Quote:
Originally Posted by Maldive
Not sure what your point is given my 350 Bloor East example where this is exactly what they are proposing to do.
Difficult? Perhaps.
A challenging feat of engineering? Doubt it. Maybe a whole new layer grafted on to the back of the concrete. Whatever, seems doable...
|
I can't comment on the plan for 350 Bloor. I don't know whether they will strip the panels and install them on a new structure, keep half the structure standing with the heavy loads precariously hanging on while they shake, rattle and roll around it or, simply recreate the look with new panels. Perhaps, the facade is cast in place.
Precast panels were stripped from 488 University and replaced with a glass facade. The panels on Simpson had anchor bolt driven through them and then covered up. Deteriorated concrete tiles and panels have been stripped from towers from Calgary to Montreal. Whatever happens at 350 Bloor is an outlier.