Quote:
Originally Posted by Char_Arch
hmmm not sure how to reply to two people... so this is to both of you.. [and thanks for the welcome!] [images still dont work for me] Yeah I'm confused now. Based on their site plan application including architectural plans the podiums should be connected underground with a connected parking structure. the plans are not matching reality atm. On page 5 of the plan below you will see that
http://webcast.ottawa.ca/plan/All_Image%...tural%20Package%20-%20D07-12-20-0074.PDF
Seems they just cut off the parking in-between gridlines 7 and 8
|
Welcome! If you want to insert an image, upload to IMGUR, copy the URL from the image you upload then insert that into the IMG section (it's the mountain yellow icon).
Thanks for the design brief, I forgot about that and gave a good refresh of their plan. Like I said, I think this plan is one of their better ones but I do wish they had more retail:
7800 sq ft in retail only BUT it does have:
- 4150 sq ft (roughly) for daycare, and
- 110,000 sq ft for amenities (could mean gym or something along those lines, which would be needed in the area).
Two 25 floor towers, two 30 floor towers, and one 45 floor tower. I wish they can bump up one of the 30 floors to 35 (or 40) and the 45 to 55 but that's just my wishful thinking lol.
The Aqueduct Park inclusion is good greenspace beside those towers too.