2022, 6:24 AM
scottN scottN is offline
 
Join Date: Mar 2019
Posts: 286
If we (BC, Canada) are only expected to pay for the HSR line capital costs from the border to Scott Road (about 1/6th of the total distance to Seattle, nevermind the continuation to Portland), then it's a steal.
Reply With Quote
     
     
  #3033  
Old Posted Sep 23, 2022, 6:35 AM
casper's Avatar
casper casper is offline
 
Join Date: Nov 2011
Posts: 13,041
Quote:
Originally Posted by swimmer_spe View Post
You need charters to legally operate trains in various locales. With the kind of red tape to do anything these days, it makes sense that it would not be run by a private entity. If it were just in the States, then it may be possible.
The Rocky Mountaineer (in pre-covid time) did extend some of their trains down to Seattle. Those trains did not use the Rocky Mountaineer station but instead Pacific Central so they could do customs/immigration clearance of passengers.

This train is not a normal Amtrak route. It is basically funded through some agreement between the Washington and Oregon departments of Transportation. They then contract Amtrak as the operator. I believe the trains are not even owned by Amtrak but the states.

Quote:
Originally Posted by Changing City View Post
Do CN and CP run trains into the US? If so, why couldn't a passenger rail company get a charter?
Yes. In fact both CN and CP are major owners of railway track in the US and stretch all the way down to and into Mexico.

Quote:
Originally Posted by Migrant_Coconut View Post
You forgot the part where BC's nowhere near Ontario or Quebec and so doesn't ever get that much federal money at once.
The feds are very careful on this. When they create some program they usually want to divide the spend based on the population that province has. For transit they will go BC and say we have a pot of X dollars to spend in BC, what projects do you want to consider.
Reply With Quote
     
     
  #3034  
Old Posted Sep 23, 2022, 3:47 PM
Changing City's Avatar
Changing City Changing City is offline
 
Join Date: Nov 2016
Posts: 8,370
Quote:
Originally Posted by swimmer_spe View Post
Comparing this to the one in California shows why this is going to be done by agencies already federally subsidized.
The California project has federal funding. The Cascadia Ultra High Speed Rail Study is led by WSDOT, and the most recent project report looked at the establishment of a formal Coordinating Entity to get the project moving and later once funding is secured, a Development Entity, similar to the California project. Amtrak are not mentioned once.
Reply With Quote
     
     
  #3035  
Old Posted Sep 23, 2022, 5:54 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
 
Join Date: Oct 2015
Posts: 10,193
Quote:
Originally Posted by casper View Post
The feds are very careful on this. When they create some program they usually want to divide the spend based on the population that province has. For transit they will go BC and say we have a pot of X dollars to spend in BC, what projects do you want to consider.
Eeyup, and the SkyTrain network gets 90% of those dollars (and rightfully so).
Reply With Quote
     
     
  #3036  
Old Posted Sep 23, 2022, 10:03 PM
MistyMountain MistyMountain is offline
 
Join Date: May 2020
Posts: 72
Quote:
Originally Posted by Migrant_Coconut View Post
Those are some pretty big "ifs" - there's a good chance that 100% of service will be between Vancouver and Portland, in which case Surrey service would be filled by local-service trains coming and going from Bellingham. No-go on the Valley.

Also, the 2055 ridership estimate is 3.3 million riders a year: a pretty bad ridership-cost ratio when you realize the Canada Line does that every three weeks. A tunnel should get the green light, but not ahead of all the other projects we've got.

Hard to tell. Depends on what's left by then; without billions of federal or private sector funding, a downtown HSR tunnel should be somewhere between a West End and a Canada Line extension.
This is a meaningless comparison; regional public transit can't be compared to inter-city travel. New York City subway and commuter rail alone transported 4 billion people a year pre-COVID, compared to ~1 billion for air travel in the entire country. That doesn't mean we shouldn't invest in airports.

Of course a train between Vancouver and Seattle would have lower ridership that other local transit projects, but we're trying to replace cross border road and air travel, not daily commutes.

As I sketched out here you could use the HSR backbone to set up a regional rail network through Surrey, and then use existing rail corridors to go to White Rock, Abbotsford, Chilliwack and potentially Tsawwassen. There would be plenty of capacity to run both HSR trains and a regional rail train every 10-15 minutes. Once you have the $4.5B link from Surrey to Vancouver set up you can build that for ~$1B because you just need to add extra rail and station infrastructure.

Reply With Quote
     
     
  #3037  
Old Posted Sep 23, 2022, 11:06 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
 
Join Date: Oct 2015
Posts: 10,193
Quote:
Originally Posted by MistyMountain View Post
This is a meaningless comparison; regional public transit can't be compared to inter-city travel. New York City subway and commuter rail alone transported 4 billion people a year pre-COVID, compared to ~1 billion for air travel in the entire country. That doesn't mean we shouldn't invest in airports.

Of course a train between Vancouver and Seattle would have lower ridership that other local transit projects, but we're trying to replace cross border road and air travel, not daily commutes.

As I sketched out here you could use the HSR backbone to set up a regional rail network through Surrey, and then use existing rail corridors to go to White Rock, Abbotsford, Chilliwack and potentially Tsawwassen. There would be plenty of capacity to run both HSR trains and a regional rail train every 10-15 minutes. Once you have the $4.5B link from Surrey to Vancouver set up you can build that for ~$1B because you just need to add extra rail and station infrastructure.
No plan survives contact with the finance department. Airports are critical infrastructure, yes, but YVR and many others are also self-funding; we don't even know if the HSR would break even during operations.

GO in Ontario is expanding at the ballpark cost of $90m/km, and it's over 90km from Tsawwassen to Chilliwack. That's a whole lot more than $1b.

Are municipal rail and regional rail an apples and oranges comparison? Yes. Are the provincial accountants likely to see it that way? No.
Is Victoria likely to spend $4.5 billion on 9,000 tourists/day ahead of 150,000 Canadian commuters/day? No.
Is Victoria likely to spend another $8+ billion on even less ridership out to the Valley? No.
Is the operator of the HSR likely to even allow non-HSR trains to use their ROW? Probably not.

One more time: BC's already run the numbers and determined that a simple high-frequency bus network in the Valley would actually get more riders than a train. So they'll likely do that instead and revisit rail in another thirty years.

Last edited by Migrant_Coconut; Sep 23, 2022 at 11:22 PM. Reason: Fixed link
Reply With Quote
     
     
  #3038  
Old Posted Sep 23, 2022, 11:33 PM
Sheba Sheba is offline
 
Join Date: Jan 2015
Posts: 4,598
Quote:
Originally Posted by Migrant_Coconut View Post
Are municipal rail and regional rail an apples and oranges comparison? Yes. Are the provincial accountants likely to see it that way? No.
Is Victoria likely to spend $4.5 billion on 9,000 tourists/day ahead of 150,000 Canadian commuters/day? No.
Is Victoria likely to spend another $8+ billion on even less ridership out to the Valley? No.
Is the operator of the HSR likely to even allow non-HSR trains to use their ROW? Probably not.
Exactly (esp that last one - some people on here assume it'll be a shared ROW)
Reply With Quote
     
     
  #3039  
Old Posted Sep 24, 2022, 12:54 AM
swimmer_spe swimmer_spe is offline
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Changing City View Post
The California project has federal funding. The Cascadia Ultra High Speed Rail Study is led by WSDOT, and the most recent project report looked at the establishment of a formal Coordinating Entity to get the project moving and later once funding is secured, a Development Entity, similar to the California project. Amtrak are not mentioned once.
It is a federal funded project, but they must ensure it receives no subsidy when operating. That is not how Via or Amtrak work.
Reply With Quote
     
     
  #3040  
Old Posted Sep 24, 2022, 5:27 AM
Changing City's Avatar
Changing City Changing City is offline
 
Join Date: Nov 2016
Posts: 8,370
Quote:
Originally Posted by swimmer_spe View Post
It is a federal funded project, but they must ensure it receives no subsidy when operating. That is not how Via or Amtrak work.
The reason that the California project must ensure ridership revenues are sufficient to cover the operations and maintenance costs of the program is to comply with Proposition 1A, which authorized the bonds that funded part of the state's contribution to the costs.

That doesn't apply (yet) to Cascadia because the sources of funding haven't been identified, and certainly not confirmed. (Neither have the costs - $24 to $42 billion at last estimate). The project may never have to be revenue neutral, but it may be a requirement of funding, just as it is in California - the latest report from WSDOT (linked above) indicates the intention of trying to operate the system at least at break-even. It certainly doesn't say anything about who might operate any future service.

The existing service is irrelevant - Amtrak Cascades runs on freight company tracks and was subsidized by Washington (and Oregon) by over a third of the $50m operating costs in 2018. Oregon and Washington also paid for most of the train sets (although it's temporarily running with old Amtrak trains while new ones are being built in California).

If it's ever built, the new service will run on its own tracks, have its own train sets, and its own corporation owning the operation. Amtrak could be the operator, but so could an entirely separate company and unlike on the East Coast, Amtrak don't seem to have been involved in the west coast high speed rail at all - it's all WSDOT led.

I have no idea why you're obsessed with suggesting Amtrak are the most likely to have a role, but up to now they haven't had one and there's absolutely no reason why state and federal funds (likely to be the main sources of funding at least for the initial construction) shouldn't support an independent operation.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
   
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:41 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.