Old Posted Jul 31, 2022, 3:47 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,161
Quote:
Originally Posted by chowhou View Post
Like Migrant_Coconut says in the other thread, it's a nice thing to have Japanese companies interested in BC, but they're not a charity. Construction still needs to be done with BC labour, to BC labour code, at BC prices. For Skytrain lines, the obvious easy profitable ridership is probably all spoken for now; The Expo Line servicing Downtown Vancouver through dense neighbourhoods like New Westminister and Metrotown to Downtown Surrey, The Canada Line servicing Downtown Vancouver via West Broadway to YVR and Downtown Richmond, and the Millennium Line soon to service Downtown Coquitlam through the dense neighbourhoods of Lougheed and Brentwood to West Broadway and UBC. JOIN as the name explicitly states is an investment company and they're going to want bang for their buck. Not sure how much money there is building a billion dollar bridge across Burrard Inlet, sad to say.
The article does say we could trim a little fat in the design process:

Quote:
(CDPQ spokesperson Emmanuelle Rouillard-Moreau) added that CDPQ has also been able to execute REM at a relatively quick pace as they “made a point of avoiding the linear approach to planning and construction,” which is a slower process used by TransLink and the BC government.

“Operating on a single track — with Decision A followed by Decision B followed by Decision C — can be a recipe for delay and inertia. Instead, we chose to function with a design-build model. We are moving along in parallel on several fronts, which means we are allowing for progress to begin immediately on certain aspects such as planning and land acquisitions while we are ironing out design elements and compliance,” continued Rouillard-Moreau.
How much? Probably not enough to make commuter rail to Delta or Chilliwack viable.
Reply With Quote
     
     
  #1402  
Old Posted Jul 31, 2022, 6:19 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is online now
Registered User
 
Join Date: May 2010
Posts: 4,790
Quote:
Originally Posted by chowhou View Post
Not sure how much money there is building a billion dollar bridge across Burrard Inlet, sad to say.
The justification for spending money on getting rapid transit across Burrard Inlet is to avoid the need to build or replace another road bridge. Every dollar spent on rapid transit will move more people than if it was spent on a highway bridge.

And for the inevitable "what about goods transportation?" crowd, the way to solve that problem is to toll the bridges in order to shift demand and make bridge capacity available for those uses. But it's not really feasible to toll the bridges and shift demand unless you provide people with an alternative - hence: rapid transit.
Reply With Quote
     
     
  #1403  
Old Posted Jul 31, 2022, 7:07 AM
chowhou's Avatar
chowhou chowhou is online now
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,800
Quote:
Originally Posted by aberdeen5698 View Post
The justification for spending money on getting rapid transit across Burrard Inlet is to avoid the need to build or replace another road bridge. Every dollar spent on rapid transit will move more people than if it was spent on a highway bridge.

And for the inevitable "what about goods transportation?" crowd, the way to solve that problem is to toll the bridges in order to shift demand and make bridge capacity available for those uses. But it's not really feasible to toll the bridges and shift demand unless you provide people with an alternative - hence: rapid transit.
Oh I super agree, but a foreign investment group doesn't really care about that.
Reply With Quote
     
     
  #1404  
Old Posted Jul 31, 2022, 4:09 PM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
what we should be doing is building a 3rd crossing for cars + transit, and then closing the lions gate to cars. leaving it only for emergency vehicles maybe the odd bus if it is still needed.

that would be ideal. unless we build another road crossing, the lions gate will always be needed for cars.
Reply With Quote
     
     
  #1405  
Old Posted Jul 31, 2022, 7:35 PM
Tvisforme's Avatar
Tvisforme Tvisforme is offline
Registered User
 
Join Date: Sep 2014
Location: Metro Vancouver
Posts: 2,162
Quote:
Originally Posted by VancouverOfTheFuture View Post
what we should be doing is building a 3rd crossing for cars + transit, and then closing the lions gate to cars. leaving it only for emergency vehicles maybe the odd bus if it is still needed.

that would be ideal. unless we build another road crossing, the lions gate will always be needed for cars.
I agree that, in the absence of a new crossing, the Lions Gate Bridge is an essential part of the road network. However, that still leaves us with the problem of where a new crossing would be located. Anywhere other than the existing locations would require substantial road networks to handle the redirected traffic flow, which would cause significant issues with the heavily developed lands on both sides of Burrard Inlet. Unfortunately, there's only one location that allows a easy, direct highway-to-highway connection and it already has a bridge.

As expensive as it might be, we might have to consider increased use of tunnels to address long-term traffic flow. I'm probably drifting into "infrastructure fantasy" territory here, but tunnelling Highway 1 from the Kensington area to Lynn Creek would allow the IWM to be refocussed on transit and local traffic. Then, as the IWM reaches the end of its lifespan (45 years or so from now according to Bowen Ma), the replacement could be designed and built with this local/transit focus instead of having to serve two purposes.
Reply With Quote
     
     
  #1406  
Old Posted Jul 31, 2022, 10:02 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,161
$496/km (Broadway tunnel rate) for 9.2 km... means we'll probably have to wait a while. That could pay for the North Shore Line and a few buses.
Reply With Quote
     
     
  #1407  
Old Posted Aug 1, 2022, 2:38 AM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888

Source: https://twitter.com/broadwaysubway_/status/1553063035224342531?cxt=HHwWhoCyhcSmy40rAAAA

Anyways back to the thread topic... July 29th Broadway Subway Project Twitter posted:
"#TrafficDeckCheck: At Broadway-City Hall Station, the final lane of traffic decking is nearly complete!

Crews are currently working to install girders and deck panels while traffic moves on the completed traffic deck lanes nearby."
Reply With Quote
     
     
  #1408  
Old Posted Aug 1, 2022, 3:45 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
did they do this decking for the Canada-Line? same idea, or different? i think they did, though i was younger back then and didnt pay attention to these things at the time.
Reply With Quote
     
     
  #1409  
Old Posted Aug 1, 2022, 3:58 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,188
Quote:
Originally Posted by VancouverOfTheFuture View Post
did they do this decking for the Canada-Line? same idea, or different? i think they did, though i was younger back then and didnt pay attention to these things at the time.
I believe no except for the cross streets. Most of Cambie has the centre median and north or King Ed was one lane each way. The N/S arterials are far easier to detour from than Broadway.
Reply With Quote
     
     
  #1410  
Old Posted Aug 1, 2022, 4:02 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,724
Think it was totally different since most of it was cut and cover. Maybe minus some east/west road crossings there was probably nothing this extensive.

Lots of photos here:

http://canadalinephotos.blogspot.com/

One of those bridges



http://thecanadaline.com/station-history/waterfront/
Reply With Quote
     
     
  #1411  
Old Posted Aug 1, 2022, 8:29 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,725
Has anyone noticed the massive temporary sewer pipe diversion pipe above ground on Cambie next to the Crossroads? It dives down under a lane and comes back up. There's a faint sewage smell when driving by.
Reply With Quote
     
     
  #1412  
Old Posted Aug 1, 2022, 3:05 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,652
Quote:
Originally Posted by officedweller View Post
Has anyone noticed the massive temporary sewer pipe diversion pipe above ground on Cambie next to the Crossroads? It dives down under a lane and comes back up. There's a faint sewage smell when driving by.
Yeah it's insane. The smell has been bad at ground level outside the last few days. Hopefully that passes.
Reply With Quote
     
     
  #1413  
Old Posted Aug 1, 2022, 3:35 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is online now
Registered User
 
Join Date: May 2010
Posts: 4,790
Quote:
Originally Posted by WarrenC12 View Post
Yeah it's insane. The smell has been bad at ground level outside the last few days. Hopefully that passes.
It won't pass unless the citizens upstream stop passing...
Reply With Quote
     
     
  #1414  
Old Posted Aug 1, 2022, 4:34 PM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by jollyburger View Post
Think it was totally different since most of it was cut and cover. Maybe minus some east/west road crossings there was probably nothing this extensive.

Lots of photos here:

http://canadalinephotos.blogspot.com/

One of those bridges



http://thecanadaline.com/station-history/waterfront/
interesting. thanks for that. i have some memories of driving over some bridges back then. i think at city hall. thats about it though.

but boy has photo technology changed in 15yrs.
Reply With Quote
     
     
  #1415  
Old Posted Aug 1, 2022, 6:01 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,724
Quote:
Originally Posted by WarrenC12 View Post
Yeah it's insane. The smell has been bad at ground level outside the last few days. Hopefully that passes.
Imagine if it sprung a leak
Reply With Quote
     
     
  #1416  
Old Posted Aug 1, 2022, 10:21 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,725
Quote:
Originally Posted by jollyburger View Post
Imagine if it sprung a leak
That came to mind - but there are lots of bolts holding the joints tightly in place.
Reply With Quote
     
     
  #1417  
Old Posted Aug 2, 2022, 2:27 AM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,652
Quote:
Originally Posted by aberdeen5698 View Post
It won't pass unless the citizens upstream stop passing...
I was wondering if there was a small air leak that could be sealed.

The super hot weather isn't helping either I imagine.
Reply With Quote
     
     
  #1418  
Old Posted Aug 3, 2022, 6:17 AM
kev_427 kev_427 is offline
Registered User
 
Join Date: Mar 2011
Location: Kelowna
Posts: 133
Quote:
Originally Posted by VancouverOfTheFuture View Post
what we should be doing is building a 3rd crossing for cars + transit, and then closing the lions gate to cars. leaving it only for emergency vehicles maybe the odd bus if it is still needed.

that would be ideal. unless we build another road crossing, the lions gate will always be needed for cars.
Is building a 3rd crossing and turning the Lions Gate into a bridge for a North Shore skytrain something that has been considered?
Reply With Quote
     
     
  #1419  
Old Posted Aug 3, 2022, 1:44 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,724
Quote:
Originally Posted by kev_427 View Post
Is building a 3rd crossing and turning the Lions Gate into a bridge for a North Shore skytrain something that has been considered?
Probably the last option on their list if they even considered it.
Reply With Quote
     
     
  #1420  
Old Posted Aug 3, 2022, 5:16 PM
FarmerHaight's Avatar
FarmerHaight FarmerHaight is offline
Peddling to progress
 
Join Date: Jul 2019
Location: Vancouver's West End
Posts: 1,631
Quote:
Originally Posted by kev_427 View Post
Is building a 3rd crossing and turning the Lions Gate into a bridge for a North Shore skytrain something that has been considered?
Because of the width and depth of Inner Harbour, First and Second Narrows are really the only place to put an above-grade crossing. So a 3rd crossing for vehicle traffic would likely be built alongside the Lionsgate bridge if that bridge were to be converted to transit-only.

If a 3rd crossing was built, it would probably be an above-grade transit-only crossing near IWM, or some sort of transit-only tunnel. Again, because of the depth of Inner Harbour that tunnel would either need to go close to First or Second Narrows, or be a submerged floating tunnel with all sorts of engineering and safety complications.
__________________
“Nothing compares to the simple pleasure of riding a bike” – John F Kennedy
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:28 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.