  #261  
Old Posted Aug 11, 2022, 4:40 PM
originalmuffins originalmuffins is offline
 
Join Date: Jun 2018
Posts: 877
I mean yeah Claridge hasn't been perfect but this plan is separate to the rest of Lebreton so it won't be hindered by any slowdowns of the rest of the area. Their plan actually looks decent with decent mixed use and variations in height. If they can somehow force a swing to that 45 floor building to come back with a plethora of street level retail / services, then Lebreton East will be a success, especially because the towers actually have a good potential to come out looking decent. This and that 60 floor building on Carling are two Claridge projects I hope they get started on ASAP because they will definitely change our skyline very fast.
Reply With Quote
     
     
  #262  
Old Posted Aug 11, 2022, 8:16 PM
ponyboycurtis's Avatar
ponyboycurtis ponyboycurtis is offline
 
Join Date: Apr 2021
Posts: 1,693
Quote:
Originally Posted by J.OT13 View Post
can't say I'm a fan of the Claridge Plazas. Pretty terrible all around IMO, but certainly not the worse in the City. I prefer Moon. The Metcalfe street level especially is very well done. The third and fourth phase of LeBreton is pretty good as well all around.
I know what you mean. I'm just trying not to lump on everything all the time. I'm just saying CP above the podiums are passable. Moon is decent .. and Royale so far is possibly better. Claridge seems to be upping their game. That tracks with most human beings. I do better work than I did 20 years ago.

My friends know me as that guy who walks around downtown yelling at buildings and inanimate structures. Despite my irrational anger I do try to see the upside if I can.
Reply With Quote
     
     
  #263  
Old Posted Aug 11, 2022, 9:39 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Quote:
Originally Posted by ponyboycurtis View Post
I know what you mean. I'm just trying not to lump on everything all the time. I'm just saying CP above the podiums are passable. Moon is decent .. and Royale so far is possibly better. Claridge seems to be upping their game. That tracks with most human beings. I do better work than I did 20 years ago.
Passable. Yeah, that's more like it!

They have improved. But like Pinnacle at Laurier and Lyon was better than most of their projects, even if it was built 15 odd years ago. Kind of a stand out for them, design wise IMO.

Quote:
My friends know me as that guy who walks around downtown yelling at buildings and inanimate structures. Despite my irrational anger I do try to see the upside if I can.
Reply With Quote
     
     
  #264  
Old Posted Aug 29, 2022, 7:41 PM
Harley613's Avatar
Harley613 Harley613 is offline
 
Join Date: Jun 2009
Posts: 6,896
Reply With Quote
     
     
  #265  
Old Posted Aug 29, 2022, 10:09 PM
SL123 SL123 is offline
 
Join Date: Mar 2021
Posts: 1,980
I dont understand this project! are they building 1 or both towers? The base seem bigger than 1 tower but also not enough for both towers.
Reply With Quote
     
     
  #266  
Old Posted Aug 29, 2022, 10:18 PM
rocketphish's Avatar
rocketphish rocketphish is offline
 
Join Date: Feb 2009
Posts: 14,722
Quote:
Originally Posted by SL123 View Post
I dont understand this project! are they building 1 or both towers? The base seem bigger than 1 tower but also not enough for both towers.
Go back a page to post 254.
Reply With Quote
     
     
  #267  
Old Posted Aug 29, 2022, 10:18 PM
Harley613's Avatar
Harley613 Harley613 is offline
 
Join Date: Jun 2009
Posts: 6,896
Quote:
Originally Posted by SL123 View Post
I dont understand this project! are they building 1 or both towers? The base seem bigger than 1 tower but also not enough for both towers.
I can't figure that out either. Claridge projects seem to have the most play in Ottawa between 'Approval' and 'Built' though, the public doesn't get in on the last minute changes.

Last edited by Harley613; Aug 29, 2022 at 11:11 PM.
Reply With Quote
     
     
  #268  
Old Posted Aug 29, 2022, 10:20 PM
Harley613's Avatar
Harley613 Harley613 is offline
 
Join Date: Jun 2009
Posts: 6,896
Quote:
Originally Posted by rocketphish View Post
Go back a page to post 254.
That's a theory, but doesn't offer any clarity.
Reply With Quote
     
     
  #269  
Old Posted Aug 30, 2022, 12:38 AM
Char_Arch Char_Arch is offline
 
Join Date: May 2022
Posts: 21
Hey! So Claridge proposed for the current site TWO 5 storey podiums one with 25 floors and the other with 30 above. I think people are confusing the 45 storey from another phase of the eventual "Claridge Vision" for LeBreton Flats.



From Their Site Plan Application in 2020

http://webcast.ottawa.ca/plan/All_Image%...0Design%20Brief%20-%20D07-12-20-0074.PDF

Last edited by Char_Arch; Aug 30, 2022 at 12:39 AM. Reason: I dont know how images work
Reply With Quote
     
     
  #270  
Old Posted Aug 30, 2022, 12:41 AM
Harley613's Avatar
Harley613 Harley613 is offline
 
Join Date: Jun 2009
Posts: 6,896
Quote:
Originally Posted by Char_Arch View Post
Hey! So Claridge proposed for the current site TWO 5 storey podiums one with 25 floors and the other with 30 above. I think people are confusing the 45 storey from another phase of the eventual "Claridge Vision" for LeBreton Flats.



From Their Site Plan Application in 2020

http://webcast.ottawa.ca/plan/All_Image%...0Design%20Brief%20-%20D07-12-20-0074.PDF
I don't think anyone is wondering about the 45 story building. It looks like they are digging out the garage underneath the 30 story building and the road access between the the 30 story and the 25 story, but not even starting the 25 story.

Welcome to the forum
Reply With Quote
     
     
  #271  
Old Posted Aug 30, 2022, 12:43 AM
SL123 SL123 is offline
 
Join Date: Mar 2021
Posts: 1,980
Quote:
Originally Posted by Char_Arch View Post
Hey! So Claridge proposed for the current site TWO 5 storey podiums one with 25 floors and the other with 30 above. I think people are confusing the 45 storey from another phase of the eventual "Claridge Vision" for LeBreton Flats.



From Their Site Plan Application in 2020

http://webcast.ottawa.ca/plan/All_Image%...0Design%20Brief%20-%20D07-12-20-0074.PDF
My confusion is more wether or not Claridge is phasing in two the construction of the 25 and 30 stories building or building the whole thing at the same time. its hard to tell from what we can see so far.
Reply With Quote
     
     
  #272  
Old Posted Aug 30, 2022, 1:14 AM
Char_Arch Char_Arch is offline
 
Join Date: May 2022
Posts: 21
Quote:
Originally Posted by SL123 View Post
My confusion is more wether or not Claridge is phasing in two the construction of the 25 and 30 stories building or building the whole thing at the same time. its hard to tell from what we can see so far.
hmmm not sure how to reply to two people... so this is to both of you.. [and thanks for the welcome!] [images still dont work for me] Yeah I'm confused now. Based on their site plan application including architectural plans the podiums should be connected underground with a connected parking structure. the plans are not matching reality atm. On page 5 of the plan below you will see that

http://webcast.ottawa.ca/plan/All_Image%...tural%20Package%20-%20D07-12-20-0074.PDF

Seems they just cut off the parking in-between gridlines 7 and 8

Last edited by Char_Arch; Aug 30, 2022 at 1:23 AM. Reason: words
Reply With Quote
     
     
  #273  
Old Posted Aug 30, 2022, 7:01 AM
originalmuffins originalmuffins is offline
 
Join Date: Jun 2018
Posts: 877
Quote:
Originally Posted by Char_Arch View Post
hmmm not sure how to reply to two people... so this is to both of you.. [and thanks for the welcome!] [images still dont work for me] Yeah I'm confused now. Based on their site plan application including architectural plans the podiums should be connected underground with a connected parking structure. the plans are not matching reality atm. On page 5 of the plan below you will see that

http://webcast.ottawa.ca/plan/All_Image%...tural%20Package%20-%20D07-12-20-0074.PDF

Seems they just cut off the parking in-between gridlines 7 and 8
Welcome! If you want to insert an image, upload to IMGUR, copy the URL from the image you upload then insert that into the IMG section (it's the mountain yellow icon).

Thanks for the design brief, I forgot about that and gave a good refresh of their plan. Like I said, I think this plan is one of their better ones but I do wish they had more retail:

7800 sq ft in retail only BUT it does have:
- 4150 sq ft (roughly) for daycare, and
- 110,000 sq ft for amenities (could mean gym or something along those lines, which would be needed in the area).

Two 25 floor towers, two 30 floor towers, and one 45 floor tower. I wish they can bump up one of the 30 floors to 35 (or 40) and the 45 to 55 but that's just my wishful thinking lol.

The Aqueduct Park inclusion is good greenspace beside those towers too.
Reply With Quote
     
     
  #274  
Old Posted Aug 30, 2022, 9:46 AM
Harley613's Avatar
Harley613 Harley613 is offline
 
Join Date: Jun 2009
Posts: 6,896
I suggest Flickr over Imgur because a lot of us have Imgur blocked at our workplaces. I know some (maybe all) federal departments have Imgur blocked. Also, Flickr has really great options for controlling the resolution of your share
Reply With Quote
     
     
  #275  
Old Posted Aug 30, 2022, 12:39 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Quote:
Originally Posted by Char_Arch View Post
hmmm not sure how to reply to two people... so this is to both of you.. [and thanks for the welcome!] [images still dont work for me]
To reply to two people, the only way is to "Quote" the first, copy the "Quote", back track, "Quote" the second, and copy the first "Quote".

Quote:
Originally Posted by Harley613 View Post
I suggest Flickr over Imgur because a lot of us have Imgur blocked at our workplaces. I know some (maybe all) federal departments have Imgur blocked. Also, Flickr has really great options for controlling the resolution of your share
Need an account with Flickr though, right? I used to use Imgur, but I find it lost it's user friendliness. Now I use Postimages. Don't know if that has the same visibility problem at many workplaces.
Reply With Quote
     
     
  #276  
Old Posted Aug 30, 2022, 7:52 PM
ponyboycurtis's Avatar
ponyboycurtis ponyboycurtis is offline
 
Join Date: Apr 2021
Posts: 1,693
Quote:
Originally Posted by Harley613 View Post
I don't think anyone is wondering about the 45 story building. It looks like they are digging out the garage underneath the 30 story building and the road access between the the 30 story and the 25 story, but not even starting the 25 story.

Welcome to the forum
This is also my conclusion. I find it strange that they wouldn't have at least excavated all the way up to Fleet st. though and built the entire garage in one go even if both towers were built separately. It's not like they don't have a pile of space around to use as a staging area. Lloyd st. wouldn't be used by anyone but them at the moment.

Seems like a bean counter issue to save a few bucks at the expense of everyone who moves into the first tower. At least Moon and Royale are getting built sensibly. Although I suspect that's because it's a busier area and the city wouldn't want a protracted project there? Especially Royale.

I use Flickr. It has 1000 images and seemingly unlimited albums with the free account. You can also do some basic editing right there in the browser and as someone else pointed out it's very easy to re-size when sharing the link here.
Reply With Quote
     
     
  #277  
Old Posted Aug 31, 2022, 12:13 AM
Harley613's Avatar
Harley613 Harley613 is offline
 
Join Date: Jun 2009
Posts: 6,896
Quote:
Originally Posted by ponyboycurtis View Post
This is also my conclusion. I find it strange that they wouldn't have at least excavated all the way up to Fleet st. though and built the entire garage in one go even if both towers were built separately. It's not like they don't have a pile of space around to use as a staging area. Lloyd st. wouldn't be used by anyone but them at the moment.

Seems like a bean counter issue to save a few bucks at the expense of everyone who moves into the first tower. At least Moon and Royale are getting built sensibly. Although I suspect that's because it's a busier area and the city wouldn't want a protracted project there? Especially Royale.

I use Flickr. It has 1000 images and seemingly unlimited albums with the free account. You can also do some basic editing right there in the browser and as someone else pointed out it's very easy to re-size when sharing the link here.
It seems this site is similar to 'WE2' across the way in Quebexico, where they are building the 13 story building right before they dig out the 26 story tower on the same lot. I understand building in phases on the same lot back to back, like they are at 400 Albert, because a second developer bought in for the third tower there, but I do find it unpalatable to build single developer rentals in this fashion. Getting a few hundred people in paid leases as fast as possible, and letting them suffer the pain of having the next few hundred people's place being built a few feet away...
Reply With Quote
     
     
  #278  
Old Posted Aug 31, 2022, 12:18 AM
Char_Arch Char_Arch is offline
 
Join Date: May 2022
Posts: 21
Agreed, is it that far out of left base to say they may have just cancelled the northern portion of the garage.
Looks like they would loose out on around 71 parking spaces.
They have no minimum requirement due to the proximity to the LRT station and being downtown.



Also another cool fact: Within the bylaw exception for this property, there's requirement that there is at least 1 bike parking spot per unit. Love to see it!

Last edited by rocketphish; Aug 31, 2022 at 12:25 AM. Reason: Fixed malformed image link
Reply With Quote
     
     
  #279  
Old Posted Aug 31, 2022, 12:27 AM
rocketphish's Avatar
rocketphish rocketphish is offline
 
Join Date: Feb 2009
Posts: 14,722
Quote:
Originally Posted by Char_Arch View Post
Still can't link images
See here for help linking images:
https://skyscraperpage.com/forum/showthread.php?t=246386
Reply With Quote
     
     
  #280  
Old Posted Aug 31, 2022, 12:25 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Anyone know how they did it at Minto Place and Constitution Square? Did they phase in the garage with the towers or completed the garage in the first phase and added towers later?

I know they built the entire World Exchange garage in one shot, though that may have been an NCC requirement.

Or if we look at residential, how were Claridge Plazas and Tribeca done?
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 6:26 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.