HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Sep 3, 2022, 1:05 PM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,900
From the article on the east end bridge geotechnical studies:

Quote:
Chief William Commanda Bridge

The disused rail crossing at Lemieux Island, formerly known as the Prince of Wales Bridge, is being modernized for use as a pedestrian and bicycle link connecting the Multi-use Pathways in Ottawa and Gatineau. The bridge is expected to open in 2024. The $22-million project is funded with $14 million from the City of Ottawa and $8.6 million from federal infrastructure and public transit grants.
2024 opening? Wasn't it supposed to be last Fall? And then this Fall? Now it's a full two years to convert an existing bridge for pedestrians and cyclists?
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 8:05 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.