Quote:
Originally Posted by OTSkyline
That's all great and all, but most of that won't materialize for another 5-10 years maybe (other than LRT phase 2). So why buy and lock yourself in now to hopefully reap the rewards that far from now? I imagine a lot of people living in condos end up living there far shorter than people living in homes (much more transient living) so people who would've bought and moved in here at opening might've sold and relocated/upgraded by the time Lebreton comes to fruition.
|
Other than the arena, this already exists or will be complete within 4 years (although Trillium might be another 10, who the hell knows).
This situation with 1040 is bizarre. They just started building. When Claridge starts a project, they go all the way, even if it takes like 7 years (Icon).
The only other major project I've seen halted during construction in Ottawa was The Bowery by overly cautious Richcraft, which went by another name and the time (Edge?). It was a hole in the ground for quite a few years.
Of course, we've seen other examples elsewhere such as the Trump tower in Vancouver (since complete) and the Chicago Spire in Chicago.